Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons™

Open Access. Powered by Scholars. Published by Universities.®

Environmental Health and Protection

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 931 - 960 of 3056

Full-Text Articles in Environmental Monitoring

Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project - May 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis Jun 2024

Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project - May 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Berkeley Pit And Discharge Pilot Project Temperature Evaluation, 2023 Update, Mark Thompson, Dave Griffis Jun 2024

Berkeley Pit And Discharge Pilot Project Temperature Evaluation, 2023 Update, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Residential Metals Abatement Program Mandan Park Soil Rawp (Dated May 10, 2024), Molly Roby Jun 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Residential Metals Abatement Program Mandan Park Soil Rawp (Dated May 10, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 181 – Mountain Con-3 Dump, Mike Mcanulty Jun 2024

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 181 – Mountain Con-3 Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc. Jun 2024

Final Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels) (Dated June 7, 2024), Molly Roby Jun 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels) (Dated June 7, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites: Ur-35 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jun 2024

Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites: Ur-35 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The 2024 Draft Final Butte Priority Soils Operable Unit (Bpsou) Interim Site- Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 29, 2023), Emma Rott Jun 2024

Re: Comments On The 2024 Draft Final Butte Priority Soils Operable Unit (Bpsou) Interim Site- Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 29, 2023), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Of The Draft Final Silver Bow Creek Conservation Area Repository And Haul Route Quality Assurance Project Plan (Qapp) (Dated June 10, 2024), Emma Rott Jun 2024

Re: Approval Of The Draft Final Silver Bow Creek Conservation Area Repository And Haul Route Quality Assurance Project Plan (Qapp) (Dated June 10, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc. Jun 2024

Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Of The Butte Priority Soils Operable Unit Residential Metals Abatement Program Yard Submittals (Dated April 24, 2024) And Draft Rmap Remedial Action Work Plan (Dated May 7, 2024), Molly Roby Jun 2024

Re: Approval Of The Butte Priority Soils Operable Unit Residential Metals Abatement Program Yard Submittals (Dated April 24, 2024) And Draft Rmap Remedial Action Work Plan (Dated May 7, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Investigation Summary Report Kennedy Elementary School Post- Remedial Action Surface Dust Sampling, Christopher Berg, Elsie King Jun 2024

Residential Metals Abatement Program Investigation Summary Report Kennedy Elementary School Post- Remedial Action Surface Dust Sampling, Christopher Berg, Elsie King

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Uncontrolled Surface Flow Areas Remedial Design (Rd) Work Plan, Draft Bpsou Uncontrolled Surface Flow Areas Pre-Design Investigation (Pdi) Work Plan, 2023 Uncontrolled Surface Flow Area Soil Characterization Quality Assurance Project Plan (Qapp) [Dated January 25, 2024], Molly Roby Jun 2024

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Uncontrolled Surface Flow Areas Remedial Design (Rd) Work Plan, Draft Bpsou Uncontrolled Surface Flow Areas Pre-Design Investigation (Pdi) Work Plan, 2023 Uncontrolled Surface Flow Area Soil Characterization Quality Assurance Project Plan (Qapp) [Dated January 25, 2024], Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Western Kentucky University Stormwater Utility Survey 2024, Warren Campbell Jun 2024

Western Kentucky University Stormwater Utility Survey 2024, Warren Campbell

SEAS Faculty Publications

The main goal of this survey is to identify as many U.S. Stormwater Utilities (SWUs) as possible. Because many stormwater professionals do not have the time to respond to questionnaires, our primary method of identification was Internet searches. We searched key terms such as “stormwater utility,” “stormwater fee,” and “drainage fee.” We scoured online municipal codes such as Municode, AmLegal, Sterling, LexisNexis, General Code, and others. We searched through many city web websites to find utilities. We have also had many people contact me to update fees and identify new utilities. However, the data primarily comes from Internet sources and …


Berkeley Pit And Discharge Pilot Project Discharge System Operations Assurance Plan 2024 Update, Revision 1, Pioneer Technical Services, Inc., Wsp Environment & Infrastructure, Inc. Jun 2024

Berkeley Pit And Discharge Pilot Project Discharge System Operations Assurance Plan 2024 Update, Revision 1, Pioneer Technical Services, Inc., Wsp Environment & Infrastructure, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc. Jun 2024

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Berkeley Pit And Discharge Pilot Project Downstream Field Sampling Plan 2024 Update, Revision 1, Pioneer Technical Services, Inc. Jun 2024

Berkeley Pit And Discharge Pilot Project Downstream Field Sampling Plan 2024 Update, Revision 1, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Bpsou Unreclaimed Sites Anderson Shaft Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jun 2024

Draft Final Bpsou Unreclaimed Sites Anderson Shaft Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Environmental Fate And Transport Of Pfas In Wastewater Treatment Plant Effluent Discharged To Rapid Infiltration Basins, Kai M. Trobisch Jun 2024

Environmental Fate And Transport Of Pfas In Wastewater Treatment Plant Effluent Discharged To Rapid Infiltration Basins, Kai M. Trobisch

Masters Theses

Fate and transport of per- and polyfluoroalkyl substances (PFAS) in wastewater treatment plant (WWTP) effluent discharged to rapid infiltration basins (RIBs) is investigated using data from 26 WWTPs in Michigan and numerical modeling to assess the role of air-water interface (AWI) sorption in modulating mass fluxes to the saturated zone. Analysis of RIB physical properties yields a median separation distance of 6.5 meters between land surface and the water table, and a continuum of area-normalized effluent fluxes ranging from 0.01 to 0.62 meters per day. A subset of WWTPs with RIBs indicate higher PFAS concentrations in groundwater than effluent with …


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc-Rmap-2024-001) (Dated May 9, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc-Rmap-2024-001) (Dated May 9, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #11: Ur-49 And Ur-50 (Dated May 6, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #11: Ur-49 And Ur-50 (Dated May 6, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Borrow Amendment Submittal #1 (Dated May 9, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Borrow Amendment Submittal #1 (Dated May 9, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #11: Ur-49 And Ur-50 (Dated May 6, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #11: Ur-49 And Ur-50 (Dated May 6, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Final Request For Change (Rfc-Rmap-2024-001), Mike Mcanulty May 2024

Re: Final Request For Change (Rfc-Rmap-2024-001), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc-Rmap-2024-001) (Dated May 9, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc-Rmap-2024-001) (Dated May 9, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


What Climate Change Means For Nebraska May 2024

What Climate Change Means For Nebraska

United States Environmental Protection Agency: Publications

Nebraska’s climate is changing. In the past century, most of the state has warmed by at least one degree (F). The soil is becoming drier, and rainstorms are becoming more intense. In the coming decades, flooding is likely to increase, yet summers are likely to become increasingly hot and dry, which would reduce yields of some crops, require farmers to use more water, and amplify some risks to human health.

Our climate is changing because the earth is warming. People have increased the amount of carbon dioxide in the air by 40 percent since the late 1700s. Other heat-trapping greenhouse …


Re: Conditional Approval Letter Butte Priority Soils Operable Unit Grove Gulch Sedimentation Bay 100% Remedial Design (Dated March 22, 2024), Emma Rott May 2024

Re: Conditional Approval Letter Butte Priority Soils Operable Unit Grove Gulch Sedimentation Bay 100% Remedial Design (Dated March 22, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2023, Pioneer Technical Services, Inc. May 2024

Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Qapp), Josh Bryson May 2024

Re: Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Qapp), Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Qapp), Josh Bryson May 2024

Re: Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Qapp), Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.