Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons

Open Access. Powered by Scholars. Published by Universities.®

2025

Discipline
Institution
Keyword
Publication
Publication Type
File Type

Articles 271 - 300 of 516

Full-Text Articles in Environmental Monitoring

Re: Approval Letter For The Draft Final Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase I Data Summary Report (Dated March 21, 2025), Emma Rott Jun 2025

Re: Approval Letter For The Draft Final Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase I Data Summary Report (Dated March 21, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2025 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) Annual Update (Non-Residential Parcels And Residential Daycares), Pioneer Technical Services, Inc. Jun 2025

Draft Final 2025 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) Annual Update (Non-Residential Parcels And Residential Daycares), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Superfund Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels (Dated April 22, 2025), Emma Rott Jun 2025

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Superfund Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels (Dated April 22, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2025 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) Annual Update (Residential Parcels), Pioneer Technical Services, Inc. Jun 2025

Draft Final 2025 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) Annual Update (Residential Parcels), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Session 2: The Cases For Industry Self-Regulation And Government Regulation Of Ai, Boaz Ashkenazy, Kevin Bartholomew, Kevin De Liban, Christopher Yoo Jun 2025

Session 2: The Cases For Industry Self-Regulation And Government Regulation Of Ai, Boaz Ashkenazy, Kevin Bartholomew, Kevin De Liban, Christopher Yoo

SITIE Symposiums

In Session Two of the SITIE 2025 Symposium titled “The Cases for Industry Self-Regulation and Government Regulation of AI,” moderated by Seattle University Technology Ethics Initiative Director and Professor Onur Bakiner, the panelists discuss their perspectives and experiences with AI regulation. They share observations about the industry and delve into the topics of AI complexity, concerns around accountability, the shift to agentic AI, the current state of AI regulation, existing legal guardrails, and their outlook on AI regulation.


Session 1: Guidance From International Regulation Sources, Charlotte Tschider, Marie-Charlotte Roques-Bonnet Jun 2025

Session 1: Guidance From International Regulation Sources, Charlotte Tschider, Marie-Charlotte Roques-Bonnet

SITIE Symposiums

In Session One of the SITIE 2025 Symposium titled “Regulating Artificial Intelligence: From Where and When?”, Professor Mark Chinen moderated a panel featuring Professor Charlotte Tschider and Dr. Marie-Charlotte Roques-Bonnet. The discussion focused on international AI regulation, privacy, data governance, and the EU’s regulatory approach to AI oversight.


Final 2025 Residential Metals Abatement Program (Rmap) Rock Creek Cattle Company Borrow Submittal #1, Pioneer Technical Services, Inc. Jun 2025

Final 2025 Residential Metals Abatement Program (Rmap) Rock Creek Cattle Company Borrow Submittal #1, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Land Instability Compounds The Risk Of Sea Level Rise In Alexandria, Egypt, Rejoice Thomas, Sara Zouriq, Shahryar Fazli, Amr Fawzy, Nikolay Grisel Todorov, Surendra Maharjan, Wenzhao Li, Erik Linstead, Daniele Struppa, Hesham El-Askary Jun 2025

Land Instability Compounds The Risk Of Sea Level Rise In Alexandria, Egypt, Rejoice Thomas, Sara Zouriq, Shahryar Fazli, Amr Fawzy, Nikolay Grisel Todorov, Surendra Maharjan, Wenzhao Li, Erik Linstead, Daniele Struppa, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

The coastal region of Alexandria Governorate in Egypt holds significant strategic importance for trade while being susceptible to extreme weather events. It confronts a dual challenge of the rising sea levels and, as found in this study, land instability. While much attention has been rightly directed towards sea level rise (SLR), the stability of the land warrants equal consideration. Here, a comprehensive analysis of land stability is conducted in Alexandria by measuring Line of Sight (LOS) displacements and assessing their topographical, hydrological, and coastal impacts. Persistent Scatterer Interferometry technique is used to measure the LOS displacements in association with land …


Re: Approval Letter With Comment For The Butte Priority Soils Operable Unit (Bpsou) 2025 Revised Draft Final Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp) (Dated June 2, 2025), Molly Roby Jun 2025

Re: Approval Letter With Comment For The Butte Priority Soils Operable Unit (Bpsou) 2025 Revised Draft Final Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp) (Dated June 2, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report (December 6, 2024), Molly Roby Jun 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report (December 6, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2024 Field Evaluation Summary And Technical Recommendations Report (Dated April 10, 2025), Abby Peltomaa Jun 2025

Response To Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2024 Field Evaluation Summary And Technical Recommendations Report (Dated April 10, 2025), Abby Peltomaa

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2025 Residential Metals Abatement Program (Rmap) Rock Creek Cattle Company Borrow Submittal #1 (Dated May 23, 2025), Molly Roby Jun 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2025 Residential Metals Abatement Program (Rmap) Rock Creek Cattle Company Borrow Submittal #1 (Dated May 23, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Pfas In Naturally Occurring Surface Water Foams, Donovan S. Vitale Jun 2025

Pfas In Naturally Occurring Surface Water Foams, Donovan S. Vitale

Masters Theses

Surface Water Foam (SWF) and underlying Surface Water (SW) were collected from six distinct sites across Michigan using a novel sampling device. PFAS were detected in all SWF samples with total PFAS concentrations (Σ41 compounds, n=14) varying widely from 2,693 to 402,172 ng/L .SWF samples were enriched in high and intermediate molecular volume PFAS relative to SW samples (n=10) which were dominated by low molecular volume, short-chain PFAS with total PFAS concentrations ranging from 4.4 to 31 ng/L. Wet and dry SWFs were distinguished by appearance, liquid content, and PFAS composition. Dry SWFs had higher total PFAS concentrations than wet …


State And Transition Models For Mulga Rangelands Of Western Australia, Alison O'Donnell, Anna E. Richards, Suzanne Prober, Peter-Jon A. Waddell, Sarah Luxton, Ian Watson, Brett Abbott, Philip Thomas, Joshua E. Foster Jun 2025

State And Transition Models For Mulga Rangelands Of Western Australia, Alison O'Donnell, Anna E. Richards, Suzanne Prober, Peter-Jon A. Waddell, Sarah Luxton, Ian Watson, Brett Abbott, Philip Thomas, Joshua E. Foster

Natural resources published reports

This report details a collaborative project between the Western Australian Department of Primary Industries and Regional Development and CSIRO that focused on developing State and Transition Models (STMs) for mulga rangelands in Western Australia. The overarching aim of the project was to improve the common understanding of the characteristics and dynamics of mulga rangeland ecosystems and the expected impacts of management. Specifically, the project aimed to collate expert knowledge and monitoring information using a nationally consistent framework to develop quantitative and dynamic STMs. The geographic scope of the project covers the extensive mulga rangelands of Western Australia, particularly the Gascoyne …


Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase I Data Summary Report (Dsr), Pioneer Technical Services, Inc. Jun 2025

Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase I Data Summary Report (Dsr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jun 2025

Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jun 2025

Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


On-Site Water Management Field Sampling Plan (Fsp), 2025 Update, Mark Thompson, Rampart Solutions Jun 2025

On-Site Water Management Field Sampling Plan (Fsp), 2025 Update, Mark Thompson, Rampart Solutions

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Unveiling The Vital Role Of Blue Carbon In Mangroves: Understanding Environmental Influences, Jahnelle Howe Jun 2025

Unveiling The Vital Role Of Blue Carbon In Mangroves: Understanding Environmental Influences, Jahnelle Howe

Dissertations, Theses, and Capstone Projects

Mangrove ecosystems provide essential ecological services, including carbon sequestration, coastal protection, and heavy metal retention. However, their resilience and functionality are increasingly influenced by hurricanes, climate variability, and anthropogenic contamination. This dissertation integrates three research efforts examining mangrove canopy dynamics, carbon storage, and heavy metal contamination in two Puerto Rican mangrove systems: La Parguera and Laguna Grande.

Using remote sensing techniques (LiDAR and NDVI analysis), we assessed the impact of Hurricane Maria (Category 4, 2017) on mangrove canopy structure and vegetation health. Results revealed significant canopy height loss, with greater damage at Laguna Grande, where pre-storm canopy height and human …


Revised Draft Final Bpsou Unreclaimed Sites: Ur-05 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jun 2025

Revised Draft Final Bpsou Unreclaimed Sites: Ur-05 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Bpsou Unreclaimed Sites: Ur-05 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jun 2025

Final Bpsou Unreclaimed Sites: Ur-05 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Surface Temperature Analysis Report: Kellogg Creek Restoration & Community Enhancement Project, Dalton Palin Jun 2025

Surface Temperature Analysis Report: Kellogg Creek Restoration & Community Enhancement Project, Dalton Palin

University Honors Theses

Kellogg Creek is located in the Kellogg-Mt Scott watershed which flows through downtown Milwaukie, Oregon into the Willamette River. At the confluence of Kellogg Creek and the Willamette River is the Kellogg Dam. This dam impedes salmon, steelhead, and lamprey movement up Kellogg Creek, which is known historically as a salmon and steelhead rearing and migrating habitat. A plan to remove Kellogg Dam and restore 14 acres of Kellogg Creek is in progress by North Clackamas Watersheds Council (NCWC) and partners. Water temperature studies in Kellogg Creek have been conducted for the past several years, this report analyzed thermal surface …


2025 Revised Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. May 2025

2025 Revised Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Residential Metals Abatement Program (Rmap): Walkerville Park (Walkerville Drive & Ryan Road) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc. May 2025

Draft Final 2024 Residential Metals Abatement Program (Rmap): Walkerville Park (Walkerville Drive & Ryan Road) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2025 Residential Metals Abatement Program (Rmap) Rock Creek Cattle Company Borrow Submittal #1, Pioneer Technical Services, Inc. May 2025

Draft Final 2025 Residential Metals Abatement Program (Rmap) Rock Creek Cattle Company Borrow Submittal #1, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Multi-Pathway Residential Metals Abatement Program (Rmap) Plan (Dated March 27, 2025), Molly Roby May 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Multi-Pathway Residential Metals Abatement Program (Rmap) Plan (Dated March 27, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Ur-05 Remedial Action Work Plan (Rawp) (Dated March 14, 2025), Molly Roby May 2025

Re: Comment Letter For Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Ur-05 Remedial Action Work Plan (Rawp) (Dated March 14, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Bres No. 158 Site Evaluation Summary Report (Dated February 24, 2025), Molly Roby May 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Bres No. 158 Site Evaluation Summary Report (Dated February 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 158 – Waste Rock Dump Remedial Action Work Plan (Rawp) (Dated March 28, 2025), Molly Roby May 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 158 – Waste Rock Dump Remedial Action Work Plan (Rawp) (Dated March 28, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou)2020 Consent Decree Appendix D Attachment C Sections 7 And 8 Discrepancies, Mike Mcanulty May 2025

Butte Priority Soils Operable Unit (Bpsou)2020 Consent Decree Appendix D Attachment C Sections 7 And 8 Discrepancies, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.