Full-Text Articles in Plasma and Beam Physics

Crab Cavity And Cryomodule Development For Hl-Lhc, F. Carra, A. A. Carvalho, K. Artoos, S. Atieh, I. A. Santillana, S. Belomestnykh, A. Boucherie, J. P. Brachet, K. Brodzinski, G. Burt, S. U. De Silva, J. R. Delayen, R. Olave, H. Park Jan 2015

Crab Cavity And Cryomodule Development For Hl-Lhc, F. Carra, A. A. Carvalho, K. Artoos, S. Atieh, I. A. Santillana, S. Belomestnykh, A. Boucherie, J. P. Brachet, K. Brodzinski, G. Burt, S. U. De Silva, J. R. Delayen, R. Olave, H. Park

Physics Faculty Publications

The HL-LHC project aims at increasing the LHC luminosity by a factor 10 beyond the design value. The installation of a set of RF Crab Cavities to increase bunch crossing angle is one of the key upgrades of the program. Two concepts, Double Quarter Wave (DQW) and RF Dipole (RFD) have been proposed and are being produced in parallel for test in the SPS beam before the next long shutdown of CERN accelerator’s complex. In the retained concept, two cavities are hosted in one single cryomodule, providing thermal insulation and interfacing with RF coupling, tuning, cryogenics and beam vacuum. This …


Design Of Dressed Crab Cavities For The Hl-Lhc Upgrade, C. Zanoni, K. Artoos, S. Atieh, I. Aviles-Santillana, S. Belomestnykh, I. Ben-Zvi, J.P. Brachet, G. Burt, R. Calaga, O. Captina, S. U. De Silva, J. R. Delayen, A. May, K. Marinov, R. Olave, H. Park, N. Templeton Jan 2015

Design Of Dressed Crab Cavities For The Hl-Lhc Upgrade, C. Zanoni, K. Artoos, S. Atieh, I. Aviles-Santillana, S. Belomestnykh, I. Ben-Zvi, J.P. Brachet, G. Burt, R. Calaga, O. Captina, S. U. De Silva, J. R. Delayen, A. May, K. Marinov, R. Olave, H. Park, N. Templeton

Physics Faculty Publications

The HL-LHC upgrade relies on a set of RF crab cavities for reaching its goals. Two parallel concepts, the Double Quarter Wave (DQW) and the RF Dipole (RFD), are going through a comprehensive design process along with preparation of fabrication in view of extensive tests with beam in SPS. High Order Modes (HOM) couplers are critical in providing damping in RF cavities for operation in accelerators. HOM prototyping and fabrication have recently started at CERN. In this paper, an overview of the final geometry is provided along with an insight in the mechanical and thermal analyses performed to validate the …