Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons™

Open Access. Powered by Scholars. Published by Universities.®

Environmental Health and Protection

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1591 - 1620 of 3056

Full-Text Articles in Environmental Monitoring

Rmap Interior Schools Project, Liz Stacks Nov 2022

Rmap Interior Schools Project, Liz Stacks

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approved Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17, Mike Mcanulty Nov 2022

Approved Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Nov 2022

2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Quality Assurance Project Plan, 2023, Montana Bureau Of Mines And Geology Nov 2022

Quality Assurance Project Plan, 2023, Montana Bureau Of Mines And Geology

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Quality Assurance Project Plan, 2023 Butte Mine Flooding Operable Unit Long-Term Monitoring Program, Montana Bureau Of Mines And Geology Nov 2022

Quality Assurance Project Plan, 2023 Butte Mine Flooding Operable Unit Long-Term Monitoring Program, Montana Bureau Of Mines And Geology

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Concentration Of Heavy Metals In Three Distinct Algae Families From Humboldt County, California, Kodiak E. Miller, Caleb J. Strait, Jacob I. Begorre, Brittney L. Mitchell, Claire P. Till Oct 2022

Concentration Of Heavy Metals In Three Distinct Algae Families From Humboldt County, California, Kodiak E. Miller, Caleb J. Strait, Jacob I. Begorre, Brittney L. Mitchell, Claire P. Till

IdeaFest: Interdisciplinary Journal of Creative Works and Research from Cal Poly Humboldt

Anthropogenic impacts on marine environments can impact metal fluxes and concentrations available to marine species. Monitoring these impacts is necessary to better understand the interactions between the biotic and abiotic components of these ecosystems and mitigate the risk posed by harmful toxins introduced by human activities. Biomoniters, like macroscopic algae, are useful indicators that illuminate the bioaccumulation of toxins commonly introduced from anthropogenic activity. With this in mind, the concentrations of heavy metals zinc (Zn), nickel (Ni), and copper (Cu) were analyzed via the assessment of algae (Representatives from Ulva, Mastocarpus, Fucus) in two sites in Humboldt County: …


The Detection Of Periodic Reemergence Events Of Sars-Cov-2 Delta Strain In Communities Dominated By Omicron., Claire E. Westcott, Kevin J. Sokoloski, Eric C. Rouchka, Julia H. Chariker, Rochelle H. Holm, Ray A. Yeager, Joseph B. Moore Iv, Erin M. Elliott, Daymond Talley, Aruni Bhatnagar Oct 2022

The Detection Of Periodic Reemergence Events Of Sars-Cov-2 Delta Strain In Communities Dominated By Omicron., Claire E. Westcott, Kevin J. Sokoloski, Eric C. Rouchka, Julia H. Chariker, Rochelle H. Holm, Ray A. Yeager, Joseph B. Moore Iv, Erin M. Elliott, Daymond Talley, Aruni Bhatnagar

Faculty and Staff Scholarship

Despite entering an endemic phase, SARS-CoV-2 remains a significant burden to public health across the global community. Wastewater sampling has consistently proven utility to understanding SARS-CoV-2 prevalence trends and genetic variation as it represents a less biased assessment of the corresponding communities. Here, we report that ongoing monitoring of SARS-CoV-2 genetic variation in samples obtained from the wastewatersheds of the city of Louisville in Jefferson county Kentucky has revealed the periodic reemergence of the Delta strain in the presence of the presumed dominant Omicron strain. Unlike previous SARS-CoV-2 waves/emergence events, the Delta reemergence events were geographically restricted in the community …


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 8 – Belle Of Butte, Mike Mcanulty Oct 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 8 – Belle Of Butte, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 08 – Belle Of Butte, Mike Mcanulty Oct 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 08 – Belle Of Butte, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Residential Metals Abatement Program (Rmap), Interior School Soils – Remedial Action Work Plan (Rawp), Butte High School (Dated October 5, 2022), Nikia Greene Oct 2022

Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Residential Metals Abatement Program (Rmap), Interior School Soils – Remedial Action Work Plan (Rawp), Butte High School (Dated October 5, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For Revised Draft 2021 Stormwater Evaluation And Maintenance Report (Dated October 13, 2022), Nikia Greene Oct 2022

Approval Letter For Revised Draft 2021 Stormwater Evaluation And Maintenance Report (Dated October 13, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For Draft Final Bpsou Subdrain Pump Station Quality Assurance Project Plan (Dated October 7, 2022), Nikia Greene Oct 2022

Comment Letter For Draft Final Bpsou Subdrain Pump Station Quality Assurance Project Plan (Dated October 7, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Revision No. 2, Residential Metals Abatement Program (Rmap), Quality Assurance Project Plan (Qapp), Non-Residential Parcels – Indoor Dust (Dated October 3, 2022), Nikia Greene Oct 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Revision No. 2, Residential Metals Abatement Program (Rmap), Quality Assurance Project Plan (Qapp), Non-Residential Parcels – Indoor Dust (Dated October 3, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-36 Site Evaluation Summary Report (August 8, 2022), Nikia Greene Oct 2022

Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-36 Site Evaluation Summary Report (August 8, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-24 Site Evaluation Summary Report (July 26, 2022), Nikia Greene Oct 2022

Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-24 Site Evaluation Summary Report (July 26, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation (Pdi) Evaluation Report (Dated June 10, 2022), Nikia Greene Oct 2022

Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation (Pdi) Evaluation Report (Dated June 10, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On Berkeley Pit And Discharge Pilot Project, Quarterly Pilot Project Report, Second Quarter 2022, Dated September 21, 2022, Nikia Greene Oct 2022

Comments On Berkeley Pit And Discharge Pilot Project, Quarterly Pilot Project Report, Second Quarter 2022, Dated September 21, 2022, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-03 Site Evaluation Summary Report (August 3, 2022), Nikia Greene Oct 2022

Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-03 Site Evaluation Summary Report (August 3, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Bpsou Subdrain Pump Station Remedial Design (Rd) Work Plan, Pioneer Technical Services, Inc. Oct 2022

Final Bpsou Subdrain Pump Station Remedial Design (Rd) Work Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Urban Flooding Accelerates The Affordable Housing Shortage: A Case Study In Columbia, South Carolina, Mary Hannah Lindsay Oct 2022

Urban Flooding Accelerates The Affordable Housing Shortage: A Case Study In Columbia, South Carolina, Mary Hannah Lindsay

Theses and Dissertations

The state of South Carolina stands at the corner where climate change and the housing crisis meet. The affordable housing stock across South Carolina continues to deplete as its major cities experience urban flooding events due to outdated and weakened infrastructure, compounded by an intensification of storm systems brought on by a changing climate. Lower income communities are forced to accept lesser living conditions and less resilient housing options because these options are more affordable. Renters are often met with more challenges when navigating disaster recovery compared to homeowners. Using a case study established in Columbia, South Carolina of the …


Comment Letter For: Quality Assurance Project Plan: Long-Term Operation And Maintenance Of Railroad Assets, For Bnsf Railway Company And Union Pacific Railroad, Butte Priority Soils Operable Unit (Dated May 2022), Nikia Greene Sep 2022

Comment Letter For: Quality Assurance Project Plan: Long-Term Operation And Maintenance Of Railroad Assets, For Bnsf Railway Company And Union Pacific Railroad, Butte Priority Soils Operable Unit (Dated May 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For Draft Blacktail Creek (Btc) Groundwater Hydraulic Control System Remedial Design Work Plan (Rdwp) (Dated July 22, 2022), Nikia Greene Sep 2022

Comment Letter For Draft Blacktail Creek (Btc) Groundwater Hydraulic Control System Remedial Design Work Plan (Rdwp) (Dated July 22, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Revised Butte Reduction Works (Brw) Phase I Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Sep 2022

Final Revised Butte Reduction Works (Brw) Phase I Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Sep 2022

2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 34 – Eveline, Mike Mcanulty Sep 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 34 – Eveline, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 34 – Eveline And Response To Agency Comments, Mike Mcanulty Sep 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 34 – Eveline And Response To Agency Comments, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For: Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoons System – Second Quarter 2021 (Dated July 20, 2022), Nikia Greene Sep 2022

Approval Letter For: Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoons System – Second Quarter 2021 (Dated July 20, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump (Dated June 16, 2022), Nikia Greene Sep 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump (Dated June 16, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc) No. 1 To The Final 2022 Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) (Dated August 31, 2022), Nikia Greene Sep 2022

Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc) No. 1 To The Final 2022 Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) (Dated August 31, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 8 – Belle Of Butte (Dated August 2, 2022), Nikia Greene Sep 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 8 – Belle Of Butte (Dated August 2, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.