Open Access. Powered by Scholars. Published by Universities.®
Environmental Indicators and Impact Assessment Commons™
Open Access. Powered by Scholars. Published by Universities.®
- Institution
-
- Montana Tech Library (1829)
- University of Nebraska - Lincoln (763)
- University of Kentucky (589)
- Department of Primary Industries and Regional Development, Western Australia (305)
- Chapman University (198)
-
- University of Nevada, Las Vegas (160)
- Portland State University (51)
- Old Dominion University (44)
- University of Louisville (43)
- University of Arkansas, Fayetteville (29)
- Eastern Kentucky University (28)
- Seattle University School of Law (26)
- California Polytechnic State University, San Luis Obispo (24)
- City University of New York (CUNY) (23)
- University of Southern Maine (19)
- SIT Graduate Institute/SIT Study Abroad (18)
- Western Kentucky University (14)
- Molloy University (13)
- University of Dayton (13)
- Central Washington University (12)
- Nova Southeastern University (12)
- Stony Brook University (12)
- Wilfrid Laurier University (12)
- Center for the Blue Economy (11)
- Colby College (11)
- Bemidji State University (10)
- Stephen F. Austin State University (10)
- The University of San Francisco (10)
- University of Connecticut (10)
- Claremont Colleges (9)
- Keyword
-
- Priority Soils (398)
- Gas (251)
- And Energy; Structural Materials; Sustainability (248)
- Energy Systems; Environmental Indicators and Impact Assessment; Environmental Monitoring; Mining Engineering; Oil (248)
- Metals Abatement (228)
-
- Western Australia (189)
- Unreclaimed Sites (147)
- Field Sampling (143)
- Groundwater (142)
- Consent Decree (126)
- Quality Assurance (126)
- Water quality (108)
- Drought (103)
- Insufficiently Reclaimed Sites (101)
- Indoor Dust (74)
- United States (74)
- Berkeley Pit (67)
- Salinity (64)
- Soil Sampling (62)
- Butte Treatment Lagoon (57)
- Climate change (56)
- Lead (55)
- Stormwater (55)
- Groundwater Monitoring (54)
- Smelter Area (53)
- Sustainability (53)
- Lake Mead (Ariz. and Nev.) (51)
- Blacktail Creek (49)
- Environment (49)
- Monitoring (49)
- Publication Year
- Publication
-
- Silver Bow Creek/Butte Area Superfund Site (1829)
- World of Coal Ash Proceedings (580)
- United States Agricultural Commodities in Drought Archive (219)
- Nebraska Cooperative Fish and Wildlife Research Unit: Staff Publications (166)
- National Drought Mitigation Center: Faculty Publications (135)
-
- Mathematics, Physics, and Computer Science Faculty Articles and Research (98)
- Publications (WR) (85)
- Biology, Chemistry, and Environmental Sciences Faculty Articles and Research (74)
- DroughtScape: Quarterly Newsletter of the National Drought Mitigation Center (2007–2023) (68)
- High Plains Regional Climate Center: Staff Publications (64)
- Resource management technical reports (64)
- Natural resources published reports (59)
- Sustain Magazine (41)
- Irrigated Agricultural Development in the North (39)
- EKU Faculty and Staff Scholarship (28)
- Environmental Science and Management Faculty Publications and Presentations (25)
- SITIE Symposiums (25)
- Status and Trends for Virginia Chesapeake Bay (23)
- Wildlife Monitoring (23)
- Fisheries Research Reports (21)
- Prairie Post: Quarterly Newsletter of the High Plains Regional Climate Center (21)
- Biosecurity factsheets (20)
- Graduate Theses and Dissertations (17)
- Nebraska Department of Environmental Quality: Reports (16)
- Independent Study Project (ISP) Collection (15)
- Elizabeth River Reports (14)
- Electronic Theses and Dissertations (13)
- Environmental Science and Management Professional Master's Project Reports (13)
- Master of Science in Environmental Sciences and Management Projects (13)
- The Coastal Monitor (13)
- Publication Type
Articles 61 - 90 of 4608
Full-Text Articles in Environmental Indicators and Impact Assessment
Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-35 Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-35 Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
The purpose of this Butte Priority Soils Operable Unit (BPSOU) Unreclaimed (UR) Sites Construction Completion Report (CCR) is to describe the tasks completed as described in the Final BPSOU UR Sites: UR-35 Remedial Action Work Plan (RAWP) (referred to herein as RAWP; Atlantic Richfield Company, 2025) (Appendix A). This CCR was prepared to outline Remedial Action (RA) tasks performed at the UR source area, UR-35, within the BPSOU (referred to herein as UR-35 Site or Site) as part of the Further Remedial Elements Scope of Work described in the BPSOU Consent Decree (EPA, 2020). All work was completed according to …
Re: 2nd Quarter 2026 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Complementing Topographic Wetness With Sentinel-2 Phenological Indices To Map Soil Moisture Gradients In A Snowmelt-Driven Mountain Floodplain, Edward Turk
Master's Projects and Capstones
Soil moisture in mountain floodplains varies over a few meters, far finer than ground-based sensors or coarse satellite images resolve; conventional optical and microwave methods sense only the top few centimeters, missing the root zone that governs plant function and biogeochemistry. Similarly, topography-derived moisture variations miss micro-heterogeneities in moisture related to intrinsic soil heterogeneity and/or the root zone. This has important implications for our ability to characterize local hotspots of biogeochemical reactions, like those related to the generation of methane. In this work, we read vegetation as a proxy for the subsurface, using Sentinel-2 land-surface phenology to infer root-zone moisture, …
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft Diggings East Dewatering Treatability Study Pre-Design Investigation Work Plan (Pdiwp) (Dated August 24, 2026) And The 2026 Draft Diggings East Dewatering Treatability Study Quality Assurance Project Plan (Qapp) (Dated August 24, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Draft Final Butte Mine Waste Repository Operations And Maintenance (O&M) Plan (Dated August 3, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-41 – Montana Street And Interstate-90, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: 2026 Spring Semi-Annual – Interim Site-Wide Groundwater Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-53 – South Of Surprise Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-51 –Area Near Bres No. 50 – Zelia And Mountain Con Mine, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-52 Area West Of Bres No. 133 – Dexter Mill, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 31 – Waste Dump #5 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 31 – Waste Dump #5 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
This Butte Priority Soils Operable Unit (BPSOU) Reclamation Improvement (RI) Site Evaluation Summary Report (SESR) presents results of soil sampling conducted on October 16, 2023, at the Butte Reclamation Evaluation System (BRES) No. 31 – Waste Dump #5 Site and adjacent areas (referred to herein as Site) within the BPSOU. The BPSOU Consent Decree (CD) (referred to herein as BPSOU CD; EPA, 2020) Appendix D, Attachment C Further Remedial Elements Scope of Work (FRESOW) prescribed further evaluation of sites reclaimed prior to establishment of the Butte Hill Revegetation Specifications (BHRS) (Appendix A to the BPSOU CD), which were initially established …
Deep Learning-Based Burned Area Mapping Of California Wildfires Using Sentinel-2 And Landsat-8 Imagery Enhanced With Super-Resolution Techniques, Youngmin Seo, Seung Hee Kim, Menas Kafatos, Jinsoo Kim, Yangwon Lee
Deep Learning-Based Burned Area Mapping Of California Wildfires Using Sentinel-2 And Landsat-8 Imagery Enhanced With Super-Resolution Techniques, Youngmin Seo, Seung Hee Kim, Menas Kafatos, Jinsoo Kim, Yangwon Lee
Institute for ECHO Articles and Research
The increasing frequency of wildfires under a changing climate has led to extensive ecosystem destruction, highlighting the need for reliable burned area assessment using satellite imagery. Single-satellite data are constrained by observation gaps and interference from smoke and clouds, whereas multi-satellite data fusion can mitigate these limitations. Nonetheless, the fusion techniques still encounter challenges such as spatial information loss from resolution differences and cross-satellite domain mismatch. This study presents a burned area mapping framework that integrates super-resolution (SR) with transfer learning to address spatial and domain gaps in multi-satellite data. Specifically, Landsat-8 imagery is super-resolved to 7.5 m resolution, and …
2026 Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
This Butte Priority Soils Operable Unit (BPSOU) Backfill and Cover Material Quality Assurance Project Plan (QAPP) provides the procedures and protocols necessary to conduct sampling and geotechnical characterization activities on import borrow and other externally sourced materials that will be used in backfill, cover soil, or engineered caps for upcoming BPSOU remediation activities described in the BPSOU Consent Decree (CD) (referred to as BPSOU CD; EPA, 2020a) Further Remedial Elements Scope of Work (FRESOW) (Attachment C of Appendix D to the BPSOU CD), the 2020 Residential Metals Abatement Program (RMAP) Unilateral Administrative Order (UAO) Amendment (EPA, 2020a), and ongoing maintenance …
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
Unreclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the presence of historical mine waste. Although many source areas have been previously reclaimed, areas still exist in which soil has not yet been evaluated; such sites may provide a pathway for human exposure or impact surface water quality via stormwater runoff. These Unreclaimed sites will be evaluated in accordance with Appendix D, Attachment C, Section 8.0 of the BPSOU Consent Decree (referred to herein as CD) (EPA, 2020a).
This Quality Assurance Project Plan (QAPP) …
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
Unreclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the presence of historical mine waste. Although many source areas have been previously reclaimed, areas still exist in which soil has not yet been evaluated; such sites may provide a pathway for human exposure or impact surface water quality via stormwater runoff. These Unreclaimed sites will be evaluated in accordance with Appendix D, Attachment C, Section 8.0 of the BPSOU Consent Decree (referred to herein as CD) (EPA, 2020a).
This Quality Assurance Project Plan (QAPP) …
2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
Insufficiently Reclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the exposure of historical mine waste. Although many source areas have been previously reclaimed, areas exist where reclamation was completed prior to the establishment of the Butte Hill Revegetation Specifications (BHRS) or reclaimed areas that have failed consecutive Butte Reclamation Evaluation System (BRES) inspections and now fall into either the Insufficiently Reclaimed or Reclamation Improvement category. In all these cases, additional work is required to comply with the BHRS to ensure the cap remains …
Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 17 – Paymaster Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 17 – Paymaster Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
This Butte Priority Soils Operable Unit (BPSOU) Reclamation Improvement (RI) Site Evaluation Summary Report (SESR) presents results of soil sampling conducted on October 11, 2023, at the Butte Reclamation Evaluation System (BRES) No. 17 – Paymaster Dump Site and adjacent areas (referred to herein as Site) within the BPSOU. The BPSOU Consent Decree (CD) (referred to herein as BPSOU CD; EPA, 2020) Appendix D, Attachment C Further Remedial Elements Scope of Work (FRESOW) prescribed further evaluation of sites reclaimed prior to establishment of the Butte Hill Revegetation Specifications (BHRS) (Appendix A to the BPSOU CD), which were initially established in …
Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
This Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed (IR) Site Evaluation Summary Report (SESR) presents results of soil sampling conducted on August 12, 2022, at the IR source area Butte Reclamation Evaluation System (BRES) No. 16 – Curry Site and adjacent areas (referred to herein as Site) within the BPSOU. The BPSOU Consent Decree (CD) required further evaluation of this IR Site since reclamation was conducted in 1991, prior to establishment of the Butte Hill Revegetation Specifications (BHRS) (EPA, 2020) and because the Site did not meet BRES requirements during the 2017 assessment performed by the Clark Fork Watershed …
Re: Approval Letter For The Diggings East 100% Remedial Design Package Submittal (Dated July 23, 2026), The 100% Sbcca Programmatic Technical Specifications Submittal (Technical Specifications) (Dated May 29, 2026), The Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap) (Dated July 29, 2026), The Final Sbcca Construction Monitoring Quality Assurance Project Plan (Qapp) (Dated July 29, 2026), And The Final Sbcca Materials Management Plan (Mmp) (Dated July 29, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp), Woodard & Curran
Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp), Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Quantitative Mapping And Mitigation Of Light Pollution At Erau, Desireé Robinson, Marcus Flesher, Axon Deadrick, Conner Callahan, Jarrett Usui, Josef Kaelin, Douglas Griswold, Raiden Keefer, Harrison A. Zimmermann, Cole Gresham, Maya Curtis, Ahnika Gee
Quantitative Mapping And Mitigation Of Light Pollution At Erau, Desireé Robinson, Marcus Flesher, Axon Deadrick, Conner Callahan, Jarrett Usui, Josef Kaelin, Douglas Griswold, Raiden Keefer, Harrison A. Zimmermann, Cole Gresham, Maya Curtis, Ahnika Gee
Discovery Day - Daytona Beach
Light pollution is an increasingly urgent environmental and public safety concern that affects energy costs, astronomical research, ecological systems, human health, and aviation. At Embry-Riddle Aeronautical University (ERAU), artificial lighting from campus infrastructure and adjacent airport operations contributes to elevated skyglow, limiting the performance of the university’s 1-meter telescope and degrading the nighttime environment. This project seeks to quantitatively map and analyze light pollution across the ERAU Daytona Beach campus using custom-built Sky Quality Meters (SQMs) integrated with environmental sensors and mounted on an unmanned aerial system (UAS). By collecting calibrated sky brightness measurements at multiple altitudes and geospatial coordinates, …
Butte Priority Soils Operable Unit (Bpsou) 2026 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For Draft Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase Ii Data Summary Report (Dsr) (Dated June 26, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 1 2026 (Dated June 26, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Final 2024 Unreclaimed Sites Sampling: Ur-46 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Butte Priority Soils Operable Unit Final 2024 Unreclaimed Sites Sampling: Ur-46 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Influence Of Transboundary Wildfire Smoke On Fine Particulate Matter Concentrations At South Texas Border Schools, Sai Deepak Pinakana, Kabir Bahadur Shah, Owen Temby, Dawid K. Wladyka, Juan L. Gonzalez, Md Saydur Rahman, Katarzyna Sepielak, Amit U. Raysoni
Influence Of Transboundary Wildfire Smoke On Fine Particulate Matter Concentrations At South Texas Border Schools, Sai Deepak Pinakana, Kabir Bahadur Shah, Owen Temby, Dawid K. Wladyka, Juan L. Gonzalez, Md Saydur Rahman, Katarzyna Sepielak, Amit U. Raysoni
School of Earth, Environmental, & Marine Sciences Faculty Publications
Exposure to air pollutants in indoor and outdoor school environments poses significant health risks to children due to their heightened vulnerability. Increasing wildfire frequency has intensified transboundary smoke transport, with border communities among the first to experience associated air quality impacts. While the impacts of wildfires on air quality are increasingly recognized through satellite observations and modeling, ground-based observations remain scarce in under-monitored regions. Low-cost air sensors were deployed across schools in the Roma and Rio Grande City areas of Starr County, along the U.S.–Mexico border, for 146-days from November 2023 to April 2024. The raw sensor measurements were corrected …
Final Bpsou Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Final Bpsou Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Butte Mine Waste Repository Operation And Maintenance (O&M) Plan, Pioneer Technical Services, Inc.
Revised Draft Final Butte Mine Waste Repository Operation And Maintenance (O&M) Plan, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Bpsou Grove Gulch Sedimentation Bay Draft Remedial Action Construction Completion Report (Ccr), Woodard & Curran
Bpsou Grove Gulch Sedimentation Bay Draft Remedial Action Construction Completion Report (Ccr), Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Land Condition Standards For The Western Australian Nullarbor Pastoral Region, Peter-Jon A. Waddell, Wayne J. Fletcher
Land Condition Standards For The Western Australian Nullarbor Pastoral Region, Peter-Jon A. Waddell, Wayne J. Fletcher
Natural resources published reports
This report outlines the quantitative land condition standards that define acceptable pastoral land condition for the Western Australian part of the Nullarbor, to meet the regulatory requirements of the Land Administration Act 1997 and the Soil and Land Conservation Act 1945.
The Department of Primary Industries and Regional Development is developing regional-level pastoral land condition standards for Western Australia as a critical component of the Framework for sustainable pastoral management – revised edition (Fletcher 2022), the purpose of which is to address the Office of the Auditor General’s recommendations to improve the management of pastoral lands in WA …