Open Access. Powered by Scholars. Published by Universities.®

Articles 91 - 120 of 417

Full-Text Articles in Environmental Indicators and Impact Assessment

Final 2022 Unreclaimed Sites Sampling: Ur-22 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2026

Final 2022 Unreclaimed Sites Sampling: Ur-22 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2026

Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2026

Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2026

Final 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Unreclaimed Sites Sampling: Ur-28 Site Evaluation Summary Reportfinal 2022 Unreclaimed Sites Sampling: Ur-28 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2026

Final 2022 Unreclaimed Sites Sampling: Ur-28 Site Evaluation Summary Reportfinal 2022 Unreclaimed Sites Sampling: Ur-28 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Annual Operations And Maintenance Report 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services Jan 2026

2024 Annual Operations And Maintenance Report 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Annual Operations And Maintenance Report - 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services Jan 2026

2024 Annual Operations And Maintenance Report - 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Revised Unreclaimed Sites Ur-08 (Anderson Shaft) – Remedial Action Work Plan (Rawp) (Dated October 24, 2025), Molly Roby Dec 2025

Re: Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Revised Unreclaimed Sites Ur-08 (Anderson Shaft) – Remedial Action Work Plan (Rawp) (Dated October 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2025 Field Evaluation Of Reclaimed Sites Summary Report, Butte-Silver Bow Department Of Reclamation And Environmental Services Nov 2025

2025 Field Evaluation Of Reclaimed Sites Summary Report, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: 3rd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Oct 2025

Re: 3rd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No.94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp), Mike Mcanulty Oct 2025

Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No.94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soil Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 177 – North Alice Culvert, Mike Mcanulty Oct 2025

Re: Butte Priority Soil Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 177 – North Alice Culvert, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Remedial Action Work Plan (Rawp): Bres No. 104 (Colorado Dump) North Slope, Pioneer Technical Services, Inc. Oct 2025

Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Remedial Action Work Plan (Rawp): Bres No. 104 (Colorado Dump) North Slope, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling (Fsp): Bres No.177 - North Alice Culvert (Dated August 21, 2025), Molly Roby Sep 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling (Fsp): Bres No.177 - North Alice Culvert (Dated August 21, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No.94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp) (Dated August 21, 2025), Molly Roby Sep 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No.94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp) (Dated August 21, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump, Mike Mcanulty Sep 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Sep 2025

Re: Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump (Dated August 21, 2025), Molly Roby Sep 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump (Dated August 21, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites New And Mahoney (Ur-23) Construction Completion Report., Molly Roby Sep 2025

Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites New And Mahoney (Ur-23) Construction Completion Report., Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Epa Region 8 Optimized Ufp-Qapp Review Crosswalk, Environmental Protection Agency, Emma Rott Sep 2025

Epa Region 8 Optimized Ufp-Qapp Review Crosswalk, Environmental Protection Agency, Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Notice Of Intent To Abandon Bps07-05a And Bps07-05b (Dated July 14, 2025), Emma Rott Aug 2025

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Notice Of Intent To Abandon Bps07-05a And Bps07-05b (Dated July 14, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 177 – North Alice Culvert, Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 177 – North Alice Culvert, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump, Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 91 – Robert Emmett Dumps, Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 91 – Robert Emmett Dumps, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp)., Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp)., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: 2nd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Aug 2025

Re: 2nd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit Revised Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield Response To Agency Comments Received June 28, 2024, Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit Revised Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield Response To Agency Comments Received June 28, 2024, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 100 – Capri Motel – Arctic Dump, Mike Mcanulty Aug 2025

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 100 – Capri Motel – Arctic Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.