Open Access. Powered by Scholars. Published by Universities.®

2026

Discipline
Institution
Keyword
Publication
Publication Type
File Type

Articles 301 - 330 of 462

Full-Text Articles in Environmental Indicators and Impact Assessment

Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran May 2026

Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Reclamation Improvement Sampling: Bres No. 78 – Original Mine Yard Site Evaluation Summary Report, Pioneer Technical Services, Inc. May 2026

Draft Final 2024 Reclamation Improvement Sampling: Bres No. 78 – Original Mine Yard Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Ecological Responses To Living Shoreline Restoration, Aaron S. Bland May 2026

Ecological Responses To Living Shoreline Restoration, Aaron S. Bland

Graduate Theses and Dissertations (2019 - present)

Coastal built communities and natural coastal ecosystems face similar and interrelated hazards: shoreline sediment erosion, shoreline retreat, and worsening storms, each of which is exacerbated by relative sea level rise. Living shorelines are coastal defense projects that incorporate natural habitats to provide more sustainable shoreline defense and improve the coastal ecosystem. Living shorelines have been widely adopted, but their performance has been highly variable, and the mechanisms of project success and failure are unclear. The overarching goal of this dissertation was to better understand the ecosystem responses to coastal restoration, focusing on the primary habitats of coastal salt marsh and …


Construction Impacts On Nutrient Loads In An Urban Stream In The Ozark Highlands, Matthew B. Wilson May 2026

Construction Impacts On Nutrient Loads In An Urban Stream In The Ozark Highlands, Matthew B. Wilson

Crop, Soil and Environmental Sciences Undergraduate Honors Theses

Degradation of water quality is primarily caused by human activity, including urbanization. Urban stream syndrome can be characterized as a stream that has undergone physical, chemical, and biological changes as a result of urbanization, which can include an influx of nutrients that can drive unwanted plant and algae growth. It is known that construction can result in untreated nutrients entering a stream; however, it is not understood how construction affects downstream nutrient transport. The objective of this study was to understand the impacts of construction on urban water quality in Tanglewood Branch in Fayetteville, Arkansas, in the Ozark Highlands, which …


Enhancing Walleye (Ogaa) Recruitment: Evaluating Assisted Reproduction As A Mitigation Strategy, Douglass Keiser May 2026

Enhancing Walleye (Ogaa) Recruitment: Evaluating Assisted Reproduction As A Mitigation Strategy, Douglass Keiser

Biology Graduate Theses

Over the past several decades, cold- and cool-water fish populations across the Upper Midwest, including Minnesota and Wisconsin, have shown troubling signs of decline. Among the most affected is the walleye/Ogaa (Sander vitreus), a species deeply embedded in the ecological balance, cultural identity, and economic vitality of the region, and central to the lifeways, treaty-reserved rights, and resource stewardship of Tribal Nations, including Ojibwe communities across the Upper Midwest. Despite ongoing stocking efforts and harvest regulations, many lake systems have experienced persistent declines in natural recruitment, prompting resource agencies to investigate the underlying causes. One such system is …


Final Silver Bow Creek Conservation Area Materials Management Plan, Pioneer Technical Services, Inc. May 2026

Final Silver Bow Creek Conservation Area Materials Management Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc. May 2026

Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Annual Operations And Maintenance Report 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services May 2026

2024 Annual Operations And Maintenance Report 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment (Dated April 28, 2026), Molly Roby Apr 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment (Dated April 28, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp) (Dated March 24, 2026), Molly Roby Apr 2026

Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp) (Dated March 24, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Joesphine Shaft (Bres No. 37) – Remedial Action Work Plan (Rawp) (Dated March 24, 2026), Molly Roby Apr 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Joesphine Shaft (Bres No. 37) – Remedial Action Work Plan (Rawp) (Dated March 24, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Dated April 17, 2026), Emma Rott Apr 2026

Re: Comment Letter For Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Dated April 17, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment, Mike Mcanulty Apr 2026

Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Apr 2026

Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Apr 2026

Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Whitehall Borrow Submittal #3 (Dated March 27, 2026), Molly Roby Apr 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Whitehall Borrow Submittal #3 (Dated March 27, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Uniform Federal Policyquality Assurance Project Plan Addendum, Hydrogeologic, Inc. Apr 2026

Draft Uniform Federal Policyquality Assurance Project Plan Addendum, Hydrogeologic, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operably Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System (Btl) Second Quarter 2025 (Dated April 10, 2026), Emma Rott Apr 2026

Re: Approval Letter For The Butte Priority Soils Operably Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System (Btl) Second Quarter 2025 (Dated April 10, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The 2023 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott Apr 2026

Re: Approval Letter For The 2023 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For Diggings East 95 % Remedial Design Package Submittal (Dated March 25, 2006), The Silver Bow Creek Conservation Area (Sbcca) – 95 Percent Programmatic Technical Specifications Submittal (Dated March 25, 2026), The Butte Priority Soils Operable Unit (Bpsou) Sbcca Operations And Maintenance (O&M) Plan (Dated March 24, 2026), And The Sbcca Final Principles For A Greener Cleanup Report (Dated February 4, 2026), Emma Rott Apr 2026

Re: Conditional Approval Letter For Diggings East 95 % Remedial Design Package Submittal (Dated March 25, 2006), The Silver Bow Creek Conservation Area (Sbcca) – 95 Percent Programmatic Technical Specifications Submittal (Dated March 25, 2026), The Butte Priority Soils Operable Unit (Bpsou) Sbcca Operations And Maintenance (O&M) Plan (Dated March 24, 2026), And The Sbcca Final Principles For A Greener Cleanup Report (Dated February 4, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The 2022 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott Apr 2026

Re: Approval Letter For The 2022 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The 2024 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott Apr 2026

Re: Approval Letter For The 2024 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc. Apr 2026

Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc. Apr 2026

Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc. Apr 2026

Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc. Apr 2026

Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, 60% Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System (Dated March 2, 2026), Emma Rott Apr 2026

Re: Comment Letter For The Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, 60% Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System (Dated March 2, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 96 – Washoe Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc. Apr 2026

Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 96 – Washoe Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Real And Perceived Barriers To Effective Use Of Cataract Surgical Supplies, Caitlin Davie, Lindsay K. Cloud, Scott Burris, Shaina Shiwdin, Brooke Sherry, Christina R. Prescott, Joel Schuman, David Palmer, David Chang, Daniel Parra, Cordelia Kwon, Margaret A. Tharp, Cassandra L. Thiel Apr 2026

Real And Perceived Barriers To Effective Use Of Cataract Surgical Supplies, Caitlin Davie, Lindsay K. Cloud, Scott Burris, Shaina Shiwdin, Brooke Sherry, Christina R. Prescott, Joel Schuman, David Palmer, David Chang, Daniel Parra, Cordelia Kwon, Margaret A. Tharp, Cassandra L. Thiel

Wills Eye Hospital Papers

INTRODUCTION: Cataract surgery, among the most common procedures worldwide, significantly contributes to climate change through both solid waste and air pollution, highlighting the urgent need for targeted interventions. Implementation faces hurdles including legal constraints and concerns about infection risks and malpractice.

METHODS: This article examines federal and state regulatory structures around two key waste reduction strategies: reduction of multidose medications and distribution of partly-used operating room medication to patients post-surgery.

RESULTS: We find little-to-no legitimate regulatory barriers to either waste reduction practice. Dispensing and redistributing partly-used medication has been codified in law in some states. Evidence-based reports indicate minimal risks …


Brown Pelican (Pelecanus Occidentalis) Groundings On A Four-Lane Divided Highway In South Texas: A Comparative Study Using Citizen Science, Bradley Evan Beer, Kevin W. Ryer, Md. Saydur Rahman, John H. Young Jr., Richard J. Kline Apr 2026

Brown Pelican (Pelecanus Occidentalis) Groundings On A Four-Lane Divided Highway In South Texas: A Comparative Study Using Citizen Science, Bradley Evan Beer, Kevin W. Ryer, Md. Saydur Rahman, John H. Young Jr., Richard J. Kline

School of Integrative Biological & Chemical Sciences Faculty Publications

The population of the once-endangered brown pelican (Pelecanus occidentalis) has increased over the past several decades and is now considered fully recovered. However, in south Texas, the combined effects of weather patterns, transportation infrastructure, and brown pelican biology have led to road mortalities on State Highway 48 (SH 48) at the Carl “Joe” Gayman Bridge. To mitigate these mortalities, the Texas Department of Transportation modified traffic barriers on SH 48. We aimed to examine the effect of the barrier change and determine which weather variables influence brown pelican groundings on SH 48. Citizen scientists monitored sections of SH …