Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 13 of 13

Full-Text Articles in Recreation, Parks and Tourism Administration

Fogler Library Salon Series: Protecting Acadia National Park Through Public-Private Partnerships, Daisy Domínguez Singh, John Daigle, Kevin Schneider, Ken Olson Oct 2023

Fogler Library Salon Series: Protecting Acadia National Park Through Public-Private Partnerships, Daisy Domínguez Singh, John Daigle, Kevin Schneider, Ken Olson

UMaine Video

University of Maine Professor of Forest Recreation Management John Daigle conducts an armchair conversation about the operational, philosophical and political realities of running Acadia National Park, Maine’s most visited natural destination. Acadia faces challenges ranging from climate change to increasing diversity of its visitors to managing congestion and crowding. Acadia Superintendent Kevin Schneider will speak to the National Park Service mission of providing for visitor enjoyment, education, and inspiration while meeting the legal imperative to leave the parks unimpaired for future generations. Retired President and CEO of Friends of Acadia Ken Olson will lay out the part nonprofits perform in …


Caverly (Irvin C.) Papers, 1917-2023, Special Collections, Raymond H. Fogler Library, University Of Maine Jan 2023

Caverly (Irvin C.) Papers, 1917-2023, Special Collections, Raymond H. Fogler Library, University Of Maine

Finding Aids

Irvin "Buzz" Caverly, Jr. began working at Baxter State Park in 1960 as Park Ranger I immediately after graduating from Lee Academy in Lee, Maine. In 1982, 22 years after first being hired as a ranger, Caverly was selected to be the Baxter State Park Director, a position he would remain in until his retirement in 2005. Caverly remained active with the park, accepting an appointment from Governor Baldacci in 2007 to serve as the Baxter Park Wilderness Trust Fund Commissioner.

Collection, (1917-2023) includes papers, personal correspondence, and publications regarding former Governor Percival P. Baxter (1876-1969) and Baxter State Park. …


Maine’S Public Reserved Lands: A Tale Of Loss And Recovery, Richard Barringer, Lee Schepps, Thomas Urquhart, Martin Wilk Jan 2020

Maine’S Public Reserved Lands: A Tale Of Loss And Recovery, Richard Barringer, Lee Schepps, Thomas Urquhart, Martin Wilk

Maine Policy Review

The story of Maine’s public reserved lands—or public lots—is worth the telling for its own sake and for its enduring lessons. Provided for in the Maine Constitution of 1820 and neglected for more than a century, the public lots were once scattered widely across the Unorganized Territory of northern, western, and eastern Maine. Today, they are restored to public use and benefit, reassembled into large blocks of land that, in aggregate, are more than twice the size of Baxter State Park. These consolidated public lots offer a wide spectrum of extraordinary values, include many of the crown jewels of Maine’s …


Alternative Power Transmission Corridors. Map Volume., United States. Department Of Energy Jan 1978

Alternative Power Transmission Corridors. Map Volume., United States. Department Of Energy

Dickey-Lincoln School Lakes Project

Source data for base map taken from US Geological Survey Topographic Maps. 1:250.000 scale series. Horizontal and vertical control depicted herein is relative to the U S.G S source maps.


Land Use Impact Study. Map Volume, United States. Department Of Energy Jan 1978

Land Use Impact Study. Map Volume, United States. Department Of Energy

Dickey-Lincoln School Lakes Project

Environmental Assessment of Alternative Routes, Land Use Study, Maps, Existing land use


Visual-Recreation Resources Impact Study. Map Volume, United States. Department Of Energy Jan 1978

Visual-Recreation Resources Impact Study. Map Volume, United States. Department Of Energy

Dickey-Lincoln School Lakes Project

Environmental Assessment of Alternative Routes, Visual/Recreational Resources Impact Studies, Maps of Recreational Resources


Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc. Jan 1977

Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc.

Dickey-Lincoln School Lakes Project

The Dickey-Lincoln Hydroelectric Dam is a water resources project proposed by the Federal Government (U. S. Army Corps of Engineers). Therefore, in accordance with the National Environmental Policy Act, the Corps of Engineers is required to prepare an environmental impact statement (EIS) on the project. A federal plan or project such as Dickey-Lincoln should take into account its effect upon man's health, safety, welfare and economic well-being, as well as effects upon the surrounding environment. More importantly, project plans should be evaluated in a "manner calculated to encourage harmony between man and his environment." In other words, project plans or …


Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior Jan 1977

Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior

Dickey-Lincoln School Lakes Project

Two dams are proposed on the St. John River in northern Maine: Dickey, a high earth filled dam immediately above the confluence of the Allagash with the St. John, will have an installed generating capacity of 760 MW; and Lincoln School Dam, 11 miles downstream, a capacity of 70 MW. These dams are scheduled for completion during the mid 1980's. The U.S. Corps of Engineers, New England Division, has been allocated funds to design the project and prepare their own environmental impact statement. This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New …


Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior Jan 1976

Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior

Dickey-Lincoln School Lakes Project

This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System. Five alternate integration plans were identified and studied. Of the five plans, the recommended plan, which calls for the lines to be suspended from a single row of …


Scope Of Work, Environmental Impact Statement For The Dickey-Lincoln School Lakes Project, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers Jan 1975

Scope Of Work, Environmental Impact Statement For The Dickey-Lincoln School Lakes Project, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

Revised draft combines data previously published in two separate impact statements prepared by the corps relating to the dams, reservoirs and power plants and by the U. S. Department of Energy for transmission facilities to link the St. John River development to the New England power grid. The latter agency is responsible for the marketing and distribution of power generated at federally-financed installations.


A Study Of The Dickey-Lincoln Hydroelectric Project And Its Impact On The Resources Of The Upper Saint John River Valley, Rosemary M. Manning, Sierra Club, New England Chapter Jan 1973

A Study Of The Dickey-Lincoln Hydroelectric Project And Its Impact On The Resources Of The Upper Saint John River Valley, Rosemary M. Manning, Sierra Club, New England Chapter

Dickey-Lincoln School Lakes Project

This report was under-taken primarily to evaluate the impact that the construction of the Dickey-Lincoln project would have upon the resources of the Upper St. John River, and to examine the assertion that the Dickey-Lincoln project constitutes a wise use of the public's environmental and economic resources. Since the case that has been made for the construction of the Dickey-Lincoln project rest primarily on the justification of the project in economic terms, this aspect of the project proposal will be intensively explored.


Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray Jan 1968

Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray

Dickey-Lincoln School Lakes Project

The intention of this report is to present a still picture of the selected area as of the summer of 1966. The emphasis is on empirical relationships. The data contained herein will provide a base for subsequent analysis. Thus little attempt is made to cast the findings of the study in a theoretical framework. Later publications will utilize relevant theory and research to analyze the social and economic changes in an area related to the building of the Dickey and Lincoln School Dams. It is presumed that this particular report and its statistical sup-plement will be of particular interest to …


Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray Jan 1968

Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray

Dickey-Lincoln School Lakes Project

The intention of this report is to present a still picture of the selected area as of the summer of 1966. The emphasis is on empirical relationships. The data contained herein will provide a base for subsequent analysis. Thus little attempt is made to cast the findings of the study in a theoretical framework. Later publications will utilize relevant theory and research to analyze the social and economic changes in an area related to the building of the Dickey and Lincoln School Dams. It is presumed that this particular report and its statistical sup-plement will be of particular interest to …