Open Access. Powered by Scholars. Published by Universities.®
Physical and Environmental Geography Commons™
Open Access. Powered by Scholars. Published by Universities.®
- Discipline
-
- Physical Sciences and Mathematics (12)
- Statistics and Probability (12)
- Architecture (11)
- Engineering (11)
- Electrical and Computer Engineering (10)
-
- Environmental Sciences (10)
- Power and Energy (10)
- Construction Engineering (9)
- Oceanography and Atmospheric Sciences and Meteorology (8)
- Architectural Engineering (7)
- Climate (7)
- Life Sciences (7)
- Fresh Water Studies (6)
- Operations Research, Systems Engineering and Industrial Engineering (6)
- Arts and Humanities (5)
- History (5)
- Business (4)
- Ecology and Evolutionary Biology (4)
- Environmental Indicators and Impact Assessment (4)
- Terrestrial and Aquatic Ecology (4)
- Animal Sciences (3)
- Aquaculture and Fisheries (3)
- Business Administration, Management, and Operations (3)
- Cultural Resource Management and Policy Analysis (3)
- Forest Sciences (3)
- Other Operations Research, Systems Engineering and Industrial Engineering (3)
- Environmental Monitoring (2)
- Keyword
-
- Electric lines (7)
- Electric power transmission (7)
- New England (6)
- Hydroelectric power plants (4)
- Maine (4)
-
- Environmental impact statements (3)
- Aroostook County (2)
- Energy policy (2)
- Aerial photogrammetry (1)
- Aroostook County (Me.) (1)
- Dams (1)
- Dickey-Lincoln School Lakes Project (1)
- Earth sciences (1)
- Geological surveys (1)
- Geology (1)
- New Hamsphire (1)
- Saint John River (Me. and N.B.) (1)
- Saint John River Valley (Me. and Quebec) (1)
- Saint John River Valley (Me. and Québec) (1)
- Saint John River Valley (Me. and Québec) Maine (1)
- Socio-economic impact study (1)
- Structural (1)
- Visual-recreation resources (1)
- Water resources development (1)
Articles 1 - 13 of 13
Full-Text Articles in Physical and Environmental Geography
Dickey-Lincoln School Lakes Transmission Project: Final Environmental Impact Statement: Appendix L, New England Division, United States Army Corps Of Engineers, United States Department Of Energy
Dickey-Lincoln School Lakes Transmission Project: Final Environmental Impact Statement: Appendix L, New England Division, United States Army Corps Of Engineers, United States Department Of Energy
Dickey-Lincoln School Lakes Project
This draft EIS Supplement describes the environmental impacts of updated transmission plans of the Department of Energy (DOE) for the proposed Dickey-Lincoln School Lakes Project. Energy produced by the project is to be integrated into the New England electric system if the project is constructed.
Fish And Wildlife Mitigation Report : Dickey-Lincoln School Lakes Project, Maine, New England Division, Corps Of Engineers, U. S. Army Engineer Division
Fish And Wildlife Mitigation Report : Dickey-Lincoln School Lakes Project, Maine, New England Division, Corps Of Engineers, U. S. Army Engineer Division
Dickey-Lincoln School Lakes Project
The Dickey Lincoln School Lakes Project is a proposed multipurpose project located on the upper reaches of the St. John River in Aroostook County, Maine. Development would consist of two dams with associated reservoirs and hydroelectric generating facilities, five dikes and transmission lines. A more detailed description of the proposed project and its associated impacts is contained within the Revised Draft Environmental Impact Statement for the proposed project.
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix A, United States Department Of Energy
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix A, United States Department Of Energy
Dickey-Lincoln School Lakes Project
The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the trans-mission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in iden-tification of a proposed transmission line route, and an environmental impact statement, as required by the National Environmental Policy Act of 1969. This report, documenting an early phase of the overall studies, was first published by the Department of the Interior in February 1977. It is being republished as Appendix A to the DOE Environmental Impact Statement for the project.
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy
Dickey-Lincoln School Lakes Project
The principal objective of this study is to identify the major types and intensity of social and economic impacts anticipated with the proposed pre-construction, construction, operation and maintenance of the Dickey-Lincoln transmission line. In order to address the types of anticipated impacts it was necessary to first develop a socio-economic profile of the affected area.
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix D: Transmission Reconnaissance Study, U.S. Department Of The Interior, U.S. Department Of Energy
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix D: Transmission Reconnaissance Study, U.S. Department Of The Interior, U.S. Department Of Energy
Dickey-Lincoln School Lakes Project
This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New England grid, and describes the study area involved. It supplements the Transmission System PI anning Study prepared by the Department of Interior (DOI) (February 1977) and the Assessment of Alternative Power Transmission Corridors prepared by VTN Consolidated (VTN) of Boston Mass., for the Dickey-Lincoln School Lakes project.
An Overview Of The Proposed Dickey-Lincoln School Lakes Hydro-Electric Project : Aroostook County, Maine, New England Division, Department Of The Army, Corps. Of Engineers, Department Of Energy
An Overview Of The Proposed Dickey-Lincoln School Lakes Hydro-Electric Project : Aroostook County, Maine, New England Division, Department Of The Army, Corps. Of Engineers, Department Of Energy
Dickey-Lincoln School Lakes Project
An overview of The Dickey-Lincoln Project in northern Aroostook County, Maine is a proposed Federally financed hydro-electric power generating facility. Electric energy generated by the facility would be introduced into the New England Power Pool system through construction of new transmission lines across northern Maine, New Hampshire, and Vermont.
Responsibility for investigation and construction rests in the two Federal agencies, i.e. dams and reservoirs in the U.S. Army Corps of Engineers and transmission lines in the U.S. Department of Energy (DOE). The two actions are part of the same proposal, although they are in essence separate and distinct. The dams …
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy
Dickey-Lincoln School Lakes Project
The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the trans-mission facilities required for the Dickey-Lincoln School Hydroelectric project. These studies of many alternate routes have resulted in iden-tification of a proposed transmission line route and an environmental impact statement, as required by the National Environmental Policy Act of 1969. This report, one of several prepared under contract to the DOE by various consultants, is published as an appendix to that statement. Appendix F, Geotechnical Impact Study (two volumes, the second being a map volume), documents a study performed by E. C. …
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix G: Land Use Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix G: Land Use Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy
Dickey-Lincoln School Lakes Project
This report is in partial fulfillment of the requirement of the National Environmental Policy Act of 1969. It is a study of the existing and proposed land use impacts which would likely occur as a result of construction of the Dickey-Lincoln Transmission Line in con-junction with the Dickey-Lincoln Hydroelectric Project at Lincoln School in Northern Maine. This report is organized and follows basically a topical summary as outlined in the National Environmental Policy Act.
Revised Draft Impact Statement Issued For Dickey-Lincoln, New England Division, United States Army Corps Of Engineers
Revised Draft Impact Statement Issued For Dickey-Lincoln, New England Division, United States Army Corps Of Engineers
Dickey-Lincoln School Lakes Project
The revised draft combines data previously published in two separate impact statements prepared by the Corps relating to the dams, reservoirs and Power Plants and by the U. S. Department of Energy for transmission facilities to link the St. John River development to the New England power grid.
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy
Dickey-Lincoln School Lakes Project
The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the transmission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in identification of a proposed transmission line route, and an environmental impact statement as required by the National Environmental Policy Act of 1969. This report, one of several covering various topical areas, is published as an appendix to that statement.
Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division
Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division
Dickey-Lincoln School Lakes Project
Objective of this study will be to assess Dickey-Lincoln in terms of its attainment of project objectives. How will this be done? The Water Resources Council in "Water and Related Land Resources -Establishment of Principles and Standards for Planning"' states that: The overall purpose of water and land resource planning is to promote the quality of life, by reflecting society's preferences for attainment of the objectives...
Use Of Remote Sensing To Quantify Construction Material And To Define Geologic Lineations : Dickey-Lincoln School Lakes Project, Maine, H. L. Mckim, C. J. Merry
Use Of Remote Sensing To Quantify Construction Material And To Define Geologic Lineations : Dickey-Lincoln School Lakes Project, Maine, H. L. Mckim, C. J. Merry
Dickey-Lincoln School Lakes Project
This report contains Appendixes A and B of Special Report 242, use of remote sensing to quantify construction material and to define geologic lineations.
Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray
Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray
Dickey-Lincoln School Lakes Project
The intention of this report is to present a still picture of the selected area as of the summer of 1966. The emphasis is on empirical relationships. The data contained herein will provide a base for subsequent analysis. Thus little attempt is made to cast the findings of the study in a theoretical framework. Later publications will utilize relevant theory and research to analyze the social and economic changes in an area related to the building of the Dickey and Lincoln School Dams. It is presumed that this particular report and its statistical sup-plement will be of particular interest to …