Open Access. Powered by Scholars. Published by Universities.®

Civil Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Construction Engineering and Management

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1591 - 1599 of 1599

Full-Text Articles in Civil Engineering

The Irish Plumber And Heating Contractor, September 1961 (Complete Issue) Sep 1961

The Irish Plumber And Heating Contractor, September 1961 (Complete Issue)

Building Services Engineering

No abstract provided.


The Irish Plumber And Heating Contractor, August 1961 (Complete Issue) Aug 1961

The Irish Plumber And Heating Contractor, August 1961 (Complete Issue)

Building Services Engineering

No abstract provided.


The Irish Plumber And Heating Contractor, July 1961 (Complete Issue) Jul 1961

The Irish Plumber And Heating Contractor, July 1961 (Complete Issue)

Building Services Engineering

No abstract provided.


The Irish Plumber And Heating Contractor, June 1961 (Complete Issue) Jun 1961

The Irish Plumber And Heating Contractor, June 1961 (Complete Issue)

Building Services Engineering

No abstract provided.


The Irish Plumber And Heating Contractor, May 1961 (Complete Issue) May 1961

The Irish Plumber And Heating Contractor, May 1961 (Complete Issue)

Building Services Engineering

No abstract provided.


The Irish Plumber And Heating Contractor, April 1961 (Complete Issue) Apr 1961

The Irish Plumber And Heating Contractor, April 1961 (Complete Issue)

Building Services Engineering

No abstract provided.


Location And Economic Study For Interstate Route Tallahassee, Wilbur Smith And Associates Nov 1957

Location And Economic Study For Interstate Route Tallahassee, Wilbur Smith And Associates

City and Regional Planning -- Florida

The basic purpose of the study was to determine the best location for the construction of an East-West section of the interstate highway. It was prescribed that the work would consist of two basic parts. One had to do with the analysis of travel data, both present and projected, in the determination of the most feasible location of a route based on conventional traffic and highway development factors. The other phase of the work was to deal with economic considerations, especially the economic impact of the proposed routes on businesses located on existing roads and on the central business district …


Handwritten Receipt For Cash, 2-12-35, V. L. Stallworth Feb 1935

Handwritten Receipt For Cash, 2-12-35, V. L. Stallworth

Real Estate Correspondence 1925-1937

Document: Handwritten receipt for cash received: Received 100.00 [a/c] rents R.H. Walker. VL Stallworth.


Insurance Invoice, January 17, 1935, Burbridge & Higbee Jan 1935

Insurance Invoice, January 17, 1935, Burbridge & Higbee

Real Estate Correspondence 1925-1937

Document: Bill and payment documentation sent to Mrs. R.H. Walker from Burbridge & Higbee Dr. listing payments due.