Ddasaccident305, Hd-Aid Oct 1999

Ddasaccident305, Hd-Aid

Global CWD Repository

The accident occurred in a minefield called Palkie that was laid in 1970s. The contamination was such that a metal detector could not be used in some places and a “clearance by excavation” method was used. In one place where a shell had dropped, the victim was excavating using a Russian bayonet when he initiated a mine.


Ddasaccident304, Hd-Aid Oct 1999

Ddasaccident304, Hd-Aid

Global CWD Repository

The accident occurred when an EOD worker was making a final check over the cleared area. He then discovered a partly buried mortar (PD M-6) fuze. The fuze was already taken apart. The booster was removed and no safety pins (two) were in place. When the EOD worker handled the fuse the striker “sledged and initiated the detonator”.


Trends. The Iraqi Crisis, Ibpp Editor Oct 1999

Trends. The Iraqi Crisis, Ibpp Editor

International Bulletin of Political Psychology

The article discusses the security threat that Iraq presents to the world.


Ddasaccident357, Hd-Aid Aug 1999

Ddasaccident357, Hd-Aid

Global CWD Repository

The accident had taken place at 1245hrs; the injured deminer arrived at Emergency hospital in Sulymania at 1400hrs and was admitted. The prodder which he had been using was badly damaged and had taken on the shape of a half moon. This indicated that the point of the prodder had detonated the mine.


Ddasaccident360, Hd-Aid Jun 1998

Ddasaccident360, Hd-Aid

Global CWD Repository

Whilst [the Victim] was clearing the pit area of unburned WP with a shovel, something in the shovel-load exploded on hitting the ground causing a small metal fragment to puncture his left thigh.


Ddasaccident359, Hd-Aid Dec 1997

Ddasaccident359, Hd-Aid

Global CWD Repository

The operator had returned to Pit 1 and was in the process of checking the pit fully when the EOD specialist arrived. As he left the pit to meet him, one of the fuzes functioned. 2 fragments had entered through the side and rear of his boot.


Ddasaccident116, Hd-Aid Nov 1997

Ddasaccident116, Hd-Aid

Global CWD Repository

The accident occurred at 11:15 in an area that was undulating and steep with dry earth and rock. The victim was investigating a detector reading with a prodder when the mine exploded. He suffered minor blast injuries to his chin and small fragment injuries to his right hand, his right thigh and knee joint. His helmet and visor took most of the blast. The victim was blown back and rolled several metres down a slope. He was evacuated, with two deminers of the same blood group, to the "Emergency" Hospital.


Ddasaccident006, Hd-Aid Nov 1997

Ddasaccident006, Hd-Aid

Global CWD Repository

The team started work at 07:30 and at 09:30 it started to rain so they stopped work. The rain was light but it prevented the deminers from seeing through their visors until 10:55 when they started work again. At 11:10 the victim found a mine and was starting to mark it. He turned to his No.2 to request some pickets and as he did so he slipped and fell backwards onto the mine. The victim was holding his detector at the time. He was thrown into a mined area so a safe lane was cleared to reach him. He was …


Ddasaccident008, Hd-Aid Sep 1997

Ddasaccident008, Hd-Aid

Global CWD Repository

At 10:30 the victim was walking through the area to reach the rest area when he stood on a mine, thought to be a PMN buried to a depth of about 5cm. The victim suffered a below knee amputation to his left leg and minor injuries to both arms and legs.


Ddasaccident078, Hd-Aid Aug 1997

Ddasaccident078, Hd-Aid

Global CWD Repository

The Team leader was preparing to destroy the discovered mines when he was injured in the first mine accident on the site that day [See accident No.227]. After the Supervisor had dealt with that accident he went looking for the deminer who had found the mines, intending to appoint him as the acting Team Leader.


Ddasaccident077, Hd-Aid Aug 1997

Ddasaccident077, Hd-Aid

Global CWD Repository

A deminer [the victim in a later accident on the same day] began clearance and located a PMN. He informed the Team Leader and then continued work and located another two PMNs. He then moved to the end of the clearance lane and found a further three PMNs. As he worked he marked the lane by taking markers from the right side and putting them on the left side. Each of the discovered mines was marked with a wooden picket.


Ddasaccident079, Hd-Aid Jun 1997

Ddasaccident079, Hd-Aid

Global CWD Repository

The guide then mentioned another V-69 nearby and the two men inspected it. This mine had been tampered with or damaged but Victim No.1 decided that it was safe to move it to the new demolition site. Victim No.2 carried the fuze and detonators from the old site to the new one. Victim No.1 then asked Victim No.2 to lay the demolition cable. He was laying the cable and about 3m behind Victim No.1 when there was an explosion. He stated, "I can confidently say that the mines exploded while [Victim No.1] was busy laying the demolition charges".


Ddasaccident080, Hd-Aid Mar 1997

Ddasaccident080, Hd-Aid

Global CWD Repository

The victim was part of an advance team which was defining the perimeter of a suspected mined area, with the help of a local guide. The victim was putting in metal markers about 3m away from the existing mined-area boundary stakes. At 09:20 the victim stepped on a mine about 8m away from the existing boundary stakes. He suffered " a cracked bone and bruising to his left foot".


Ddasaccident361, Hd-Aid Aug 1996

Ddasaccident361, Hd-Aid

Global CWD Repository

The Victim picked up a rock and moved back with it to put it to one side. He had withdrawn two meters when a dislodged rock rolled into the area he had cleared of rocks and detonated a Type-72a blast mine.


Ddasaccident081, Hd-Aid Jun 1996

Ddasaccident081, Hd-Aid

Global CWD Repository

The victim prodded onto a mine at 07:55. There was a 45cm gap between the accident site and the "recognised face of clearance", indicating that the victim was prodding ahead of his end of lane marker. It was difficult to determine whether the victim had prodded the ground up to the site of the explosion