Open Access. Powered by Scholars. Published by Universities.®

Groundwater

Discipline
Institution
Publication Year
Publication
Publication Type

Articles 61 - 90 of 158

Full-Text Articles in Environmental Indicators and Impact Assessment

Re: Comment Letter For Butte Priority Soils Operable Unit Subdrain Pump Station 30% Remedial Design Package Submittal (Dated January 31, 2025), Emma Rott Feb 2025

Re: Comment Letter For Butte Priority Soils Operable Unit Subdrain Pump Station 30% Remedial Design Package Submittal (Dated January 31, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Draft Blacktail Creek Groundwater Hydraulic Control System Preliminary 30% Remedial Design Report (Dated October 28, 2024), Emma Rott Feb 2025

Re: Comment Letter For Draft Blacktail Creek Groundwater Hydraulic Control System Preliminary 30% Remedial Design Report (Dated October 28, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Groundwater Remedy Optimization Subdrain Pump Station Preliminary (30%) Remedial Design Package Submittal, Josh Bryson Jan 2025

Butte Priority Soils Operable Unit (Bpsou) Groundwater Remedy Optimization Subdrain Pump Station Preliminary (30%) Remedial Design Package Submittal, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Phase I Pre-Design Investigation Evaluation Report Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc. Jan 2025

Draft Final Phase I Pre-Design Investigation Evaluation Report Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Dec 2024

Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report (Dated September 16, 2024), Emma Rott Dec 2024

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report (Dated September 16, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc. Dec 2024

Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Dated September 25, 2024), Emma Rott Nov 2024

Comment Letter For Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Dated September 25, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Bpsou Draft Phase I Design Investigation Evaluation Report (Dated September 25, 2024), Emma Rott Nov 2024

Re: Comment Letter For Bpsou Draft Phase I Design Investigation Evaluation Report (Dated September 25, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Draft Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2019-2023 (Dated October 3, 2024), Emma Rott Nov 2024

Re: Comment Letter For Draft Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2019-2023 (Dated October 3, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson Oct 2024

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson Oct 2024

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc. Oct 2024

2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2023, Pioneer Technical Services, Inc. Oct 2024

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Proposed Plan To Amend The Remedial Action For The Butte Priority Soils Operable Unit, Environmental Protection Agency Oct 2024

Proposed Plan To Amend The Remedial Action For The Butte Priority Soils Operable Unit, Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2023, Pioneer Technical Services, Inc. Oct 2024

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc. Oct 2024

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Sep 2024

2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report, Stantec Consulting Services, Inc. Sep 2024

Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Groundwater Model Technical Memorandum, Stantec Consulting Services, Inc. Sep 2024

Groundwater Model Technical Memorandum, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Appendix D Comparison Of Historical Coc Results To Groundwater Remedial Goals, Stantec Consulting Services, Inc. Sep 2024

Appendix D Comparison Of Historical Coc Results To Groundwater Remedial Goals, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Draft Blacktail Creek Remediation And Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation Work Plan, Stantec Consulting Services, Inc. Sep 2024

2024 Draft Blacktail Creek Remediation And Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation Work Plan, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc. Sep 2024

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2022, Pioneer Technical Services, Inc. Mar 2024

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2022, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2022, Pioneer Technical Services, Inc. Mar 2024

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2022, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System -Third Quarter 2022 (Dated November 16, 2023), Emma Rott Feb 2024

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System -Third Quarter 2022 (Dated November 16, 2023), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Groundwater Vulnerability Assessment And Dye Trace Of War Fork River In Daniel Boone National Forest, Will Hemenover Jan 2024

Groundwater Vulnerability Assessment And Dye Trace Of War Fork River In Daniel Boone National Forest, Will Hemenover

Mahurin Honors College Capstone Experience/Thesis Projects

Daniel Boone National Forest plays a key role in preserving much of Kentucky’s karst regions, natural resources including timber, mineral deposits, and biodiversity, including over 300 species of concern. The health of these environments is determined by surface and groundwater streams in the forest, and karst systems are an integral environment where these systems are active. War Fork, a tributary to the Kentucky River in Jackson County, Kentucky, is a remote and understudied hydrologic system in the Daniel Boone National Forest that contains recreational and logging land uses. Due to karst areas being susceptible to contamination because of rapid water …


Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc. Dec 2023

Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc. Nov 2023

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Bpsou Buffalo Gulch Forebay Parcel 2023 Expedited Well Abandonment Plan, Josh Bryson Oct 2023

Bpsou Buffalo Gulch Forebay Parcel 2023 Expedited Well Abandonment Plan, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.