Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons™

Open Access. Powered by Scholars. Published by Universities.®

Environmental Health and Protection

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 961 - 990 of 3056

Full-Text Articles in Environmental Monitoring

Draft Final 2024 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) Annual Update (Non-Residential Parcels And Residential Daycares), Pioneer Technical Services, Inc. May 2024

Draft Final 2024 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) Annual Update (Non-Residential Parcels And Residential Daycares), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Quality Assurance Project Plan (Qapp) (Dated February 26, 2024), Molly Roby May 2024

Re: Comments For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Quality Assurance Project Plan (Qapp) (Dated February 26, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Exploring Microplastic Concentrations And The Sedimentology Of San Diego's Offshore Benthic Environments, Rachel Sarner May 2024

Exploring Microplastic Concentrations And The Sedimentology Of San Diego's Offshore Benthic Environments, Rachel Sarner

Theses

Marine pollution studies are showing infiltration of plastic debris in remote parts of oceans including the deep sea. Microplastics (MPs) are being discovered not only in the ocean’s water column but also benthic sediments reaching thousands of meters in depth. This is the first study to analyze MP concentrations in conjunction with sedimentary characteristics from varying deep-sea environments (coastal, deep ocean, offshore terrace) in the Southern California Continental Borderland (CCB). Our goal for this study was to observe how the concentration and type (morphology, color, size) of microplastics varied with distance from shore, with water depth, and between different submarine …


Releases Of Hazardous Materials And Waste From Transportation Incidents In The Us: An Analysis To Increase Environmental Resiliency, Elizabeth Irene Tautges May 2024

Releases Of Hazardous Materials And Waste From Transportation Incidents In The Us: An Analysis To Increase Environmental Resiliency, Elizabeth Irene Tautges

Master's Projects and Capstones

Excessive amounts of hazardous materials and waste are released into the environment from transportation incidents. The United States federal government has regulations on the movement of hazardous material and waste during transportation, but preventing environmental releases is not a major priority. Multiple external factors influence the release of hazardous material and waste into the environment. Transportation incidents can be prevented by modifying the information collected in emergency reports, adjusting transportation patterns and conditions, and expressing negative environmental impacts, preparing responder efforts to communicate effectively. The components of previous hazardous materials and waste releases emphasize the needed improvements for increasing environmental …


Re: Comment Letter For Draft Bpsou Blacktail Creek Riparian Actions Remedial Design Work Plan (Rdwp) (Dated April 4, 2024), Emma Rott May 2024

Re: Comment Letter For Draft Bpsou Blacktail Creek Riparian Actions Remedial Design Work Plan (Rdwp) (Dated April 4, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Of The Revised Draft Final Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Qapp) (Dated 5/7/24), Emma Rott May 2024

Re: Approval Of The Revised Draft Final Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Qapp) (Dated 5/7/24), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Climate Change In Mississippi: A Journalistic Exploration Of Education And Activism, Kala Nance May 2024

Climate Change In Mississippi: A Journalistic Exploration Of Education And Activism, Kala Nance

Honors Theses

Climate Change in Mississippi: A Journalistic Exploration of Education and Activism takes an investigative, journalistic approach toward climate change in Mississippi. Specifically, how education and awareness have a direct impact on Mississippi industries, people and legislation. The project explored the level of acknowledgement of climate change across the state, and how certain individuals used advocacy to encourage education about climate change to raise awareness of the severity of the situation. This project includes interviews with university professors and researchers, non-profit organizations, educational groups and working individuals in some of Mississippi’s largest areas of employment. Additionally, this project draws on research …


Surface Water Quality Assessment Of Mingo Creek County Park: The Impacts Of Extractive Industries, Mikayla J. Bayto May 2024

Surface Water Quality Assessment Of Mingo Creek County Park: The Impacts Of Extractive Industries, Mikayla J. Bayto

Electronic Theses and Dissertations

Historical and current extraction operations and infrastructure, including natural gas pipelines, conventional and unconventional oil and natural gas drilling, longwall coal mining, and strip coal mining, occur throughout the Mingo Creek watershed of Washington County, Pennsylvania, including Mingo Creek County Park. Mingo Creek and several associated tributaries flow through Mingo Creek County Park, eventually discharging into the Monongahela River. An independent water quality study was conducted from June 2020 through July 2023 in Mingo Creek County Park to determine if historical and current extraction activities impact Mingo Creek and its associated tributaries. Weekly sampling of Mingo Creek and associated tributaries …


Draft Final 2024 Residential Metals Abatement Program (Rmap) Mandan Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. May 2024

Draft Final 2024 Residential Metals Abatement Program (Rmap) Mandan Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #13 [Copper Mountain Park], Pioneer Technical Services, Inc. May 2024

Draft Final 2024 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #13 [Copper Mountain Park], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Butte Priority Soils Operable Unit (Bpsou) Borrow Amendment Submittal #1, Pioneer Technical Services, Inc. May 2024

Draft Final 2024 Butte Priority Soils Operable Unit (Bpsou) Borrow Amendment Submittal #1, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Request For Change (Rfc-Rmap-2024-001), Mike Mcanulty May 2024

Re: Request For Change (Rfc-Rmap-2024-001), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Final 2021-2022 Residential Metals Abatement Program – Aware Early Head Start Soil Remedial Action Construction Completion Report (Dated April 26, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Final 2021-2022 Residential Metals Abatement Program – Aware Early Head Start Soil Remedial Action Construction Completion Report (Dated April 26, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) – Interior School Dust - Investigation Summary Report – East Middle School (Dated January 16, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) – Interior School Dust - Investigation Summary Report – East Middle School (Dated January 16, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit, Residential Metals Abatement Program Construction Completion Report (Non-Residential Parcels-Indoor Dust) - Butte Career Center/Webster Garfield (Dated March 29, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit, Residential Metals Abatement Program Construction Completion Report (Non-Residential Parcels-Indoor Dust) - Butte Career Center/Webster Garfield (Dated March 29, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft 2024 Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) – Montana Technological University (Prospector Residence Hall) (Dated March 21, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft 2024 Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) – Montana Technological University (Prospector Residence Hall) (Dated March 21, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) – United Congregational Church (Crayon Academy Preschool) (Dated April 2, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) – United Congregational Church (Crayon Academy Preschool) (Dated April 2, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Final 2021 Residential Metals Abatement Program – Head Start (Former Lincoln School) Soil Remedial Action Construction Completion Report (Dated April 26, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Final 2021 Residential Metals Abatement Program – Head Start (Former Lincoln School) Soil Remedial Action Construction Completion Report (Dated April 26, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 34e – Eveline Dump East., Mike Mcanulty May 2024

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 34e – Eveline Dump East., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 78 – Original Mine Yard., Mike Mcanulty May 2024

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 78 – Original Mine Yard., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 121 – Travona Dump., Mike Mcanulty May 2024

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 121 – Travona Dump., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 45 – Garfield, Mike Mcanulty May 2024

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 45 – Garfield, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 52 – Moscow Dump., Mike Mcanulty May 2024

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 52 – Moscow Dump., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 74 – West Gagnon Dump., Mike Mcanulty May 2024

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 74 – West Gagnon Dump., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 125 – Child Harold-2 Dump., Mike Mcanulty May 2024

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 125 – Child Harold-2 Dump., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 49 – Old Glory., Mike Mcanulty May 2024

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 49 – Old Glory., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2024 Draft Final Insufficiently Reclaimed Areas Quality Assurance Project Plan (Qapp) (Dated March 8, 2024), Molly Roby May 2024

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2024 Draft Final Insufficiently Reclaimed Areas Quality Assurance Project Plan (Qapp) (Dated March 8, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #11: Ur-49 And Ur-50, Atlantic Richfield Company May 2024

Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #11: Ur-49 And Ur-50, Atlantic Richfield Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Repository Screening Report, Pioneer Technical Services, Inc. May 2024

Final Repository Screening Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Insufficiently Reclaimed Sites Sampling Bres No. 08 – Belle Of Butte Site Evaluation Summary Report, Pioneer Technical Services, Inc. May 2024

Final 2022 Insufficiently Reclaimed Sites Sampling Bres No. 08 – Belle Of Butte Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.