Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons™

Open Access. Powered by Scholars. Published by Universities.®

Environmental Health and Protection

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1561 - 1590 of 3056

Full-Text Articles in Environmental Monitoring

Draft - Sieve Study Report December 2022, Appendices, Ramboll Dec 2022

Draft - Sieve Study Report December 2022, Appendices, Ramboll

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comparison Of Sieved Soil Sample Results From Butte-Silver Bow Multi-Pathway Residential Metals Abatement Program: 250 Μm And 150 Μm Sieved Samples For Lead And Arsenic Enrichment Determination Atlantic Richfield Company Butte, Montana, Ramboll, Environmental Standards, Inc. Dec 2022

Comparison Of Sieved Soil Sample Results From Butte-Silver Bow Multi-Pathway Residential Metals Abatement Program: 250 Μm And 150 Μm Sieved Samples For Lead And Arsenic Enrichment Determination Atlantic Richfield Company Butte, Montana, Ramboll, Environmental Standards, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Revised Bpsou Subdrain Pump Station Remedial Design (Rd) Work Plan, Pioneer Technical Services, Inc. Nov 2022

Final Revised Bpsou Subdrain Pump Station Remedial Design (Rd) Work Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Nikia Greene Nov 2022

2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran Nov 2022

2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty Nov 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran Nov 2022

2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Solid Media Management Program Plan (Dated August 1, 2022), Nikia Greene Nov 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Solid Media Management Program Plan (Dated August 1, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Increased Aerosols Can Reverse Twomey Effect In Water Clouds Through Radiative Pathway, Pradeep Khatri, Tadahiro Hayasaka, Brent N. Holben, Ramesh P. Singh, Husi Letu, Sachchida N. Tripathi Nov 2022

Increased Aerosols Can Reverse Twomey Effect In Water Clouds Through Radiative Pathway, Pradeep Khatri, Tadahiro Hayasaka, Brent N. Holben, Ramesh P. Singh, Husi Letu, Sachchida N. Tripathi

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Aerosols play important roles in modulations of cloud properties and hydrological cycle by decreasing the size of cloud droplets with the increase of aerosols under the condition of fixed liquid water path, which is known as the first aerosol indirect effect or Twomey-effect or microphysical effect. Using high-quality aerosol data from surface observations and statistically decoupling the influence of meteorological factors, we show that highly loaded aerosols can counter this microphysical effect through the radiative effect to result both the decrease and increase of cloud droplet size depending on liquid water path in water clouds. The radiative effect due to …


Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty Nov 2022

Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty Nov 2022

Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump., Mike Mcanulty Nov 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran Nov 2022

2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Nov 2022

2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran Nov 2022

2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Nov 2022

2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Nikia Greene Nov 2022

2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Request For Information (Rfi) - 01 To The Butte Priority Soils Operable Unit (Bpsou) Final 2022 Unreclaimed Sites Quality Assurance Project Plan (Qapp) (Dated August 31, 2022), Nikia Greene Nov 2022

Approval Letter For The Request For Information (Rfi) - 01 To The Butte Priority Soils Operable Unit (Bpsou) Final 2022 Unreclaimed Sites Quality Assurance Project Plan (Qapp) (Dated August 31, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Nov 2022

2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Nexus Between Animal Welfare, Environment, And Sustainable Development: Resource Document, Wellbeing International Nov 2022

Nexus Between Animal Welfare, Environment, And Sustainable Development: Resource Document, Wellbeing International

Nexus – UNEP – Animal Welfare, Environment, Sustainable Development

This Resource Document has been developed to explore the Nexus (links) between Animal Welfare, the Environment, and Sustainable Development. The document includes relevant citations and reports addressing the topics encompassed by the Nexus. It will be maintained as a “living document” (subject to revision) in the WellBeing International Studies Repository. The original document and subsequent revisions will be kept in the Repository to provide a record of the changes.


Bmfou Pilot Project Rfc - Request For Change, Pioneer Technical Services, Inc. Nov 2022

Bmfou Pilot Project Rfc - Request For Change, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Draft Final Residential Metals Abatement Program (Rmap) Cherokee Park Soil Remedial Action Work Plan (Rawp) (Dated November 4, 2022), Nikia Greene Nov 2022

Approval Letter For The Draft Final Residential Metals Abatement Program (Rmap) Cherokee Park Soil Remedial Action Work Plan (Rawp) (Dated November 4, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Draft Final Residential Metals Abatement Program (Rmap) Koprivica Park Soil Remedial Action Work Plan (Rawp) (Dated November 4, 2022), Nikia Greene Nov 2022

Approval Letter For The Draft Final Residential Metals Abatement Program (Rmap) Koprivica Park Soil Remedial Action Work Plan (Rawp) (Dated November 4, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Table 2 Erm Rmap Dust 2022 Revision Summary Final, Environmental Resource Management (Erm) Nov 2022

Table 2 Erm Rmap Dust 2022 Revision Summary Final, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Table1 Erm Rmap Dust 2022 Revision Summary - Final Qualified, Environmental Resource Management (Erm) Nov 2022

Table1 Erm Rmap Dust 2022 Revision Summary - Final Qualified, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Ammonium Adduct Chemical Ionization To Investigate Anthropogenic Oxygenated Gas-Phase Organic Compounds In Urban Air, Peeyush Khare, Jordan E. Krechmer, Jo E. Machesky, Tori Hass-Mitchell, Cong Cao, Junqi Wang, Francesca Majluf, Felipe Lopez-Hilfiker, Sonja Malek, Will Wang, Karl Seltzer, Havala O. T. Pye, Roisin Commane, Brian C. Mcdonald, Ricardo Toledo-Crow, John E. Mak, Drew R. Gentner Nov 2022

Ammonium Adduct Chemical Ionization To Investigate Anthropogenic Oxygenated Gas-Phase Organic Compounds In Urban Air, Peeyush Khare, Jordan E. Krechmer, Jo E. Machesky, Tori Hass-Mitchell, Cong Cao, Junqi Wang, Francesca Majluf, Felipe Lopez-Hilfiker, Sonja Malek, Will Wang, Karl Seltzer, Havala O. T. Pye, Roisin Commane, Brian C. Mcdonald, Ricardo Toledo-Crow, John E. Mak, Drew R. Gentner

Advanced Science Research Center

Volatile chemical products (VCPs) and other non-combustion-related sources have become important for urban air quality, and bottom-up calculations report emissions of a variety of functionalized compounds that remain understudied and uncertain in emissions estimates. Using a new instrumental configuration, we present online measurements of oxygenated organic compounds in a US megacity over a 10 d wintertime sampling period, when biogenic sources and photochemistry were less active. Measurements were conducted at a rooftop observatory in upper Manhattan, New York City, USA using a Vocus chemical ionization time-of-flight mass spectrometer, with ammonium (NH as the reagent ion operating at 1 Hz. The …


Residential Metals Abatement Program Quality Assurance Memorandum (Non-Residential Parcels) – Recommended Qualification For Select Dust Cassette Data, Mike Mcanulty Nov 2022

Residential Metals Abatement Program Quality Assurance Memorandum (Non-Residential Parcels) – Recommended Qualification For Select Dust Cassette Data, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Residential Metals Abatement Program (Rmap) Cherokee Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Nov 2022

Draft Final 2022 Residential Metals Abatement Program (Rmap) Cherokee Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Residential Metals Abatement Program (Rmap) Koprivica Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Nov 2022

Draft Final 2022 Residential Metals Abatement Program (Rmap) Koprivica Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Erm Corrective Action Response, Elsie King Nov 2022

Erm Corrective Action Response, Elsie King

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.