Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 601 - 630 of 4686

Full-Text Articles in Environmental Indicators and Impact Assessment

Draft Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc. Sep 2025

Draft Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 100 – Capri Motel – Arctic Dump, Mike Mcanulty Sep 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 100 – Capri Motel – Arctic Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit Draft Final Leak Infiltration Evaluation (Dated July 24, 2025), Emma Rott Sep 2025

Re: Comment Letter For Butte Priority Soils Operable Unit Draft Final Leak Infiltration Evaluation (Dated July 24, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Warming Induces Unexpectedly High Soil Respiration In A Wet Tropical Forest, Tana E. Wood, Colin Tucker, Aura M. Alonso-Rodríguez, M. Isabel Loza, Iana F. Grullón-Penkova, Molly A. Cavaleri, Christine S. O'Connell, Sasha C. Reed Sep 2025

Warming Induces Unexpectedly High Soil Respiration In A Wet Tropical Forest, Tana E. Wood, Colin Tucker, Aura M. Alonso-Rodríguez, M. Isabel Loza, Iana F. Grullón-Penkova, Molly A. Cavaleri, Christine S. O'Connell, Sasha C. Reed

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Tropical forests are a dominant regulator of the global carbon cycle, exchanging more carbon dioxide with the atmosphere than any other terrestrial biome. Climate models predict unprecedented climatic warming in tropical regions in the coming decades; however, in situ field warming studies are severely lacking in tropical forests. Here we present results from an in situ warming experiment in Puerto Rico, where soil respiration responses to +4 oC warming were assessed half-hourly for a year. Soil respiration rates were 42-204% higher in warmed relative to ambient plots, representing some of the highest soil respiration rates reported for any …


Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp) Revision 0, Woodard & Curran Sep 2025

Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp) Revision 0, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Superfund Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels (Dated April 22, 2025), Josh Bryson Sep 2025

Butte Priority Soils Operable Unit (Bpsou) Superfund Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels (Dated April 22, 2025), Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Sep 2025

Re: Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Sep 2025

Re: Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Bpsou Blacktail Creek Riparian Actions Revised Draft Final Uniform Federal Policy Quality Assurance Project Plan (Dated July 31, 2025), Emma Rott Sep 2025

Re: Comment Letter For Bpsou Blacktail Creek Riparian Actions Revised Draft Final Uniform Federal Policy Quality Assurance Project Plan (Dated July 31, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Sep 2025

Re: Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Sep 2025

Re: Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 181 – Mountain Con-3 Dump., Mike Mcanulty Sep 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 181 – Mountain Con-3 Dump., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump (Dated August 21, 2025), Molly Roby Sep 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump (Dated August 21, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 18 – Walkerville Ballfield, Mike Mcanulty Sep 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 18 – Walkerville Ballfield, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Settling Defendants Bmfou Annual Report Consent Decree For The Butte Mine Flooding Site Cd, Cv 02-35 Bu-Rfc Remedial Action – Implementation Of The Remedy Horseshoe Bend Water Treatment Plant 2024 Annual Report, Mark Thompson, Dave Griffis Sep 2025

Settling Defendants Bmfou Annual Report Consent Decree For The Butte Mine Flooding Site Cd, Cv 02-35 Bu-Rfc Remedial Action – Implementation Of The Remedy Horseshoe Bend Water Treatment Plant 2024 Annual Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 18 – Walkerville Ballfield (Dated August 13, 2025), Molly Roby Sep 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 18 – Walkerville Ballfield (Dated August 13, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 100 – Capri Motel-Arctic Dump (Dated August 12, 2025), Molly Roby Sep 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 100 – Capri Motel-Arctic Dump (Dated August 12, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites New And Mahoney (Ur-23) Construction Completion Report., Molly Roby Sep 2025

Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites New And Mahoney (Ur-23) Construction Completion Report., Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 120 – Bonanza Dump, Mike Mcanulty Sep 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 120 – Bonanza Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 120 – Bonanza Dump (Dated August 12, 2025), Molly Roby Sep 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 120 – Bonanza Dump (Dated August 12, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2019 Surface Water, Groundwater Seep, And Soil Characterization 2021-2023 Surface Water And Groundwater Seep Evaluation 2023 Waterloo Aps Soil And Groundwater Evaluation, Woodard & Curran Sep 2025

Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2019 Surface Water, Groundwater Seep, And Soil Characterization 2021-2023 Surface Water And Groundwater Seep Evaluation 2023 Waterloo Aps Soil And Groundwater Evaluation, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2024, Pioneer Technical Services, Inc. Sep 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2025, Pioneer Technical Services, Inc. Sep 2025

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Resource Assessment Report No. 03: Gascoyne Demersal Scalefish Resource 2024 Assessment, Emily A. Fisher, Rachel Marks, Sybrand A. Hesp, Ainslie Denham, Gary Jackson, David V. Fairclough Sep 2025

Resource Assessment Report No. 03: Gascoyne Demersal Scalefish Resource 2024 Assessment, Emily A. Fisher, Rachel Marks, Sybrand A. Hesp, Ainslie Denham, Gary Jackson, David V. Fairclough

Resource Assessment Reports

The Gascoyne Demersal Scalefish Resource (GDSR) comprises over 80 species inhabiting inshore (20-250 m deep) and offshore ( > 250 m deep) waters in the Gascoyne Coast Bioregion (GCB; south of Onslow to north of Kalbarri). The GDSR is primarily targeted by commercial, charter and recreational boat-based line fishers. Snapper and Goldband Snapper are the indicator species selected for monitoring and assessing the status of the inshore suite of the GDSR, while Ruby Snapper and Greybanded Grouper are the indicators for the offshore suite.

Periodic assessments of GDSR indicator species demonstrated that historical fishing of Snapper led to stocks being below …


Resource Assessment Report No. 04: North Coast Demersal Scalefish Resource - Kimberley 2025 Assessment, Fabian Trinnie, Rubie Evans-Powell, Ainslie Denham, Sybrand A. Hesp, Corey Wakefield, Craig L. Skepper, Brett Crisafulli, Stephen J. Newman Sep 2025

Resource Assessment Report No. 04: North Coast Demersal Scalefish Resource - Kimberley 2025 Assessment, Fabian Trinnie, Rubie Evans-Powell, Ainslie Denham, Sybrand A. Hesp, Corey Wakefield, Craig L. Skepper, Brett Crisafulli, Stephen J. Newman

Resource Assessment Reports

The North Coast Demersal Scalefish Resource (NCDSR) comprises ecological suites of tropical demersal fish species that occur predominantly in inshore waters (20–250 m deep) and offshore waters ( > 250 m deep) of the North Coast Bioregion (NCB). More than 60 demersal species are landed by fisheries operating in the Kimberley and Pilbara regions of the NCB each year, including high-value snappers (Lutjanidae), groupers (Epinephelidae), and emperors (Lethrinidae). As outlined in the NCDSR Harvest Strategy (DPIRD, 2017), the Kimberley resource is currently monitored through annual reviews of total removals and catch rate trends of indicator species, as well as periodic (every …


Draft 2025 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Woodard & Curran Sep 2025

Draft 2025 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Epa Region 8 Optimized Ufp-Qapp Review Crosswalk, Environmental Protection Agency, Emma Rott Sep 2025

Epa Region 8 Optimized Ufp-Qapp Review Crosswalk, Environmental Protection Agency, Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc. Sep 2025

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Resource Assessment Report No. 02: West Coast Demersal Scalefish Resource 2025 Assessment, Emily A. Fisher, David V. Fairclough, Elaine Lek, Jeremy Briggs, Sybrand Alex Hesp, Ainslie Denham Sep 2025

Resource Assessment Report No. 02: West Coast Demersal Scalefish Resource 2025 Assessment, Emily A. Fisher, David V. Fairclough, Elaine Lek, Jeremy Briggs, Sybrand Alex Hesp, Ainslie Denham

Resource Assessment Reports

The West Coast Demersal Scalefish Resource (WCDSR) comprises over 100 species inhabiting inshore (20-250 m deep) and offshore ( > 250 m deep) waters of the West Coast Bioregion (WCB; north of Kalbarri to east of Augusta). The WCDSR is primarily targeted by commercial, charter and recreational boat-based line fishers, including the commercial West Coast Demersal Scalefish (Interim) Managed Fishery (WCDSIMF). Indicator species selected for monitoring and assessing the status of the inshore suite of the WCDSR include Snapper, WA Dhufish and Baldchin Groper, while indicators for the offshore suite include Hapuku, Bass Groper and Blue-eye Trevalla.

The WCDSR is more …


Characterizing Fish Communities Using Traditional And Emerging Monitoring Approaches In San Diego County Estuaries, Natalie Katherine De Wet Aug 2025

Characterizing Fish Communities Using Traditional And Emerging Monitoring Approaches In San Diego County Estuaries, Natalie Katherine De Wet

Theses

Fish communities are essential to estuarine health, playing key roles in food webs, nutrient cycling, and ecosystem functioning. However, the persistence of native fish populations is increasingly threatened by the cumulative impacts of coastal development, pollution, and climate change. Rapid, effective monitoring of species distributions is a priority, enabling timely conservation and management. However, the study of any ecosystem is limited by time, resources, and the consideration that research of a system can damage the ecosystem under study.

This research aimed to characterize fish species richness and evaluate the benefits and limitations of different estuary monitoring approaches. Specifically, this study …