Open Access. Powered by Scholars. Published by Universities.®
Environmental Indicators and Impact Assessment Commons™
Open Access. Powered by Scholars. Published by Universities.®
- Discipline
-
- Environmental Monitoring (492)
- Environmental Health and Protection (358)
- Sustainability (118)
- Engineering (117)
- Oil, Gas, and Energy (110)
-
- Materials Science and Engineering (109)
- Structural Materials (109)
- Mining Engineering (108)
- Energy Systems (107)
- Mechanical Engineering (107)
- Life Sciences (34)
- Social and Behavioral Sciences (33)
- Earth Sciences (27)
- Oceanography and Atmospheric Sciences and Meteorology (26)
- Geography (18)
- Climate (16)
- Natural Resources and Conservation (16)
- Remote Sensing (16)
- Water Resource Management (14)
- Natural Resources Management and Policy (12)
- Animal Sciences (11)
- Ecology and Evolutionary Biology (10)
- Atmospheric Sciences (9)
- Chemistry (9)
- Public Affairs, Public Policy and Public Administration (9)
- Environmental Chemistry (8)
- Environmental Studies (8)
- Institution
-
- Montana Tech Library (331)
- University of Kentucky (108)
- Chapman University (25)
- Department of Primary Industries and Regional Development, Western Australia (7)
- University of Texas Rio Grande Valley (6)
-
- Nova Southeastern University (4)
- Bemidji State University (3)
- City University of New York (CUNY) (3)
- University of Dar es Salaam (3)
- Utah State University (3)
- Belmont University (2)
- DePaul University (2)
- Eastern Washington University (2)
- Embry-Riddle Aeronautical University (2)
- Gettysburg College (2)
- Old Dominion University (2)
- St. Mary's University (2)
- University of New Hampshire (2)
- University of South Alabama (2)
- University of Tennessee at Chattanooga (2)
- Arkansas Tech University (1)
- Beirut Arab University (1)
- California Polytechnic State University, San Luis Obispo (1)
- Central Washington University (1)
- Emory University School of Law (1)
- Fordham University (1)
- Georgia Southern University (1)
- Hunan Provincial Institute of Scientific and Technology Information (1)
- Louisiana State University (1)
- Loyola Marymount University and Loyola Law School (1)
- Keyword
-
- Priority Soils (97)
- Field Sampling (64)
- Consent Decree (57)
- Unreclaimed Sites (48)
- Quality Assurance (43)
-
- Groundwater (32)
- Diggings East (21)
- Maintenance (19)
- Maintenance Report (19)
- Butte Treatment Lagoon (18)
- Monitoring (17)
- Silver Bow Creek (16)
- Clark Tailings (14)
- Insufficiently Reclaimed Sites (14)
- Stormwater Evaluation (14)
- Technical Memorandums (13)
- Site Evaluation (12)
- Waste Management (12)
- Evaluation Summary (11)
- Silver Bow Creek Conservation Area (10)
- Backfill (9)
- Groundwater Monitoring (9)
- Stormwater (9)
- Cover Soil (8)
- Grove Gulch (8)
- Remedial Design (8)
- Solid Media (8)
- Construction Completion Report (7)
- Maintenance Plan (7)
- Sedimentation (7)
- Publication
-
- Silver Bow Creek/Butte Area Superfund Site (331)
- World of Coal Ash Proceedings (108)
- Mathematics, Physics, and Computer Science Faculty Articles and Research (9)
- Biology, Chemistry, and Environmental Sciences Faculty Articles and Research (8)
- Honors Theses (4)
-
- Institute for ECHO Articles and Research (4)
- School of Earth, Environmental, & Marine Sciences Faculty Publications (3)
- All Graduate Theses and Dissertations, Fall 2023 to Present (2)
- DePaul Discoveries (2)
- Discovery Day - Daytona Beach (2)
- EWU Masters Thesis Collection (2)
- Journal of Earth and Life Science (2)
- Posters - 2026 (2)
- Publications and Research (2)
- Resource Assessment Reports (2)
- SECLER Data (2)
- School of Integrative Biological & Chemical Sciences Faculty Publications (2)
- Student Publications (2)
- Tanzania Journal of Science (2)
- UNH Cooperative Extension (2)
- ATU Scholars Symposium (1)
- All Current Publications (1)
- All Master's Theses (1)
- Animal production and livestock factsheets (1)
- Art Faculty Articles and Research (1)
- BAU Journal - Science and Technology (1)
- Biology Graduate Theses (1)
- Biosecurity factsheets (1)
- Civil & Environmental Engineering Faculty Publications (1)
- Civil Engineering Faculty Publications (1)
- Publication Type
- File Type
Articles 121 - 150 of 538
Full-Text Articles in Environmental Indicators and Impact Assessment
Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 180 – Tullamore Dumps, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025, Pioneer Technical Services, Inc.
Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final 2023 Unreclaimed Sites Sampling: Ur-42 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2023 Unreclaimed Sites Sampling: Ur-42 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Noogoora Burr And Its Control, Department Of Primary Industries And Regional Development, Western Australia
Noogoora Burr And Its Control, Department Of Primary Industries And Regional Development, Western Australia
Biosecurity factsheets
Noogoora burr, also known as cocklebur (Xanthium strumarium), is a declared pest in Western Australia (WA). This factsheet describes the nature of the plant with links to requirements that land owners/occupiers must adhere to and control methods.
Native to western United States of America. Locally abundant in parts of the Kimberley, especially near water courses. Occasionally found in the South West region of WA.
Re: Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Unreclaimed Sites Anderson Shaft Remedial Action Work Plan (Rawp) Request For Change Ur-2026-Ra-01, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026, Pioneer Technical Services, Inc.
Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Unreclaimed Sites Anderson Shaft Remedial Action Work Plan (Rawp) Request For Change Ur-2026-Ra-01, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Which Factors Are Most Important For Understanding Neighborhood-Scale Electrification Transitions In New York City, And How Do These Factors Interact Within Urban Energy Systems?, Aaryan Nair
Publications and Research
Building electrification has emerged as a central strategy for reducing greenhouse gas emissions from urban areas, yet its implementation remains uneven across cities due to differences in buildings, infrastructure, and local conditions. This literature review examines the factors that influence neighborhood-scale electrification transitions in New York City and explores how these factors interact within urban energy systems. Drawing on research from building science, energy systems, infrastructure planning, and sustainability transitions, the paper identifies five recurring categories of influence: building characteristics, demand characteristics, infrastructure conditions, planning and investment capacity, and socioeconomic conditions. The review finds that building age, typology, density, and …
Monthly Progress Report Butte Priority Soils Operable Unit Consent Decree Partial Remedial Design/Remedial Action And Operation And Maintenance - September 2026, Atlantic Richfield Company
Monthly Progress Report Butte Priority Soils Operable Unit Consent Decree Partial Remedial Design/Remedial Action And Operation And Maintenance - September 2026, Atlantic Richfield Company
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Paper Wasp Species Polistes Fuscatus (Hymenoptera: Vespidae) Tracks Urban Lead (Pb) Levels More Than Polistes Dominula, Lindsey R. Kemmerling, Anna L. Lovat, Allison A. Hanka, Emilie C. Snell-Rood
Paper Wasp Species Polistes Fuscatus (Hymenoptera: Vespidae) Tracks Urban Lead (Pb) Levels More Than Polistes Dominula, Lindsey R. Kemmerling, Anna L. Lovat, Allison A. Hanka, Emilie C. Snell-Rood
The Great Lakes Entomologist
Lead (Pb) is a persistent, toxic pollutant with widespread but inequitably distributed impacts, especially for humans in urban areas. The impacts of lead pollution on other organisms is largely unknown, even as they commonly experience exposure to lead alongside humans. We tested hypotheses regarding the lead concentrations of paper wasps across a gradient of pollution relative to soil and human lead levels, and correlations with wasp body condition. We collected two species of paper wasp across an urban gradient of lead pollution: Polistes fuscatus (Fabricius) (Hymenoptera: Vespidae), native to our study location, and Polistes dominula (Christ), nonnative to our study …
Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-35 Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-35 Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
The purpose of this Butte Priority Soils Operable Unit (BPSOU) Unreclaimed (UR) Sites Construction Completion Report (CCR) is to describe the tasks completed as described in the Final BPSOU UR Sites: UR-35 Remedial Action Work Plan (RAWP) (referred to herein as RAWP; Atlantic Richfield Company, 2025) (Appendix A). This CCR was prepared to outline Remedial Action (RA) tasks performed at the UR source area, UR-35, within the BPSOU (referred to herein as UR-35 Site or Site) as part of the Further Remedial Elements Scope of Work described in the BPSOU Consent Decree (EPA, 2020). All work was completed according to …
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft Diggings East Dewatering Treatability Study Pre-Design Investigation Work Plan (Pdiwp) (Dated August 24, 2026) And The 2026 Draft Diggings East Dewatering Treatability Study Quality Assurance Project Plan (Qapp) (Dated August 24, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: 2nd Quarter 2026 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Complementing Topographic Wetness With Sentinel-2 Phenological Indices To Map Soil Moisture Gradients In A Snowmelt-Driven Mountain Floodplain, Edward Turk
Master's Projects and Capstones
Soil moisture in mountain floodplains varies over a few meters, far finer than ground-based sensors or coarse satellite images resolve; conventional optical and microwave methods sense only the top few centimeters, missing the root zone that governs plant function and biogeochemistry. Similarly, topography-derived moisture variations miss micro-heterogeneities in moisture related to intrinsic soil heterogeneity and/or the root zone. This has important implications for our ability to characterize local hotspots of biogeochemical reactions, like those related to the generation of methane. In this work, we read vegetation as a proxy for the subsurface, using Sentinel-2 land-surface phenology to infer root-zone moisture, …
Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran
Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran
Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final 2026 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Woodard & Curran
Final 2026 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Draft Final Butte Mine Waste Repository Operations And Maintenance (O&M) Plan (Dated August 3, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-52 Area West Of Bres No. 133 – Dexter Mill, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-51 –Area Near Bres No. 50 – Zelia And Mountain Con Mine, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-53 – South Of Surprise Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: 2026 Spring Semi-Annual – Interim Site-Wide Groundwater Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-41 – Montana Street And Interstate-90, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 31 – Waste Dump #5 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 31 – Waste Dump #5 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
This Butte Priority Soils Operable Unit (BPSOU) Reclamation Improvement (RI) Site Evaluation Summary Report (SESR) presents results of soil sampling conducted on October 16, 2023, at the Butte Reclamation Evaluation System (BRES) No. 31 – Waste Dump #5 Site and adjacent areas (referred to herein as Site) within the BPSOU. The BPSOU Consent Decree (CD) (referred to herein as BPSOU CD; EPA, 2020) Appendix D, Attachment C Further Remedial Elements Scope of Work (FRESOW) prescribed further evaluation of sites reclaimed prior to establishment of the Butte Hill Revegetation Specifications (BHRS) (Appendix A to the BPSOU CD), which were initially established …
2026 Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
This Butte Priority Soils Operable Unit (BPSOU) Backfill and Cover Material Quality Assurance Project Plan (QAPP) provides the procedures and protocols necessary to conduct sampling and geotechnical characterization activities on import borrow and other externally sourced materials that will be used in backfill, cover soil, or engineered caps for upcoming BPSOU remediation activities described in the BPSOU Consent Decree (CD) (referred to as BPSOU CD; EPA, 2020a) Further Remedial Elements Scope of Work (FRESOW) (Attachment C of Appendix D to the BPSOU CD), the 2020 Residential Metals Abatement Program (RMAP) Unilateral Administrative Order (UAO) Amendment (EPA, 2020a), and ongoing maintenance …
Deep Learning-Based Burned Area Mapping Of California Wildfires Using Sentinel-2 And Landsat-8 Imagery Enhanced With Super-Resolution Techniques, Youngmin Seo, Seung Hee Kim, Menas Kafatos, Jinsoo Kim, Yangwon Lee
Deep Learning-Based Burned Area Mapping Of California Wildfires Using Sentinel-2 And Landsat-8 Imagery Enhanced With Super-Resolution Techniques, Youngmin Seo, Seung Hee Kim, Menas Kafatos, Jinsoo Kim, Yangwon Lee
Institute for ECHO Articles and Research
The increasing frequency of wildfires under a changing climate has led to extensive ecosystem destruction, highlighting the need for reliable burned area assessment using satellite imagery. Single-satellite data are constrained by observation gaps and interference from smoke and clouds, whereas multi-satellite data fusion can mitigate these limitations. Nonetheless, the fusion techniques still encounter challenges such as spatial information loss from resolution differences and cross-satellite domain mismatch. This study presents a burned area mapping framework that integrates super-resolution (SR) with transfer learning to address spatial and domain gaps in multi-satellite data. Specifically, Landsat-8 imagery is super-resolved to 7.5 m resolution, and …
2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
Insufficiently Reclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the exposure of historical mine waste. Although many source areas have been previously reclaimed, areas exist where reclamation was completed prior to the establishment of the Butte Hill Revegetation Specifications (BHRS) or reclaimed areas that have failed consecutive Butte Reclamation Evaluation System (BRES) inspections and now fall into either the Insufficiently Reclaimed or Reclamation Improvement category. In all these cases, additional work is required to comply with the BHRS to ensure the cap remains …
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
Unreclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the presence of historical mine waste. Although many source areas have been previously reclaimed, areas still exist in which soil has not yet been evaluated; such sites may provide a pathway for human exposure or impact surface water quality via stormwater runoff. These Unreclaimed sites will be evaluated in accordance with Appendix D, Attachment C, Section 8.0 of the BPSOU Consent Decree (referred to herein as CD) (EPA, 2020a).
This Quality Assurance Project Plan (QAPP) …
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
Unreclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the presence of historical mine waste. Although many source areas have been previously reclaimed, areas still exist in which soil has not yet been evaluated; such sites may provide a pathway for human exposure or impact surface water quality via stormwater runoff. These Unreclaimed sites will be evaluated in accordance with Appendix D, Attachment C, Section 8.0 of the BPSOU Consent Decree (referred to herein as CD) (EPA, 2020a).
This Quality Assurance Project Plan (QAPP) …
Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
This Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed (IR) Site Evaluation Summary Report (SESR) presents results of soil sampling conducted on August 12, 2022, at the IR source area Butte Reclamation Evaluation System (BRES) No. 16 – Curry Site and adjacent areas (referred to herein as Site) within the BPSOU. The BPSOU Consent Decree (CD) required further evaluation of this IR Site since reclamation was conducted in 1991, prior to establishment of the Butte Hill Revegetation Specifications (BHRS) (EPA, 2020) and because the Site did not meet BRES requirements during the 2017 assessment performed by the Clark Fork Watershed …