Open Access. Powered by Scholars. Published by Universities.®

Groundwater

Discipline
Institution
Publication Year
Publication
Publication Type

Articles 61 - 90 of 152

Full-Text Articles in Environmental Indicators and Impact Assessment

Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc. Dec 2024

Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Dated September 25, 2024), Emma Rott Nov 2024

Comment Letter For Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Dated September 25, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Bpsou Draft Phase I Design Investigation Evaluation Report (Dated September 25, 2024), Emma Rott Nov 2024

Re: Comment Letter For Bpsou Draft Phase I Design Investigation Evaluation Report (Dated September 25, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Draft Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2019-2023 (Dated October 3, 2024), Emma Rott Nov 2024

Re: Comment Letter For Draft Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2019-2023 (Dated October 3, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson Oct 2024

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson Oct 2024

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc. Oct 2024

2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc. Oct 2024

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Proposed Plan To Amend The Remedial Action For The Butte Priority Soils Operable Unit, Environmental Protection Agency Oct 2024

Proposed Plan To Amend The Remedial Action For The Butte Priority Soils Operable Unit, Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2023, Pioneer Technical Services, Inc. Oct 2024

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2023, Pioneer Technical Services, Inc. Oct 2024

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Sep 2024

2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report, Stantec Consulting Services, Inc. Sep 2024

Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Groundwater Model Technical Memorandum, Stantec Consulting Services, Inc. Sep 2024

Groundwater Model Technical Memorandum, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Appendix D Comparison Of Historical Coc Results To Groundwater Remedial Goals, Stantec Consulting Services, Inc. Sep 2024

Appendix D Comparison Of Historical Coc Results To Groundwater Remedial Goals, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc. Sep 2024

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Draft Blacktail Creek Remediation And Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation Work Plan, Stantec Consulting Services, Inc. Sep 2024

2024 Draft Blacktail Creek Remediation And Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation Work Plan, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2022, Pioneer Technical Services, Inc. Mar 2024

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2022, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2022, Pioneer Technical Services, Inc. Mar 2024

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2022, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System -Third Quarter 2022 (Dated November 16, 2023), Emma Rott Feb 2024

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System -Third Quarter 2022 (Dated November 16, 2023), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Groundwater Vulnerability Assessment And Dye Trace Of War Fork River In Daniel Boone National Forest, Will Hemenover Jan 2024

Groundwater Vulnerability Assessment And Dye Trace Of War Fork River In Daniel Boone National Forest, Will Hemenover

Mahurin Honors College Capstone Experience/Thesis Projects

Daniel Boone National Forest plays a key role in preserving much of Kentucky’s karst regions, natural resources including timber, mineral deposits, and biodiversity, including over 300 species of concern. The health of these environments is determined by surface and groundwater streams in the forest, and karst systems are an integral environment where these systems are active. War Fork, a tributary to the Kentucky River in Jackson County, Kentucky, is a remote and understudied hydrologic system in the Daniel Boone National Forest that contains recreational and logging land uses. Due to karst areas being susceptible to contamination because of rapid water …


Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc. Dec 2023

Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc. Nov 2023

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Bpsou Buffalo Gulch Forebay Parcel 2023 Expedited Well Abandonment Plan, Josh Bryson Oct 2023

Bpsou Buffalo Gulch Forebay Parcel 2023 Expedited Well Abandonment Plan, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2022, Pioneer Technical Services, Inc. Oct 2023

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2022, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2022, Pioneer Technical Services, Inc. Oct 2023

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2022, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Buffalo Gulch Forebay Parcel 2023 Expedited Well Abandonment Plan (Dated August 21, 2023, Nikia Greene Sep 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Buffalo Gulch Forebay Parcel 2023 Expedited Well Abandonment Plan (Dated August 21, 2023, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Pumping-Induced Drawdown Of Streams In Proximity To Agricultural Wells, Sara Alina Sternberg Sep 2023

Pumping-Induced Drawdown Of Streams In Proximity To Agricultural Wells, Sara Alina Sternberg

Master of Science in Environmental Sciences and Management Projects

In the context of unprecedented drought and aquifer overdraft in California, understanding surface water and groundwater connectivity have become increasingly important. While there is a clear understanding of how wells induce drawdown in aquifers (Theis, 1935; Hantush, 1965), secondary effects on local streams have not fully been considered. Current mathematical models targeting aquifer drawdown do not address stream drawdown response in aquifer-stream systems with strong connectivity; instead, they assume the stream to be a constant head boundary. In the drought-stricken and summer-dry climate of California, streams often run dry for months out of the year, which is currently not reflected …


Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Buffalo Gulch 60 Percent Design (Dated December 9, 2022), Nikia Greene Jul 2023

Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Buffalo Gulch 60 Percent Design (Dated December 9, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment For The Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability; Request For Change Brw-2023-02 (Dated May 15, 2023), Nikia Greene Jun 2023

Comment For The Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability; Request For Change Brw-2023-02 (Dated May 15, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.