Comment Letter For: Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoons System – Third Quarter 2022 (Dated December 23, 2022), Nikia Greene Mar 2023

Comment Letter For: Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoons System – Third Quarter 2022 (Dated December 23, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2021 Unreclaimed Sites Sampling Ur-40 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Mar 2023

Final 2021 Unreclaimed Sites Sampling Ur-40 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan, Draft Sampling And Analysis Plan (Dated January 24, 2023), Nikia Greene Mar 2023

Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan, Draft Sampling And Analysis Plan (Dated January 24, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2021 Unreclaimed Sites Sampling Ur-34 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Mar 2023

Final 2021 Unreclaimed Sites Sampling Ur-34 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Draft Final Butte Priority Soils Operable Unit (Bpsou) Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp) (Dated November 30, 2022), Nikia Greene Mar 2023

2023 Draft Final Butte Priority Soils Operable Unit (Bpsou) Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp) (Dated November 30, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-32 Site Evaluation Summary Report (December 16, 2022), Nikia Greene Mar 2023

Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-32 Site Evaluation Summary Report (December 16, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2021, Pioneer Technical Services, Inc. Mar 2023

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2021, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-05 Site Evaluation Summary Report (February 7, 2023), Nikia Greene Mar 2023

Approval Letter For The Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-05 Site Evaluation Summary Report (February 7, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Draft Final Butte Priority Soils Operable Unit (Bpsou) Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 29, 2022), Nikia Greene Mar 2023

2023 Draft Final Butte Priority Soils Operable Unit (Bpsou) Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 29, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Organic Pollutant Surface Water Sampling Quality Assurance Project Plan (Qapp) (Dated December 27, 2022), Nikia Greene Mar 2023

Comments On The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Organic Pollutant Surface Water Sampling Quality Assurance Project Plan (Qapp) (Dated December 27, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2023 Residential Metals Abatement Program Borrow Amendment Work Plan (Dated January 12, 2023), Nikia Greene Mar 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2023 Residential Metals Abatement Program Borrow Amendment Work Plan (Dated January 12, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-33 Site Evaluation Summary Report (February 7, 2023), Nikia Greene Feb 2023

Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-33 Site Evaluation Summary Report (February 7, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) Corrective Action Report, Nikia Greene Feb 2023

Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) Corrective Action Report, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2021 Insufficiently Reclaimed Sites Sampling Bres No. 154 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2023

Final 2021 Insufficiently Reclaimed Sites Sampling Bres No. 154 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2021 Insufficiently Reclaimed Sites Sampling Bres No. 104 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2023

Final 2021 Insufficiently Reclaimed Sites Sampling Bres No. 104 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Stormwater Bmps Repair, Inspection Report, And Maintenance Work Plan Bnsf Railway Company And Union Pacific Railroad Company Butte Priority Soils Operable Unit Kj 2299019.00, Doug Brannan P.E., Kennedy Jenks Feb 2023

2022 Stormwater Bmps Repair, Inspection Report, And Maintenance Work Plan Bnsf Railway Company And Union Pacific Railroad Company Butte Priority Soils Operable Unit Kj 2299019.00, Doug Brannan P.E., Kennedy Jenks

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Stormwater Bmps Repair, Inspection Report, And Maintenance Work Plan Bnsf Railway Company And Union Pacific Railroad Company Butte Priority Soils Operable Unit Kj 2299019.00, Doug Brannan P.E. Feb 2023

2022 Stormwater Bmps Repair, Inspection Report, And Maintenance Work Plan Bnsf Railway Company And Union Pacific Railroad Company Butte Priority Soils Operable Unit Kj 2299019.00, Doug Brannan P.E.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Residential Metals Abatement Program (Rmap) Walkerville Park (Alley Of North Main And Alley Of West Daly) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Feb 2023

Draft Final 2023 Residential Metals Abatement Program (Rmap) Walkerville Park (Alley Of North Main And Alley Of West Daly) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2021 Rmap Non-Residential Parcels Data Summary Report Silver Bow Creek/Butte Area Npl Site Bpsou, Environmental Standards, Inc., Pioneer Technical Services, Inc. Feb 2023

2021 Rmap Non-Residential Parcels Data Summary Report Silver Bow Creek/Butte Area Npl Site Bpsou, Environmental Standards, Inc., Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit (Bpsou) 2021 Unreclaimed Sites Sampling – Ur-39 Site Evaluation Summary Report (Dated January 4, 2023), Nikia Greene Feb 2023

Final Butte Priority Soils Operable Unit (Bpsou) 2021 Unreclaimed Sites Sampling – Ur-39 Site Evaluation Summary Report (Dated January 4, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2023 Residential Metals Abatement Program (Rmap) Rocker Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Feb 2023

Final 2023 Residential Metals Abatement Program (Rmap) Rocker Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2021 Unreclaimed Sites Sampling Ur-05 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2023

Final 2021 Unreclaimed Sites Sampling Ur-05 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2021 Unreclaimed Sites Sampling Ur-03 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2023

Final 2021 Unreclaimed Sites Sampling Ur-03 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2021 Unreclaimed Sites Sampling Ur-35 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2023

Final 2021 Unreclaimed Sites Sampling Ur-35 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2021 Unreclaimed Sites Sampling Ur-36 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2023

Final 2021 Unreclaimed Sites Sampling Ur-36 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2021 Unreclaimed Sites Sampling Ur-38 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2023

Final 2021 Unreclaimed Sites Sampling Ur-38 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2021 Unreclaimed Sites Sampling Ur-24 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2023

Final 2021 Unreclaimed Sites Sampling Ur-24 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2021 Unreclaimed Sites Sampling Ur-33 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2023

Final 2021 Unreclaimed Sites Sampling Ur-33 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Draft Final Butte Priority Soils Operable Unit (Bpsou) Temporary Construction Surface Water Performance Standards Variance Request For Future Remedial Elements (Fresow) Projects (Dated December 7, 2022), Nikia Greene Feb 2023

Comments On The Draft Final Butte Priority Soils Operable Unit (Bpsou) Temporary Construction Surface Water Performance Standards Variance Request For Future Remedial Elements (Fresow) Projects (Dated December 7, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final-2023 Update, Butte Mine Flooding Operable Unit, Butte Priority Soils Operable Unit And Mt Pole, Babcgwa Quality Assurance Project Plan, Ver 1, And Crosswalk, Montana Bureau Of Mines And Geology Jan 2023

Final-2023 Update, Butte Mine Flooding Operable Unit, Butte Priority Soils Operable Unit And Mt Pole, Babcgwa Quality Assurance Project Plan, Ver 1, And Crosswalk, Montana Bureau Of Mines And Geology

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.