Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 541 - 570 of 4686

Full-Text Articles in Environmental Indicators and Impact Assessment

Elucidating The Relationship Between Water Quality And Antibiotic Resistance Of Rainwater Microbes Across Western Humboldt County, Theo P. Murphy, Eve Wendley, Justice Laskowski, Tyler Paredes Nov 2025

Elucidating The Relationship Between Water Quality And Antibiotic Resistance Of Rainwater Microbes Across Western Humboldt County, Theo P. Murphy, Eve Wendley, Justice Laskowski, Tyler Paredes

Humboldt Journal of Microbiology

Limited studies have been conducted regarding the fecal contamination and microbial dispersal through rainwater, with no known studies investigating the potential connection between antibiotic resistant microbes and water quality in rainwater. This study seeks to identify the presence of a correlation between water quality and incidence of antibiotic resistance in rainwater microbes. We hypothesize that there will be a correlation between these two variables. We additionally anticipate a high incidence of fecal contamination across rural and urban collection sites alike, with fecal contamination being more prevalent in rural areas than urban locals. To determine water quality, we measured the concentration …


Draft 2026 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Woodard & Curran Nov 2025

Draft 2026 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran Nov 2025

Draft 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Living Shoreline Prioritization And Hydrodynamic Habitat Suitability Models For Restoration In The Indian River Lagoon And Lake Worth Lagoon, Florida, Kelly M. Kibler, Melinda J. Donnelly, Vincent Encomio, Madison Giuntoli, Manisha Thenuwara, Brice Bennett, Laura Andrade Barron, Mariam Sonbol, Wynter Raine Seppala, Namritha Ramakrishnan, Jennifer Jordan Báez, Beth Orlando, Irene Arpayoglou, Melissa Meisenburg Nov 2025

Living Shoreline Prioritization And Hydrodynamic Habitat Suitability Models For Restoration In The Indian River Lagoon And Lake Worth Lagoon, Florida, Kelly M. Kibler, Melinda J. Donnelly, Vincent Encomio, Madison Giuntoli, Manisha Thenuwara, Brice Bennett, Laura Andrade Barron, Mariam Sonbol, Wynter Raine Seppala, Namritha Ramakrishnan, Jennifer Jordan Báez, Beth Orlando, Irene Arpayoglou, Melissa Meisenburg

Indian River Lagoon Shorelines

The spatial dataset: UCF_shorelinemodel_IRL_LWL.shp, was created with support from the Indian River Lagoon National Estuaries Program and Florida Sea Grant. These projects cumulatively led to creation of a living shoreline restoration prioritization model and hydrodynamic habitat suitability models for 1,550 km (963 miles) of estuarine shorelines in Indian River Lagoon and Lake Worth Lagoon.

The dataset presented herein includes:

  1. shoreline data from >15,000 transects collected in the field,
  2. shoreline wave climate data created through hydrodynamic modeling and frequency analysis of historic data,
  3. categorization of potential risk for shoreline boat wake impact,
  4. persistence of seagrass within 210 m of the shoreline, …


Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp) Revision 0, Woodard & Curran Nov 2025

Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp) Revision 0, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Epbc 2010/5491: Weaber Plain Development Project Compliance Report - 1st May 2024 To 30th April 2025, Department Of Primary Industries And Regional Development, Western Australia Nov 2025

Epbc 2010/5491: Weaber Plain Development Project Compliance Report - 1st May 2024 To 30th April 2025, Department Of Primary Industries And Regional Development, Western Australia

Irrigated Agricultural Development in the North

The Weaber Plain Development Project (Goomig Project) was approved on 13 September 2011. The approval reference is EPBC 2010/5491 (the Approval).

The Goomig Project comprises irrigated farmland, associated infrastructure, and a buffer area on the Weaber Plain located about 30km north-northeast of Kununurra in Western Australia. Figure 1 shows the location and layout of the Goomig Project and interface with other projects including the Knox Creek Plain Irrigation Development (EPBC 2014/7143), Sorby Hills Silver Lead Zinc mining project, and Ord River Irrigation Area (ORIA) Stage 1 'Cave Springs' farms.

The Department of Primary Industries and Regional Development is the Goomig …


Re: 3rd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Oct 2025

Re: 3rd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc. Oct 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2023, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan (Dated August 29, 2025), Emma Rott Oct 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan (Dated August 29, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan Revision 0 (2025 Update) And Response To Epa Comments. (Dated September 16, 2025), Emma Rott Oct 2025

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan Revision 0 (2025 Update) And Response To Epa Comments. (Dated September 16, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Dramatic Biases In Terrestrial Nitrogen Fixation In Earth System Models Revealed By Natural Isotope Signatures, Maoyuan Fang, Shushi Peng, Philippe Ciais, Daniel S. Goll, Benjamin Z. Houlton, Ying-Ping Wang, Yilong Wang, Pan Liu, Joshua B. Fisher, Pierre Regnier Oct 2025

Dramatic Biases In Terrestrial Nitrogen Fixation In Earth System Models Revealed By Natural Isotope Signatures, Maoyuan Fang, Shushi Peng, Philippe Ciais, Daniel S. Goll, Benjamin Z. Houlton, Ying-Ping Wang, Yilong Wang, Pan Liu, Joshua B. Fisher, Pierre Regnier

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Biological nitrogen fixation (BNF) is the primary input of new reactive nitrogen to natural terrestrial ecosystems. However, this flux is poorly constrained due to its unclear drivers and associated control mechanisms. Here, we extend the existing theory of nitrogen (N) isotope mass balance to estimate BNF rates and then use a Bayesian approach to constrain the BNF rates in natural terrestrial ecosystems by using measurements of natural N-isotope ratios (δ15N) in plants (δP) and soil (δS). Together with pairwise δP and δS measurements from 18 forest sites covering diverse climates and thousands …


Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott Oct 2025

Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott Oct 2025

Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit Final Leak Infiltration Evaluation, Josh Bryson Oct 2025

Re: Butte Priority Soils Operable Unit Final Leak Infiltration Evaluation, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 30 – Atlantic-1 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 30 – Atlantic-1 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-08 (Anderson Shaft) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-08 (Anderson Shaft) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Quantifying Single, Compound And Cascading Climate Extremes: Implications For Agricultural Resilience In California, Shahryar Fazli, Wenzhao Li, Rejoice Thomas, Surendra Maharjan, Mohammad Sina Jahangiri, Andre Daccache, Hesham Morgan, Mohamed Allali, Hesham El-Askary Oct 2025

Quantifying Single, Compound And Cascading Climate Extremes: Implications For Agricultural Resilience In California, Shahryar Fazli, Wenzhao Li, Rejoice Thomas, Surendra Maharjan, Mohammad Sina Jahangiri, Andre Daccache, Hesham Morgan, Mohamed Allali, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

As climate change intensifies, extreme weather increasingly threatens California’s Central Valley (CV), a vital agricultural region exposed to rising risks from heatwaves (HW), droughts (DR), and compound extremes. These events disrupt crop productivity and broader processes like water demand, pest dynamics, and soil stability, posing systemic risks. This study examines the spatiotemporal dynamics of HW, coldwaves (CW), DR, excessive rainfall (ER), and their compound (e.g., HWDR) and cascading forms from 1951 to 2025, using NOAA nClimGrid-Daily data. We assessed trends in frequency, intensity, and duration over long-term (1951–2025) and mid-term (1981–2025) periods. Results show increasing HW and DR in the …


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2024 Surface Water, Groundwater, And Soil Characterization, Woodard & Curran Oct 2025

Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2024 Surface Water, Groundwater, And Soil Characterization, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Draft Final Butte Mine Waste Repository Geotechnical Investigation Work Plan (Dated September 23, 2025), Emma Rott Oct 2025

Re: Comments On The Draft Final Butte Mine Waste Repository Geotechnical Investigation Work Plan (Dated September 23, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No.94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp), Mike Mcanulty Oct 2025

Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No.94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soil Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 91 – Robert Emmett Dump, Mike Mcanulty Oct 2025

Re: Butte Priority Soil Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 91 – Robert Emmett Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Residential Metals Abatement Program (Rmap) Baptist Student Union (Former Mckinley School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc. Oct 2025

Draft Final 2024 Residential Metals Abatement Program (Rmap) Baptist Student Union (Former Mckinley School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson Oct 2025

Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2025 Residential Metals Abatement Program (Rmap) Cccs Gymnasium Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Oct 2025

Final 2025 Residential Metals Abatement Program (Rmap) Cccs Gymnasium Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2025 Residential Metals Abatement Program (Rmap) Butte Koa Playground Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Oct 2025

Final 2025 Residential Metals Abatement Program (Rmap) Butte Koa Playground Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.