Open Access. Powered by Scholars. Published by Universities.®

Engineering

PDF

Institution
Keyword
Publication Year
Publication
Publication Type

Articles 391 - 404 of 404

Full-Text Articles in Fresh Water Studies

Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Environmental Impact Statement, New England Division, United States Army Engineer Division Jan 1977

Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Environmental Impact Statement, New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

This draft EIS address the impacts of the dams and appurtenant structures. The marketing and transmission of power from Federal projects are the statutory responsibility of the Department of the Interior. Accordingly, they are conducting transmission line studies in the preparation of a draft EIS. The draft EIS for transmission line and marketing is scheduled to be submitted to the Council on Environmental Quality in February 1978. Both drafts will be combined and submitted as a Final Environmental Impact Statement in August 1978.


Final Report On The Recreation Plan For Dickey-Lincoln School Lakes Project, Maine : Prepared For The Corps Of Engineers, New England Division, Northern Maine Regional Planning Commission, Land Use Consultants, Inc Jan 1977

Final Report On The Recreation Plan For Dickey-Lincoln School Lakes Project, Maine : Prepared For The Corps Of Engineers, New England Division, Northern Maine Regional Planning Commission, Land Use Consultants, Inc

Dickey-Lincoln School Lakes Project

The purpose of this report is to evaluate and describe the existing recreational use and resources of the project area and the encompassing study area and to project the future use of those resources both with and without the Dickey-Lincoln School Lakes Project. This study develops and evaluates a concept plan for the recreation potential of the Dickey-Lincoln School project and assesses the recreational impact of this recommended concept plan.


Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division Jan 1977

Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division

Dickey-Lincoln School Lakes Project

Objective of this study will be to assess Dickey-Lincoln in terms of its attainment of project objectives. How will this be done? The Water Resources Council in "Water and Related Land Resources -Establishment of Principles and Standards for Planning"' states that: The overall purpose of water and land resource planning is to promote the quality of life, by reflecting society's preferences for attainment of the objectives...


Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior Jan 1977

Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior

Dickey-Lincoln School Lakes Project

Two dams are proposed on the St. John River in northern Maine: Dickey, a high earth filled dam immediately above the confluence of the Allagash with the St. John, will have an installed generating capacity of 760 MW; and Lincoln School Dam, 11 miles downstream, a capacity of 70 MW. These dams are scheduled for completion during the mid 1980's. The U.S. Corps of Engineers, New England Division, has been allocated funds to design the project and prepare their own environmental impact statement. This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New …


Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada: Design Memorandum No. 4a: General Design (Revised), New England Division, United States Corps Of Engineers Jan 1977

Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada: Design Memorandum No. 4a: General Design (Revised), New England Division, United States Corps Of Engineers

Dickey-Lincoln School Lakes Project

This design memorandum presents for review the revised general plan and data for the Dickey-Lincoln School Lakes project, Maine, U.S.A. and Quebec, Canada to provide the basis for preparation of detailed design memoranda, plans and specifications. This document presents revisions to the basic project plan and related data included in the 1967 General Design Memorandum reflecting current water resource requirements. This memorandum serves as a functional design document and 1s presented 1n Phase II level of detail. However, 1n view of the long period of Inactivity, Phase I features have also been incorporated for continuity of project information.


Report On Wastewater Disposal To Board Of County Commissioners, Clark County Nevada, Clair N. Sawyer Oct 1976

Report On Wastewater Disposal To Board Of County Commissioners, Clark County Nevada, Clair N. Sawyer

Publications (WR)

This report is concerned with the management of waste-waters and subsurface drainage from the City of Las Vegas and its environs and the BMI complex, all in Clark County, Nevada. The prime objective is to recommend a plan of action which will utilize the natural resources of the area in the least costly manner and still protect Lake Mead for recreational purposes and use as a public water supply, At this writing, conditions in the upper Las Vegas arm of Boulder Basin are quite unsatisfactory for some recreational purposes due to the extensive blooms of algae which develop. Experience at …


Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior Jan 1976

Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior

Dickey-Lincoln School Lakes Project

This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System. Five alternate integration plans were identified and studied. Of the five plans, the recommended plan, which calls for the lines to be suspended from a single row of …


Water Resources Development Project, Saint John River Basin : Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 : Hydrology And Hydraulic Analysis, Section Iv - Lincoln School Dam-Spillway Design Flood, Department Of The Army, New England Division, Corps Of Engineers Jan 1976

Water Resources Development Project, Saint John River Basin : Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 : Hydrology And Hydraulic Analysis, Section Iv - Lincoln School Dam-Spillway Design Flood, Department Of The Army, New England Division, Corps Of Engineers

Dickey-Lincoln School Lakes Project

The first of four sections comprising Design Memo-randum No. 2. The other sections are: II - Dickey Dam - Spillway Design Flood, III - Lincoln School Dam - Spillway Design Flood and IV - Flood Analysis and Reservoir Regulation. la section I, hydro-logic studies will be confined generally to the drainage area of the Saint John River above the gaging station at Fort Kent, Maine. The purpose of section I is to present the climatological and streamflow data for the Saint John River above Fort Kent in order to establish hydrologic criteria for the design of the Dickey and Lincoln …


Hydroelectric Power Potential At Corps Of Engineers Projects : A Report, Ralph L. Trisko, United States. Army., Institiute For Water Resources Jan 1975

Hydroelectric Power Potential At Corps Of Engineers Projects : A Report, Ralph L. Trisko, United States. Army., Institiute For Water Resources

Dickey-Lincoln School Lakes Project

This report completes phase one of the study. It is intended to fill the need, recognized at the outset, for a broad framework within which subsequent more detailed study at the project level might take place. It is an overview of physical hydropower potential in the context of energy and water resources and demands, energy economics, and federal policy, organization, and practices pertaining to hydropower development and marketing.


Automation Of The Continuous Coagulation Monitor, Dee Mitchell, James J. Oskowis Jan 1974

Automation Of The Continuous Coagulation Monitor, Dee Mitchell, James J. Oskowis

Technical Reports

The development of automation in the past 50 years has paralleled the accelerating growth of today’s vast technological society. Automatic control systems are indispensable extensions of man's brain that enable him to monitor and regulate his complex environment. The principles of automatic control have a wide range of applications and interests in virtually every scientific field. The need for automatic control systems in vital applications of environmental engineering is both real and urgent. Extensive pollution has resulted in unavoidable water re-use and in the inevitable establishment of stringent effluent standards. Both water and wastewater treatment processes have necessarily become more …


Water Quality Study Of Lake Mead, Dale A. Hoffman, Paul R. Tramutt, Frank C. Heller, Bureau Of Reclamation Nov 1967

Water Quality Study Of Lake Mead, Dale A. Hoffman, Paul R. Tramutt, Frank C. Heller, Bureau Of Reclamation

Publications (WR)

This report presents Lake Mead Water quality data obtained from 1964 to 1966. The effect of filling Lake Powell on the water quality of Lake Mead is evaluated. General limnological principles and the present limnology of Lake Mead are discussed. Lake Mead has a warm monomictic annual temperature cycle characterized by summer stratification, fall overturn leading into a continuous circulation throughout the winter; temperatures never fall below 39 deg F (4 deg C). During stratification, lower dissolved oxygen values were recorded in the thermocline than in the epilimnion and hypolimnion. Mineral content increases from the upper to the lower end …


Waterways: Comprehensive Regional Plan Series Report Four, East Central Florida Regional Planning Council Sep 1967

Waterways: Comprehensive Regional Plan Series Report Four, East Central Florida Regional Planning Council

City and Regional Planning -- Florida

A plan to make use of the lakes, rivers, canals, and oceans for commerce and other development


Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 Hydrology And Hydraulic Analysis: Section 1 - Climatology And Stream Flow, United States Army Corps Of Engineers, New England Division Jan 1967

Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 Hydrology And Hydraulic Analysis: Section 1 - Climatology And Stream Flow, United States Army Corps Of Engineers, New England Division

Dickey-Lincoln School Lakes Project

This section I is the first of four sections comprising Design Memo-randum No. 2. The other sections are: II - Dickey Dam - Spillway Design Flood, III - Lincoln School Dam - Spillway Design Flood and IV - Flood Analysis and Reservoir Regulation. la section I, hydro-logic studies will be confined generally to the drainage area of the Saint John River above the gaging station at Fort Kent, Maine. The purpose of section I is to present the climatological and streamflow data for the Saint John River above Fort Kent in order to establish hydrologic criteria for the design of …


Freestone County, Texas [Water Quality Survey Of Wells And Springs With Test Hole Data, 1936], Samuel F. Turner Jun 1937

Freestone County, Texas [Water Quality Survey Of Wells And Springs With Test Hole Data, 1936], Samuel F. Turner

United States Geological Survey: Water Reports and Publications

Introduction

The purpose of this survey was to obtain information concerning existing wells and springs and the quantity and quality of water they yield, and to put down test holes where additional information was needed.

This project was part of a statewide Works Progress Administration project known as a "Statewide Inventory of Water Wells," sponsored by the [Texas] State Board of Water Engineers. The Division of Ground Water of the United States Geological Survey cooperated in the technical direction of the project and the Bureau of Industrial Chemistry of the University of Texas furnished laboratory space and equipment and supervised …