Open Access. Powered by Scholars. Published by Universities.®

Aquaculture and Fisheries Commons

Open Access. Powered by Scholars. Published by Universities.®

Geography

Institution
Keyword
Publication Year
Publication
Publication Type

Articles 31 - 45 of 45

Full-Text Articles in Aquaculture and Fisheries

Evaluation Of Frontline Demonstration On Mustard In Sunderbans, West Bengal, Ganesh Chandra, R L. Sagar Jan 2004

Evaluation Of Frontline Demonstration On Mustard In Sunderbans, West Bengal, Ganesh Chandra, R L. Sagar

Ganesh Chandra

Mustard is one of the most important oi lseeds crop in West Bengal, which plays a major role in supplementing the income of small and marginal farmers of Sunderbans. One of the major constraints of traditional mustard farming is low productivity of local varieties. To replace this anomaly, Krishi Vigyan Kendra of CIFRI has conducted frontline demonstration at adopted farmers’ field in four development blocks viz. Kakdwip, Namkhana, Patharpratima and Kulpi of Sunderbans, West Bengal. Cultivation of high yielding varieties of mustard viz. Bhagirathi (RW-351), Sanjukta asech (4C-6-3/II), Jhumka (NC-1), Seeta (B-85) and Binoy (B-9) shows percentage increase of 57.51, …


Fisheries In Sundarbans: Problems And Prospects, Ganesh Chandra, R L. Sagar Dec 2003

Fisheries In Sundarbans: Problems And Prospects, Ganesh Chandra, R L. Sagar

Ganesh Chandra

Sundarbans, the largest delta on the planet earth is famous for its marine and estuarine fish resources. A large population is dependent on fishery activity and capture fisheries is treated as the backbone of Sundarban economy. Sundarban boast around 172 species of fishes, 20 species of prawn and 44 species of crabs including two edible crabs. But fisheries in Sundarbans faces some difficult problems which have an impact on the biodiversity, sustainability and livelihood of fish resources and fisher folk viz. shrinking tiger prawn population, indiscriminate fish seed collection, lack of post harvest and other infrastructures, natural calamities such as …


A Spatial And Temporal Analysis Of Riparian Vegetation Along Satus Creek On The Yakama Indian Reservation, Kathryn Gellenbeck Jan 1999

A Spatial And Temporal Analysis Of Riparian Vegetation Along Satus Creek On The Yakama Indian Reservation, Kathryn Gellenbeck

All Master's Theses

Satus Creek provides critical habitat for the Yakima River Basin steelhead. A diverse community of riparian vegetation is important for healthy fish habitat; vegetation changes can affect shade, cover, channel structure, water quality, and food availability. The purpose of this thesis is to analyze and illustrate riparian vegetation change, both temporally and spatially, along three separate reaches of Satus Creek. A Geographic Information Systems approach was applied to assess the vegetation change by comparing plant species composition and density on 1949 and 1995 aerial photographs. The GIS approach allowed patterns and trends in the vegetation to be identified. In less …


Fish And Wildlife Mitigation Report : Dickey-Lincoln School Lakes Project, Maine, New England Division, Corps Of Engineers, U. S. Army Engineer Division Jan 1980

Fish And Wildlife Mitigation Report : Dickey-Lincoln School Lakes Project, Maine, New England Division, Corps Of Engineers, U. S. Army Engineer Division

Dickey-Lincoln School Lakes Project

The Dickey Lincoln School Lakes Project is a proposed multipurpose project located on the upper reaches of the St. John River in Aroostook County, Maine. Development would consist of two dams with associated reservoirs and hydroelectric generating facilities, five dikes and transmission lines. A more detailed description of the proposed project and its associated impacts is contained within the Revised Draft Environmental Impact Statement for the proposed project.


Revised Draft Impact Statement Issued For Dickey-Lincoln, New England Division, United States Army Corps Of Engineers Jan 1978

Revised Draft Impact Statement Issued For Dickey-Lincoln, New England Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

The revised draft combines data previously published in two separate impact statements prepared by the Corps relating to the dams, reservoirs and Power Plants and by the U. S. Department of Energy for transmission facilities to link the St. John River development to the New England power grid.


Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy Jan 1978

Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy

Dickey-Lincoln School Lakes Project

This draft environmental impact statement (EIS) will describe the environmental impacts of transmission plans of the Department of Energy (DOE) for the proposed Dickey-Lincoln School Lakes Project. Electric power produced by the project is to be integrated into the New England electric system if the project is constructed.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the transmission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in identification of a proposed transmission line route, and an environmental impact statement as required by the National Environmental Policy Act of 1969. This report, one of several covering various topical areas, is published as an appendix to that statement.


Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior Jan 1977

Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior

Dickey-Lincoln School Lakes Project

Two dams are proposed on the St. John River in northern Maine: Dickey, a high earth filled dam immediately above the confluence of the Allagash with the St. John, will have an installed generating capacity of 760 MW; and Lincoln School Dam, 11 miles downstream, a capacity of 70 MW. These dams are scheduled for completion during the mid 1980's. The U.S. Corps of Engineers, New England Division, has been allocated funds to design the project and prepare their own environmental impact statement. This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New …


Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior Jan 1976

Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior

Dickey-Lincoln School Lakes Project

This second volume of the Assessment of Alternative Power Transmission Corri-dors related to the Dickey Lincoln/School Hydroelectric Project, contains all relevant background materials to support the mapping and analysis of en-vironmental resource information. Narrative explaining what information was evaluated and the sources and reasons for its consideration are integral to this assessment.


Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers Jan 1976

Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

The purpose of the proposed Dickey-Lincoln School Lakes Hydroelectric Project is to convert the natural energy of the upper St. John River in northern Maine for use as a source of electricity to meet future needs of New England consumers.


Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior Jan 1976

Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior

Dickey-Lincoln School Lakes Project

This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System. Five alternate integration plans were identified and studied. Of the five plans, the recommended plan, which calls for the lines to be suspended from a single row of …


Terrestrial Ecology Of The Dickey-Lincoln School Lakes Project, Corps Of Engineers, New England Division, Environmental Research & Technology, Inc Jan 1976

Terrestrial Ecology Of The Dickey-Lincoln School Lakes Project, Corps Of Engineers, New England Division, Environmental Research & Technology, Inc

Dickey-Lincoln School Lakes Project

This introduction of the St. John River watershed is situated in a transitional zone between the Boreal Forest Formation and the Eastern Deciduous Forest Formation. Second-growth forests representative of these two ecosystems cover extensive areas of the project site. The boreal forest forms a broad transcontinental belt in northern North America and Eurasia, with southern montane extensions. This northern forest is characterized by evergreen, coniferous trees, predominately spruce-fir The eastern deciduous forest, composed of broad-leaved hardwoods, extends throughout the eastern United States except Florida (Dasmann, 1968; Oosting, 1956).


[Letter From New England Regional Director To Division Engineer, New England Division, U.S. Army Corps Of Engineers], U.S. Fish And Wildlife Service Jan 1976

[Letter From New England Regional Director To Division Engineer, New England Division, U.S. Army Corps Of Engineers], U.S. Fish And Wildlife Service

Dickey-Lincoln School Lakes Project

The results of appraisals conducted jointly by this Service, the Maine Department of Inland Fisheries and Wildlife, and your agency concerning bald eagle, osprey, peregrine falcon, and great blue heron.


Scope Of Work, Environmental Impact Statement For The Dickey-Lincoln School Lakes Project, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers Jan 1975

Scope Of Work, Environmental Impact Statement For The Dickey-Lincoln School Lakes Project, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

Revised draft combines data previously published in two separate impact statements prepared by the corps relating to the dams, reservoirs and power plants and by the U. S. Department of Energy for transmission facilities to link the St. John River development to the New England power grid. The latter agency is responsible for the marketing and distribution of power generated at federally-financed installations.


The Fresh-Water Mussel Industry Of The Lower Tennessee River: Ecology & Future, Randall Grace May 1974

The Fresh-Water Mussel Industry Of The Lower Tennessee River: Ecology & Future, Randall Grace

Masters Theses & Specialist Projects

The fresh-water mussel industry of the Tennessee River is nearing an end. Overharvesting, habitat alterations, and pollution are the major contributors to the depletion of the mussel resource, upon which the shell industry is based. A history of unconcern by shell harvesters and weak conservation enforcement by governmental agencies, has left the major waterways of the United States nearly void of commercial clams. The lower Tennessee River presently supplies the mussel industry with nearly all the important species of mollusks. If this industry is to be maintained in the United States, ways to preserve and propagate the mussel population must …