Open Access. Powered by Scholars. Published by Universities.®

Civil Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Civil Engineering

Response Of Orthotropic Bridge Decks To Highway Loadings, Harry Morris Rexin Jul 1973

Response Of Orthotropic Bridge Decks To Highway Loadings, Harry Morris Rexin

Dissertations and Theses

This thesis documents the fabrication, testing techniques, and response of a plastic scale model of an orthotropic bridge deck. To economically investigate a two-lane steel bridge deck, plastic AcrylicR was used as a modeling material. Welds were simulated with dichloromethane, a capillary action solvent, and PS-30, a polymerizable cement. Deflections were measured with laboratory dial guages while strains were monitored with strain guages mounted on the deck.

The response of the deck to AASHO vehicle axle loads was compared with a discrete element computer program used to analyze orthotropic bridge decks continuous over flexible supports. Results indicate good correlation …


Bridge / Tunnel Crossing Study : Portland Harbor - Fore River, Portland - South Portland, Maine Department Of Transportation Jan 1973

Bridge / Tunnel Crossing Study : Portland Harbor - Fore River, Portland - South Portland, Maine Department Of Transportation

Maine Collection

Bridge / Tunnel Crossing Study : Portland Harbor - Fore River, Portland - South Portland

Report by Fay, Spofford & Thorndike, Inc., Engineers, Boston, Mass.

Prepared for the Maine Department of Transportation, Augusta, Maine, 1973.

Contents: Table of Contents / List of Figures / List of Tables / Introduction / Summary of Findings / Section 1 - General Background - Location Study / Section 2 - Alternative Facilities and Locations / Section 3 - Comparison of Construction Costs - Tunnel Versus Bridge / Section 4 - Traffic Analysis / Section 5 - Cost Effectiveness Analysis / Section 6 - Financial …