Open Access. Powered by Scholars. Published by Universities.®

2025

Discipline
Institution
Keyword
Publication
Publication Type
File Type

Articles 151 - 180 of 467

Full-Text Articles in Environmental Indicators and Impact Assessment

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc. Sep 2025

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft 2025 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Woodard & Curran Sep 2025

Draft 2025 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2025, Pioneer Technical Services, Inc. Sep 2025

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2019 Surface Water, Groundwater Seep, And Soil Characterization 2021-2023 Surface Water And Groundwater Seep Evaluation 2023 Waterloo Aps Soil And Groundwater Evaluation, Woodard & Curran Sep 2025

Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2019 Surface Water, Groundwater Seep, And Soil Characterization 2021-2023 Surface Water And Groundwater Seep Evaluation 2023 Waterloo Aps Soil And Groundwater Evaluation, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Epa Region 8 Optimized Ufp-Qapp Review Crosswalk, Environmental Protection Agency, Emma Rott Sep 2025

Epa Region 8 Optimized Ufp-Qapp Review Crosswalk, Environmental Protection Agency, Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2024, Pioneer Technical Services, Inc. Sep 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Characterizing Fish Communities Using Traditional And Emerging Monitoring Approaches In San Diego County Estuaries, Natalie Katherine De Wet Aug 2025

Characterizing Fish Communities Using Traditional And Emerging Monitoring Approaches In San Diego County Estuaries, Natalie Katherine De Wet

Theses

Fish communities are essential to estuarine health, playing key roles in food webs, nutrient cycling, and ecosystem functioning. However, the persistence of native fish populations is increasingly threatened by the cumulative impacts of coastal development, pollution, and climate change. Rapid, effective monitoring of species distributions is a priority, enabling timely conservation and management. However, the study of any ecosystem is limited by time, resources, and the consideration that research of a system can damage the ecosystem under study.

This research aimed to characterize fish species richness and evaluate the benefits and limitations of different estuary monitoring approaches. Specifically, this study …


Re: July 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister Aug 2025

Re: July 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – July 2025 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis Aug 2025

Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – July 2025 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Assessing Solar Radiation Patterns In Sarawak Using Measured Data And The Hargreaves-Samani Model For Photovoltaic Systems Application, Chun Yong Soo, Xian Hwa Chan, Wan Mohamad Husni Wan Mokhtar, Ahmad Rujhan Mohd Rais Aug 2025

Assessing Solar Radiation Patterns In Sarawak Using Measured Data And The Hargreaves-Samani Model For Photovoltaic Systems Application, Chun Yong Soo, Xian Hwa Chan, Wan Mohamad Husni Wan Mokhtar, Ahmad Rujhan Mohd Rais

Makara Journal of Technology

This study evaluates the Hargreaves-Samani model for estimating solar radiation in five locations in Sarawak: Bintulu, Kapit, Sri Aman, Kuching, and Miri (Subis), using minimum and maximum temperatures as key inputs. Analysis reveals stable minimum temperatures (19.7 °C to 28.8 °C), supporting consistent solar radiation patterns favorable for Photovoltaic (PV) performance. Miri (Subis) recorded the highest daily maximum temperature of 44.8 °C, while Kuching had the lowest at 24.7 °C, highlighting significant regional climatic variability. Analysis also indicates strong solar potential in Bintulu, Kapit, Sri Aman, Kuching, and Miri, with radiation peaking at 7.5 kWh/m², though seasonal variations impact PV …


Re: 2025 Spring Migration Seasonal Report For Berkeley Pit Waterfowl Protection Plan, Mark Thompson, Loren Burmeister Aug 2025

Re: 2025 Spring Migration Seasonal Report For Berkeley Pit Waterfowl Protection Plan, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For Bpsou Blacktail Creek Riparian Actions Draft Field Work Plan: Wetlands Delineation And Functional Assessment (Received August 8, 2025), Emma Rott Aug 2025

Re: Approval Letter For Bpsou Blacktail Creek Riparian Actions Draft Field Work Plan: Wetlands Delineation And Functional Assessment (Received August 8, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Assessment Of Bat Species (Mammalia: Chiroptera) In Canubas Cave, Kibawe, Bukidnon, Philippines, Jurriel Mari D. Alce, Jasmine Rouida M. Abenes, Leo Gabriel Cervantes, Matthew Eli K. Llacer, Von Zhyrus P. Oche, Ian Jay P. Saldo, Jhovel Roy D. Calo Aug 2025

Assessment Of Bat Species (Mammalia: Chiroptera) In Canubas Cave, Kibawe, Bukidnon, Philippines, Jurriel Mari D. Alce, Jasmine Rouida M. Abenes, Leo Gabriel Cervantes, Matthew Eli K. Llacer, Von Zhyrus P. Oche, Ian Jay P. Saldo, Jhovel Roy D. Calo

Sinaya: A Philippine Journal for Senior High School Teachers and Students

Bats, flying mammals, are essential to ecosystems, playing vital roles in pollination, seed dispersal, and insect control. Despite their ecological importance, no prior bat research exists for Canubas Cave, Kibawe, Bukidnon. This study aimed to assess the bat species at the site, documenting their morphometric data, diversity and richness indices, and conservation statuses. A purposive sampling design was implemented by setting up mist nets inside and outside the cave. A total of 13 individuals were identified, comprising three species from two families: Rousettus amplexicaudatus and Eonycteris spelaea (family Pteropodidae, fruit bats), and Miniopterus schreibersii (family Miniopteridae, bent-winged bats). Based on …


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Notice Of Intent To Abandon Bps07-05a And Bps07-05b (Dated July 14, 2025), Emma Rott Aug 2025

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Notice Of Intent To Abandon Bps07-05a And Bps07-05b (Dated July 14, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 1 2025 (Dated June 30, 2025), Emma Rott Aug 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 1 2025 (Dated June 30, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Superfund Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels (Revised On July 23, 2025), Emma Rott Aug 2025

Re: Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Superfund Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels (Revised On July 23, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 91 – Robert Emmett Dumps, Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 91 – Robert Emmett Dumps, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp)., Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp)., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump, Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 177 – North Alice Culvert, Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 177 – North Alice Culvert, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc. Aug 2025

Draft Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Site-Wide Surface Water Monitoring Data Summary Report (Dated May 30, 2025), Emma Rott Aug 2025

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Site-Wide Surface Water Monitoring Data Summary Report (Dated May 30, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


The Future Intensification Of Hydrological Extremes And Whiplashes In The Contiguous United States Increase Community Vulnerability, Surendra Maharjan, Wenzhao Li, John D. Bolten, Hesham El-Askary Aug 2025

The Future Intensification Of Hydrological Extremes And Whiplashes In The Contiguous United States Increase Community Vulnerability, Surendra Maharjan, Wenzhao Li, John D. Bolten, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

Hydroclimatic whiplash rapid shifts between drought and flood poses growing risks to U.S. communities. Here, we assess historical extremes and future projections using a normalized streamflow metric: the annual mean flow’s deviation from the 1981–2020 average, expressed as a fraction of that average. This metric is applied to United States Geological Survey records and Localized Constructed Analogs downscaled projections under Representative Concentration Pathways 4.5 and 8.5. Results reveal sharp regional disparities, with drought deficits exceeding 300% of normal flow during multi-year droughts. By linking hydrologic outcomes with the Federal Emergency Management Agency’s National Risk Index, we find that counties facing …


Butte Priority Soils Operable Unit (Bpsou) Revised Butte Hill Revegetation Specifications, Mike Mcanulty, Eric Hassler Aug 2025

Butte Priority Soils Operable Unit (Bpsou) Revised Butte Hill Revegetation Specifications, Mike Mcanulty, Eric Hassler

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: 2025 Spring Semi-Annual – Interim Site-Wide Groundwater Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Aug 2025

Re: 2025 Spring Semi-Annual – Interim Site-Wide Groundwater Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: 2nd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Aug 2025

Re: 2nd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 35 Del Monte Reclamation Improvement Field Sampling Plan (Fsp), Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 35 Del Monte Reclamation Improvement Field Sampling Plan (Fsp), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Mine Flooding Site Cd, Cv 02-35 Bu-Rfc, 2025 Second Quarter Report, Mark Thompson, Dave Griffis Aug 2025

Re: Butte Mine Flooding Site Cd, Cv 02-35 Bu-Rfc, 2025 Second Quarter Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit Revised Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield Response To Agency Comments Received June 28, 2024, Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit Revised Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield Response To Agency Comments Received June 28, 2024, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp) For Ur-19 – Butte, Anaconda & Pacific Railway From Montana Street To South Arizona Avenue – Montana Street Adjacent Parcel, Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp) For Ur-19 – Butte, Anaconda & Pacific Railway From Montana Street To South Arizona Avenue – Montana Street Adjacent Parcel, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.