Open Access. Powered by Scholars. Published by Universities.®

Articles 781 - 810 of 1832

Full-Text Articles in Environmental Indicators and Impact Assessment

Re: Approval Of The Butte Priority Soils Operable Unit Residential Metals Abatement Program Yard Submittals (Dated April 24, 2024) And Draft Rmap Remedial Action Work Plan (Dated May 7, 2024), Molly Roby Jun 2024

Re: Approval Of The Butte Priority Soils Operable Unit Residential Metals Abatement Program Yard Submittals (Dated April 24, 2024) And Draft Rmap Remedial Action Work Plan (Dated May 7, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Investigation Summary Report Kennedy Elementary School Post- Remedial Action Surface Dust Sampling, Christopher Berg, Elsie King Jun 2024

Residential Metals Abatement Program Investigation Summary Report Kennedy Elementary School Post- Remedial Action Surface Dust Sampling, Christopher Berg, Elsie King

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Uncontrolled Surface Flow Areas Remedial Design (Rd) Work Plan, Draft Bpsou Uncontrolled Surface Flow Areas Pre-Design Investigation (Pdi) Work Plan, 2023 Uncontrolled Surface Flow Area Soil Characterization Quality Assurance Project Plan (Qapp) [Dated January 25, 2024], Molly Roby Jun 2024

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Uncontrolled Surface Flow Areas Remedial Design (Rd) Work Plan, Draft Bpsou Uncontrolled Surface Flow Areas Pre-Design Investigation (Pdi) Work Plan, 2023 Uncontrolled Surface Flow Area Soil Characterization Quality Assurance Project Plan (Qapp) [Dated January 25, 2024], Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Berkeley Pit And Discharge Pilot Project Discharge System Operations Assurance Plan 2024 Update, Revision 1, Pioneer Technical Services, Inc., Wsp Environment & Infrastructure, Inc. Jun 2024

Berkeley Pit And Discharge Pilot Project Discharge System Operations Assurance Plan 2024 Update, Revision 1, Pioneer Technical Services, Inc., Wsp Environment & Infrastructure, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Bpsou Unreclaimed Sites Anderson Shaft Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jun 2024

Draft Final Bpsou Unreclaimed Sites Anderson Shaft Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Berkeley Pit And Discharge Pilot Project Downstream Field Sampling Plan 2024 Update, Revision 1, Pioneer Technical Services, Inc. Jun 2024

Berkeley Pit And Discharge Pilot Project Downstream Field Sampling Plan 2024 Update, Revision 1, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc. Jun 2024

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Borrow Amendment Submittal #1 (Dated May 9, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Borrow Amendment Submittal #1 (Dated May 9, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Final Request For Change (Rfc-Rmap-2024-001), Mike Mcanulty May 2024

Re: Final Request For Change (Rfc-Rmap-2024-001), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc-Rmap-2024-001) (Dated May 9, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc-Rmap-2024-001) (Dated May 9, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #11: Ur-49 And Ur-50 (Dated May 6, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #11: Ur-49 And Ur-50 (Dated May 6, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc-Rmap-2024-001) (Dated May 9, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc-Rmap-2024-001) (Dated May 9, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #11: Ur-49 And Ur-50 (Dated May 6, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #11: Ur-49 And Ur-50 (Dated May 6, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter Butte Priority Soils Operable Unit Grove Gulch Sedimentation Bay 100% Remedial Design (Dated March 22, 2024), Emma Rott May 2024

Re: Conditional Approval Letter Butte Priority Soils Operable Unit Grove Gulch Sedimentation Bay 100% Remedial Design (Dated March 22, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Qapp), Josh Bryson May 2024

Re: Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Qapp), Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Qapp), Josh Bryson May 2024

Re: Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Qapp), Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2023, Pioneer Technical Services, Inc. May 2024

Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Quality Assurance Project Plan (Qapp) (Dated February 26, 2024), Molly Roby May 2024

Re: Comments For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Quality Assurance Project Plan (Qapp) (Dated February 26, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) Annual Update (Non-Residential Parcels And Residential Daycares), Pioneer Technical Services, Inc. May 2024

Draft Final 2024 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) Annual Update (Non-Residential Parcels And Residential Daycares), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Of The Revised Draft Final Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Qapp) (Dated 5/7/24), Emma Rott May 2024

Re: Approval Of The Revised Draft Final Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Qapp) (Dated 5/7/24), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Draft Bpsou Blacktail Creek Riparian Actions Remedial Design Work Plan (Rdwp) (Dated April 4, 2024), Emma Rott May 2024

Re: Comment Letter For Draft Bpsou Blacktail Creek Riparian Actions Remedial Design Work Plan (Rdwp) (Dated April 4, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Residential Metals Abatement Program (Rmap) Mandan Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. May 2024

Draft Final 2024 Residential Metals Abatement Program (Rmap) Mandan Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #13 [Copper Mountain Park], Pioneer Technical Services, Inc. May 2024

Draft Final 2024 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #13 [Copper Mountain Park], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Request For Change (Rfc-Rmap-2024-001), Mike Mcanulty May 2024

Re: Request For Change (Rfc-Rmap-2024-001), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Butte Priority Soils Operable Unit (Bpsou) Borrow Amendment Submittal #1, Pioneer Technical Services, Inc. May 2024

Draft Final 2024 Butte Priority Soils Operable Unit (Bpsou) Borrow Amendment Submittal #1, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Final 2021 Residential Metals Abatement Program – Head Start (Former Lincoln School) Soil Remedial Action Construction Completion Report (Dated April 26, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Final 2021 Residential Metals Abatement Program – Head Start (Former Lincoln School) Soil Remedial Action Construction Completion Report (Dated April 26, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) – United Congregational Church (Crayon Academy Preschool) (Dated April 2, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) – United Congregational Church (Crayon Academy Preschool) (Dated April 2, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft 2024 Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) – Montana Technological University (Prospector Residence Hall) (Dated March 21, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft 2024 Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) – Montana Technological University (Prospector Residence Hall) (Dated March 21, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) – Interior School Dust - Investigation Summary Report – East Middle School (Dated January 16, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) – Interior School Dust - Investigation Summary Report – East Middle School (Dated January 16, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit, Residential Metals Abatement Program Construction Completion Report (Non-Residential Parcels-Indoor Dust) - Butte Career Center/Webster Garfield (Dated March 29, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit, Residential Metals Abatement Program Construction Completion Report (Non-Residential Parcels-Indoor Dust) - Butte Career Center/Webster Garfield (Dated March 29, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.