Open Access. Powered by Scholars. Published by Universities.®
Civil and Environmental Engineering Commons™
Open Access. Powered by Scholars. Published by Universities.®
- Discipline
-
- Civil Engineering (89)
- Transportation Engineering (73)
- Structural Engineering (54)
- Construction Engineering and Management (18)
- Materials Science and Engineering (13)
-
- Structural Materials (12)
- Other Civil and Environmental Engineering (9)
- Architecture (7)
- Hydraulic Engineering (7)
- Architectural Engineering (6)
- Physical Sciences and Mathematics (6)
- Engineering Science and Materials (4)
- Construction Engineering (3)
- Mechanical Engineering (3)
- Statistical Methodology (3)
- Statistics and Probability (3)
- Arts and Humanities (2)
- Computer-Aided Engineering and Design (2)
- Engineering Mechanics (2)
- Environmental Design (2)
- Geotechnical Engineering (2)
- Manufacturing (2)
- Operations Research, Systems Engineering and Industrial Engineering (2)
- Other Materials Science and Engineering (2)
- Social and Behavioral Sciences (2)
- Administrative Law (1)
- Agriculture Law (1)
- American Studies (1)
- Institution
-
- University of Nebraska - Lincoln (38)
- Technological University Dublin (26)
- Purdue University (23)
- University of Kentucky (21)
- Utah State University (18)
-
- Missouri University of Science and Technology (10)
- California Polytechnic State University, San Luis Obispo (7)
- Louisiana State University (7)
- Clemson University (5)
- University of Arkansas, Fayetteville (5)
- Changsha University of Science and Technology (3)
- University of Texas at El Paso (3)
- Brigham Young University (2)
- Embry-Riddle Aeronautical University (2)
- Georgia Southern University (2)
- Marquette University (2)
- National Taiwan Ocean University (2)
- San Jose State University (2)
- University of Central Florida (2)
- Western Michigan University (2)
- Arkansas State University (1)
- Central Washington University (1)
- City University of New York (CUNY) (1)
- Indiana State University (1)
- Kennesaw State University (1)
- LSU New Orleans (1)
- Ministry of Higher and Secondary Specialized Education of the Republic of Uzbekistan (1)
- Rowan University (1)
- South Dakota State University (1)
- The University of Akron (1)
- Publication Year
- Publication
-
- Nebraska Department of Transportation: Research Reports (29)
- Kentucky Transportation Center Research Report (19)
- Conference papers (17)
- All Graduate Theses and Dissertations, Spring 1920 to Summer 2023 (11)
- JTRP Technical Reports (11)
-
- Articles (7)
- Civil, Architectural and Environmental Engineering Faculty Research & Creative Works (6)
- Department of Civil and Environmental Engineering: Dissertations, Theses, and Student Research (6)
- Indiana Local Technical Assistance Program (LTAP) Publications (6)
- Construction Management (5)
- Graduate Theses and Dissertations (5)
- All Theses (4)
- Civil and Environmental Engineering (3)
- Data (3)
- ECT Fact Sheets Archive (3)
- Electronic Theses and Dissertations (3)
- Journal of China & Foreign Highway (3)
- Masters Theses (3)
- Open Access Theses & Dissertations (3)
- Publications (3)
- Theses and Dissertations (3)
- All Graduate Plan B and other Reports, Spring 1920 to Spring 2023 (2)
- Civil and Environmental Engineering Faculty Research and Publications (2)
- Department of Civil and Environmental Engineering: Faculty Publications (2)
- Doctoral Dissertations (2)
- Doctoral Dissertations and Master's Theses (2)
- Journal of Marine Science and Technology–Taiwan (2)
- Master's Theses (2)
- Mineta Transportation Institute (2)
- Open Access Theses (2)
- Publication Type
Articles 1 - 30 of 203
Full-Text Articles in Civil and Environmental Engineering
Designing A Steel Bridge: A Structural Overview, Andrew Orr
Designing A Steel Bridge: A Structural Overview, Andrew Orr
Honors Theses
The American Society of Civil Engineers (ASCE) and American Institute of Steel Construction (AISC) host the Student Steel Bridge Competition (SSBC), a nation-wide competition where students design, fabricate, and construct a model bridge based on a provided rule set. A group of Arkansas State University civil engineering students participated in that competition in Spring 2026.
Iconic Henry Street Bridge In Indianapolis, Marshall Lachecki, Keith Echternach, Mary Appel
Iconic Henry Street Bridge In Indianapolis, Marshall Lachecki, Keith Echternach, Mary Appel
Purdue Road School
The iconic new Henry Street bridge over the White River in Indianapolis is a connection to the west side of downtown Indy. From the challenging hydraulics requirements to the bridge concepts, design, procurement and through construction and archaeology work, the City has worked with many stakeholders and the public to make this new crossing a success. This presentation will focus on design elements of the bridge while touching upon other project elements.
Drainage And Pedestrian Access Improvements At City Farms Slo, Benjamin Marc Kocher, Jacob Anthony Booker
Drainage And Pedestrian Access Improvements At City Farms Slo, Benjamin Marc Kocher, Jacob Anthony Booker
Construction Management
This senior project focused on planning, designing, and constructing drainage and pedestrian access improvements at City Farms SLO, a nonprofit in San Luis Obispo that promotes sustainable agriculture and youth education. Prior to construction, the site experienced significant stormwater pooling and erosion in a central area of the farm, making daily operations and visitor access difficult during wet weather. The team excavated an 80-foot trench drain with appropriate slopes, installed a 15-foot corrugated HDPE culvert with proper bedding and backfill, built a seven-foot pedestrian bridge over the trench, and created a 17-foot gravel pathway connecting the bridge to an existing …
Optimizing Indigenous Timber Short-Gap Crossing Designs By Minimizing Wood Moisture Content, Robert Greenwood
Optimizing Indigenous Timber Short-Gap Crossing Designs By Minimizing Wood Moisture Content, Robert Greenwood
Graduate Theses and Dissertations
Reducing moisture content increases wood strength and reduces the weight of timber members. An accurate and efficient method for measuring moisture content is important for the design and construction of indigenous timber short-gap crossings. This study evaluates different methods for measuring moisture content in timber, describes a methodology for developing a representative moisture content value for a timber log, and approaches for quickly drying large timber logs. The results of this thesis will support activities in developing a representative moisture content of a log for structural design purposes and reducing weight for constructability purposes. The approaches discussed were developed considering …
Rapid Construction Of Short Gap Crossings Using Indigenous Timber, Jack Everett Hamburger
Rapid Construction Of Short Gap Crossings Using Indigenous Timber, Jack Everett Hamburger
Graduate Theses and Dissertations
This thesis examines multiple design options for constructing short span crossings for the military using indigenous timbers. Using indigenous timbers allows for a significant reduction in resources that must be brought into a site for construction. Construction time is minimized by optimizing the steps to convert indigenous timber into structural members for use as timbers in a short gap crossing. A major objective during this thesis study was to examine approaches for maximizing timber strength for design purposes and reduce timber weight for handling purposes. Wood strength and wood weight are highly dependent on moisture content. Decreasing moisture content addresses …
Updating Rainfall Zones And Intensities In Nebraska For Improved Design Of Non-Bridge-Sized Drainage Structures, Rezaul Mahmood, Tirthankar Roy, Chanchal Gupta, Kanak Kanti Kar, William Sorenson
Updating Rainfall Zones And Intensities In Nebraska For Improved Design Of Non-Bridge-Sized Drainage Structures, Rezaul Mahmood, Tirthankar Roy, Chanchal Gupta, Kanak Kanti Kar, William Sorenson
Nebraska Department of Transportation: Research Reports
This study assesses the effectiveness of precipitation zones and Intensity-Duration-Frequency (IDF) curves used by the Nebraska Department of Transportation (NDOT) for designing drainage structures. Twenty stations were selected for the analysis of revised IDF curves out of forty-two stations. Datasets have been considered from the National Center for Environmental Information (NCEI). By Comparing the new curves with existing ones, the study efforts examine the frequency, duration and severe rainfall. The results show that the IDF curves for various zones and stations varied noticeably from one another. Also, noticed that Zone A and B shows lower rainfall intensities in short to …
Field Evaluation Of Transverse Post-Tensioning And Latex Modified Concrete On Bridge Load Distribution, Paige Waters
Field Evaluation Of Transverse Post-Tensioning And Latex Modified Concrete On Bridge Load Distribution, Paige Waters
All Theses
The Airport Road Bridge (ARB) over Rocky Creek in Greenwood, SC is one of 377 channel bridges in South Carolina currently load-posted, limiting vehicle weight and potentially restricting access to vital services. The South Carolina Department of Transportation (SCDOT) seeks a cost-effective method to strengthen these bridges and enhance their load-sharing capacity.
Through live load field testing, this research seeks to use two retrofitting techniques – transverse post-tensioning (PT) and latex modified concrete (LMC) overlay – to determine whether or not channel bridges can be improved. Direct tension testing was also performed to evaluate the substrate-overlay bond of the LMC …
Accelerated Bridge Construction (Abc) Decision Tool, Phil Barutha, Marc Maguire, Elio Saldana, Fray F. Pozo-Lora
Accelerated Bridge Construction (Abc) Decision Tool, Phil Barutha, Marc Maguire, Elio Saldana, Fray F. Pozo-Lora
Nebraska Department of Transportation: Research Reports
This report investigates the creation and assessment of a decision-making tool developed to aid the Nebraska Department of Transportation (NDOT) in determining the suitability of the Accelerated Bridge Construction (ABC) method for bridge replacement projects. The tool utilizes the Analytic Hierarchy Process (AHP) to integrate different criteria, including Average Daily Traffic (ADT), Average Daily Truck Traffic (ADTT), detour time, railroad impact, economy of scale, and the use of typical details, which were found to be paramount in the decision-making process across the state. A sensitivity analysis was conducted to evaluate the tool’s performance and identify the most significant factors influencing …
Spot, Zone And Overcoat Painting Of Steel Bridges, Christopher Goff, Sudhir Palle
Spot, Zone And Overcoat Painting Of Steel Bridges, Christopher Goff, Sudhir Palle
Kentucky Transportation Center Research Report
Over the past 25 – 30 years, the Kentucky Transportation Cabinet (KYTC) has replaced lead-based coatings on many bridges, often with zinc-based systems. But many of these coating systems are now degrading and reaching the ends of their service lives. Historically, KYTC has relied entirely on remove-and-replace painting, however, given the programmatic costs associated with remove-and-replace painting and constraints imposed by limited funding, the agency needs to explore more economical options, such as spot, zone, and overcoat painting. This report discusses use cases for spot, zone, and overcoat painting and lays out guidelines staff can use to determine what method …
Remote Vibration Based Monitoring Of Bridge Scour, Alan Kazemian
Remote Vibration Based Monitoring Of Bridge Scour, Alan Kazemian
Dissertations
The gradual erosion of the sediment around a bridge foundation is called Scour. This erosion is caused by water flow and increases during times of high-water flow such as flooding. The scour leaves the bridges structurally unsound over time and jeopardizes the safety of the structure. Approximately 60 percent of bridge failures in the United States are caused by scour. A variety of types of devices have been used to detect scour. Most of these devices only observe the scour and not the structural integrity of the bridge. The typical approach has relied on visual inspections of the bridges after …
Production Of Cast-In-Place Uhpc For Bridge Applications, Jiong Hu, George Morcous, Akbota Aitbayeva
Production Of Cast-In-Place Uhpc For Bridge Applications, Jiong Hu, George Morcous, Akbota Aitbayeva
Nebraska Department of Transportation: Research Reports
This project presents a comprehensive overview of the essential aspects associated with the cast-in-place application of UHPC, including formwork requirements, surface preparation, mixing procedures, placing methods, curing techniques, grinding specifications, and mockup construction. Each section provides in-depth insights into specific guidelines and practices outlined by various regulatory bodies. The research team has developed training materials designed for a full-day workshop tailored to benefit both contractors and NDOT engineers. This workshop comprises key topics such as proportioning, batching, testing, and the placement of both non-proprietary and proprietary UHPC mixes, as well as hands-on experience in batching, testing, and placing UHPC. The …
Low-Cement Concrete Mixture For Bridge Decks And Rails, Soumitra Das, George Morcous Ph.D., Jiong Hu
Low-Cement Concrete Mixture For Bridge Decks And Rails, Soumitra Das, George Morcous Ph.D., Jiong Hu
Nebraska Department of Transportation: Research Reports
Right after construction, drying shrinkage of restrained concrete bridge decks and rails causes early-age cracking, insertion of water and chemicals, and corrosion of reinforcing steel that eventually leads to delamination and spalling of concrete. The main objective of this research is to control early-age shrinkage cracking by reducing cementitious material content in bridge deck and rail concrete mixtures. Several reduced cementitious materials concrete (RCMC) mixtures were developed by optimizing aggregate particle packing and conducting overall performance evaluation. This evaluation was carried out in three phases. The first phase investigated the feasibility of new RCMC mixtures by testing workability, compressive strength, …
Load Determination, Strengthening, And Behavior Study Of Prestressed Concrete Channel Bridge Girders In South Carolina, Elhussien Khaled Elbatanouny
Load Determination, Strengthening, And Behavior Study Of Prestressed Concrete Channel Bridge Girders In South Carolina, Elhussien Khaled Elbatanouny
Theses and Dissertations
The South Carolina Department of Transportation (SCDOT) is currently engaged in a multi-year effort to assess the structural integrity of its inventory of over 9,000 bridges. This assessment process is expected to result in an increase in the number of bridges that require load postings, repairs, or replacements across South Carolina. This could potentially lead to adverse economic repercussions due to restricted truck routes, bridge closures, repair work, and the need for bridge replacements. To alleviate the escalating costs associated with these challenges, it is imperative to explore methods aimed at reducing the need for load postings and bridge closures …
Optimization Of Bridge Life Cycle Maintenance Decision Based On Lca And Lcc, Liu Shuguang, Liu Jun, Liu Yonghua, Wang Fan
Optimization Of Bridge Life Cycle Maintenance Decision Based On Lca And Lcc, Liu Shuguang, Liu Jun, Liu Yonghua, Wang Fan
Journal of China & Foreign Highway
To study the optimal maintenance strategy for bridges over the whole life cycle under the influence of life cycle environment and life cycle cost, this paper built a multi-objective optimization model for bridge life cycle maintenance decision by adopting preventive maintenance and substantial maintenance as the basic maintenance methods, and bridge reliability, life cycle environment and life cycle cost as the objective functions. Additionally, it derived the quantification method of indicators including the time-varying reliability, life cycle environment and life cycle cost indicators of the bridge, and determined the computational process of bridge life cycle maintenance decision optimization based on …
Tehachapi Mountain Trail Association – Trail Bridge Construction, Michael Bowman
Tehachapi Mountain Trail Association – Trail Bridge Construction, Michael Bowman
Construction Management
The Tehachapi Mountain Trail Association is a nonprofit organization which operates 32 miles of hiking and mountain biking trails year-round. The 650-acre property is located in the foothills above Tehachapi, CA and offers local residents and enthusiasts from around the area an area to exercise and enjoy nature. TMTA is able to operate through yearly memberships that allow the association to hold insurance as well as continue to maintain and build new trails year-round. After completing a separate project for TMTA in Winter 2022 for CM 420 Construction Service Learning, the President, Brandon Griffiths approached me with the idea of …
Assessment Of Bridge Pier Response To Fire, Vehicle Impact, And Air Blast, Chen Fang, Qusai Alomari, Daniel G. Linzell
Assessment Of Bridge Pier Response To Fire, Vehicle Impact, And Air Blast, Chen Fang, Qusai Alomari, Daniel G. Linzell
Department of Civil and Environmental Engineering: Dissertations, Theses, and Student Research
Highway bridges exposed to intentional or unintentional fire followed by combined vehicle impact and air blast are at risk of significant damage and, possibly, collapse. Limited studies examining the complex effects of these extreme demands on bridge support elements and parametrizing their response and damage are found in the open literature. Research that is presented is part of an ongoing numerical investigation examining round, multi-column, reinforced concrete (RC), bridge pier behavior subject to multi-hazard scenarios involving fire, vehicle impact, and air blast. Detailed nonlinear finite element analysis models of single columns and multi-column piers supported by a pile foundation system …
Fatigue Performance Of Flexural Retrofits For Precast Slab Bridges, Ian Stewart
Fatigue Performance Of Flexural Retrofits For Precast Slab Bridges, Ian Stewart
All Theses
This thesis discusses flexural and cyclic load testing of two potential retrofits for pre-cast slab bridges. These slabs came from South Carolina Department of Transportation (SCDOT) decommissioned bridges as a part of an ongoing project with SCDOT. The first is a Carbon Fiber Reinforced Plate (CFRP) retrofit where four CFRP plates were adhesively bonded to the bottom of a slab. The second is a steel plate that was mechanically attached to the bottom of a slab using bolted connections. The bolts were cast into grouted holes in the slab. To better understand the failure mode of these retrofits and their …
Research On Bridge Technical Condition Evaluation System Based On Bim, Xia Zili, Jing Qiang, Gao Wenbo, Huang Liguan, Wu Xiaodong
Research On Bridge Technical Condition Evaluation System Based On Bim, Xia Zili, Jing Qiang, Gao Wenbo, Huang Liguan, Wu Xiaodong
Journal of China & Foreign Highway
There are some practical difficulties in bridge technical condition assessment, such as low visualization degree, strong subjectivity of assessment, low efficiency of disease location, and poor continuity of assessment data. In view of the requirements of bridge technical condition assessment and the above-mentioned problems, this paper reviewed the standard system of bridge technical condition assessment in China and the application of BIM in bridge operation and maintenance, analyzed the modelling points and assessment business processes of bridge BIM model, and designed the overall framework and business module functions of the BIM-based technical condition assessment system. The bridge technical condition assessment …
Research On Bridge Technical Condition Evaluation System Based On Bim, Xia Zili, Jing Qiang, Gao Wenbo, Huang Liguan, Wu Xiaodong
Research On Bridge Technical Condition Evaluation System Based On Bim, Xia Zili, Jing Qiang, Gao Wenbo, Huang Liguan, Wu Xiaodong
Journal of China & Foreign Highway
There are some practical difficulties in bridge technical condition assessment, such as low visualization degree, strong subjectivity of assessment, low efficiency of disease location, and poor continuity of assessment data. In view of the requirements of bridge technical condition assessment and the above-mentioned problems, this paper reviewed the standard system of bridge technical condition assessment in China and the application of BIM in bridge operation and maintenance, analyzed the modelling points and assessment business processes of bridge BIM model, and designed the overall framework and business module functions of the BIM-based technical condition assessment system. The bridge technical condition assessment …
Uhpc Decked I-Beam For Accelerated Bridge Construction, George Morcous, Maher K. Tadros
Uhpc Decked I-Beam For Accelerated Bridge Construction, George Morcous, Maher K. Tadros
Nebraska Department of Transportation: Research Reports
Ultra-High-Performance Concrete (UHPC) is an excellent material for bridge construction due to its exceptional durability and superior mechanical properties. Several Departments of Transportations (DOTs), including NDOT, have limited the use of UHPC in bridge construction to joints and connections between bridge components due to the relatively high materials cost of commercially UHPC products. Recently, NDOT has sponsored a research project to develop a non-proprietary UHPC using local materials to reduce materials cost and ensure its availability to local contractors and precast producers. The project was completed successfully and an economical UHPC mix that satisfied all workability, durability, and strength requirements …
Analytical And Numerical Behavior Of Double Composite Steel Bridges, Emad M. Hassan, Hussam Mahmoud
Analytical And Numerical Behavior Of Double Composite Steel Bridges, Emad M. Hassan, Hussam Mahmoud
Civil, Architectural and Environmental Engineering Faculty Research & Creative Works
Steel plate girders are considered a viable solution for the construction of medium- to long-span bridges. Despite their many advantages, various concerns have been raised regarding their maintenance due to the potential of fatigue crack initiation at welded details, accelerated corrosion in thin webs, and trapped debris around stiffeners. The use of rolled beams, on the other hand, can be very beneficial because they require much less maintenance. However, they are limited in size, which imposes constraints on their use to relatively short-span bridges due to deflection requirements. In this study, the behavior of the double composite superstructure system was …
Sensor Equipped Uas For Non-Contact Bridge Inspections: Field Application, Roya Nasimi, Fernando Moreu, G. Matthew Fricke
Sensor Equipped Uas For Non-Contact Bridge Inspections: Field Application, Roya Nasimi, Fernando Moreu, G. Matthew Fricke
Department of Civil and Environmental Engineering: Faculty Publications
In the future, sensors mounted on uncrewed aerial systems (UASs) will play a critical role in increasing both the speed and safety of structural inspections. Environmental and safety concerns make structural inspections and maintenance challenging when conducted using traditional methods, especially for large structures. The methods developed and tested in the laboratory need to be tested in the field on real-size structures to identify their potential for full implementation. This paper presents results from a full-scale field implementation of a novel sensor equipped with UAS to measure non-contact transverse displacement from a pedestrian bridge. To this end, the authors modified …
Damage Detection And Damage Localization In Bridges With Low-Density Instrumentations Using The Wave-Method: Application To A Shake-Table Tested Bridge, Mehran Rahmani, Xintong Ji, Sovann Reach Kiet
Damage Detection And Damage Localization In Bridges With Low-Density Instrumentations Using The Wave-Method: Application To A Shake-Table Tested Bridge, Mehran Rahmani, Xintong Ji, Sovann Reach Kiet
Mineta Transportation Institute
This study presents a major development to the wave method, a methodology used for structural identification and monitoring. The research team tested the method for use in structural damage detection and damage localization in bridges, the latter being a challenging task. The main goal was to assess capability of the improved method by applying it to a shake-table-tested prototype bridge with sparse instrumentation. The bridge was a 4-span reinforced concrete structure comprising two columns at each bent (6 columns total) and a flat slab. It was tested to failure using seven biaxial excitations at its base. Availability of a robust …
Dataset For Large-Scale, Lateral-Torsional Buckling Tests Of Continuous Beams In A Grillage System, Ahmed Rageh, C. Shawn Sun, Daniel G. Linzell, Jay A. Puckett
Dataset For Large-Scale, Lateral-Torsional Buckling Tests Of Continuous Beams In A Grillage System, Ahmed Rageh, C. Shawn Sun, Daniel G. Linzell, Jay A. Puckett
Department of Civil and Environmental Engineering: Faculty Publications
A number of large-scale tests of a grillage system are summarized and reduced data are provided. The tests were completed in association with a Louisiana Transportation Research Center (LTRC) project for the Louisiana Department of Transportation and Development (LA DOTD) whose goal was to better quantify behavior and limit states of steel bridge floor systems to refine longitudinal member (stringer) load- rating calculations. A number of tests focused on the behavior of the stringers resting on transverse members (a floorbeam), a system akin to a grillage. The system was proportioned with the expectation that stringer lateral-torsional buckling, a key steel …
Phased Construction Bridges: Monitoring And Analysis For Traffic-Induced Vibration, Khalid Al-Kady, Christine E. Wittich, Richard L. Wood, George Morcous
Phased Construction Bridges: Monitoring And Analysis For Traffic-Induced Vibration, Khalid Al-Kady, Christine E. Wittich, Richard L. Wood, George Morcous
Nebraska Department of Transportation: Research Reports
Phased construction is a common technique utilized to allow bridges to remain partially open to traffic throughout the construction process. The segment of the bridge deck that is constructed second cures under the effect of traffic-induced vibration transmitted from the adjacent bridge-deck segment, which is open to traffic. However, subjecting bridge decks to traffic-induced vibration during early-age curing raises concerns about the durability of the decks. The primary goal of this study is to generate a fundamental understanding of the transmission of traffic-induced vibration, the extent of degradation on phased construction bridge decks, and the impact of potential mitigation measures. …
Bridge Project Prioritization, Bryan Gibson, Christopher Van Dyke, Sudhir Palle, Ryan Griffith, Doug Kreis
Bridge Project Prioritization, Bryan Gibson, Christopher Van Dyke, Sudhir Palle, Ryan Griffith, Doug Kreis
Kentucky Transportation Center Research Report
Kentucky’s 14,000+ bridges are key nodes within the state’s surface transportation network. They facilitate the movement of freight, commercial vehicles, and personal vehicles alike. Historically, the Kentucky Transportation Cabinet (KYTC) has prioritized bridge maintenance projects using sufficiency ratings. These ratings are based on three factors — structural adequacy and safety, design obsolescence, and an asset’s importance within the roadway network. Although useful, sufficiency ratings do not account for factors that should be considered during the prioritization process (e.g., condition factors, risk). To address the shortcomings associated with using sufficiency ratings, KYTC — with the assistance of the Kentucky Transportation Center …
Updating The Bridge Construction Cost Database, Rachel Catchings, Ying Li, Ryan Griffith, Sudhir Palle
Updating The Bridge Construction Cost Database, Rachel Catchings, Ying Li, Ryan Griffith, Sudhir Palle
Kentucky Transportation Center Research Report
Adopting a comprehensive suite of methods to track, analyze, and maintain data on bridge construction costs can help state transportation agencies identify and implement strategies to mitigate the influence of factors which escalate project costs. This report discusses how the Kentucky Transportation Cabinet (KYTC) should approach updating, maintaining, and analyzing its bridge construction cost data. Based on a review of practices introduced at other agencies and interviews with public and private industry stakeholders, the report catalogues practical strategies for improving estimating procedures and tracking cost data as well as the most important cost drivers of bridge construction. Analysis of KYTC …
San Luis Obispo Botanical Garden Bridge Rebuild, Anthony T. Flores
San Luis Obispo Botanical Garden Bridge Rebuild, Anthony T. Flores
Construction Management
This paper will outline the process of designing, deconstructing, and reconstructing a utility bridge at the San Luis Obispo Botanical Garden. The San Luis Obispo Botanical Garden’s entrance was recently changed deeper into the property. The old entrance was at the front and was home to a bridge utilized by staff, volunteers, and visitors alike. This project’s goal was to rebuild the utility bridge so that it could be used by the facilities staff and volunteers when working on property. There was one student involved in this project who acted as the designer, performed the preconstruction work, and constructed the …
A Physical Model Of Deadmans Run, Quinn Brandt
A Physical Model Of Deadmans Run, Quinn Brandt
Department of Civil and Environmental Engineering: Dissertations, Theses, and Student Research
A physical model of Deadmans Run and a pair of railroad bridges was constructed to assess the impacts of the bridges on flood flows. Lower Platte South Natural Resources District is planning a series of improvements to Deadmans Run to improve flood conveyance capacity and remove approximately 500 homes and businesses from the floodplain. The rail bridges are located less than a mile from the confluence of Deadmans Run and Salt Creek, meaning the bridges present a significant bottleneck to the planned improvements. The physical model was used to characterize the drag effects caused by the bridges, which was used …
Evaluating The Effects Of Shored Construction On Steel Girder Composite Bridges, Parker Brooks
Evaluating The Effects Of Shored Construction On Steel Girder Composite Bridges, Parker Brooks
Doctoral Dissertations and Master's Theses
Steel composite girder bridges provide economic advantages and higher load-carrying capacity than non-composite alternatives. Over the years, a conventional sequence of un-shored construction for steel girder composite bridges has been developed. There is an alternative construction sequence, known as shored construction, that uses temporary supports (discretely or fully supported) for the superstructure during the installation of metal forms and the pouring of concrete. Shored construction also can be used in an Accelerated Bridge Construction (ABC) practice where construction occurs at a nearby site and fully-formed elements are transported to the final site using self-propelled modular transporters (SPMTs). In order to …