Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 481 - 510 of 4686

Full-Text Articles in Environmental Indicators and Impact Assessment

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-22 Site Evaluation Summary Report (Dated December 10, 2025), Molly Roby Jan 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-22 Site Evaluation Summary Report (Dated December 10, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-06 Site Evaluation Summary Report (Dated December 10, 2025), Molly Roby Jan 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-06 Site Evaluation Summary Report (Dated December 10, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


When Words Flow Like Water: How The Enbridge Line 3 Pipeline Environmental Impact Statement Failed To Prevent Hydrogeologic Harm In Minnesota, Carly Gutzmann Jan 2026

When Words Flow Like Water: How The Enbridge Line 3 Pipeline Environmental Impact Statement Failed To Prevent Hydrogeologic Harm In Minnesota, Carly Gutzmann

Journal of Earth and Life Science

For the aquifers of Minnesota, the environmental impact statement (EIS) was a promise of protection that never left the page. An environmental impact statement is meant to be an aid in the decision making process in order to ensure that projects consider potential environmental harms that may occur. However, they are often used instead as another regulatory box to check, rather than as active considerations when planning. As such, a project plan can be flawed from the start—if project developers only consider environmental impacts after they have already put considerable time, effort, and funding into their project as-is, they may …


From Sediment To Mangrove: Tissue-Specific Metal Accumulation In Red Mangroves Of Southeastern Florida, Sophie Welch Jan 2026

From Sediment To Mangrove: Tissue-Specific Metal Accumulation In Red Mangroves Of Southeastern Florida, Sophie Welch

Honors Theses

Coastal wetlands near industrialized waterways face increasingly heavy‐metal contamination, posing risks to benthic communities and food webs. Mangroves can influence metal cycling through sediment trapping, root‐zone sequestration, and internal physiological regulation, yet their effectiveness in urbanized systems remains debated. This study quantified concentrations of 17 heavy metals in sediments and mangrove tissues from four sites near Port Everglades, Florida, examined tissue‐specific partitioning, spatial and temporal contamination patterns, and examined the mangroves’ role in mediating metal loads. Ecological risk metrics identified STB as a contaminant hotspot with exceedances of TEL values across multiple elements (Ni, Pb, and Zn) as well as …


Macroinvertebrate Taxonomic And Functional Diversity In The Spokane River Watershed, Kaitlin L. Abell Jan 2026

Macroinvertebrate Taxonomic And Functional Diversity In The Spokane River Watershed, Kaitlin L. Abell

EWU Masters Thesis Collection

Changes in land use, such as agricultural expansion, have impacted stream systems by modifying discharge, substrate diversity, channel morphology, and nutrient inputs. The Spokane River Watershed is heavily impacted by human activity, including urban and agricultural development. Rehabilitation efforts are being organized to reintroduce Salmonidae species in the Spokane River Watershed. The first step of this reintroduction is to perform habitat studies to inform allocation of restoration efforts. As part of this effort, I performed benthic macroinvertebrate surveys throughout the watershed.

The objective of my research was to use the macroinvertebrate community as a biological indicator to determine which habitat …


Using Remote Sensing Technology To Develop A Framework For Improving Hydrologic Models, Marissa Cook Jan 2026

Using Remote Sensing Technology To Develop A Framework For Improving Hydrologic Models, Marissa Cook

Theses, Dissertations and Capstones

With increased storm intensity due to climate change and urbanization, flash flooding has become an increasingly significant issue globally and regionally. Although the factors influencing urban flash flooding are well-known, there is a growing need for technology to accurately and remotely predict the chance of a flash flood occurring from any given rain event to give people time to prepare. This study aims to use multispectral satellite imagery to provide a framework for improving near real-time flood predictions in an urban area of a high gradient, fourth order stream impacted by flooding. Specifically, we utilize satellite imagery to create the …


Using Low-Cost Sensors For Source Attribution And Health Assessment: An Air Quality Study In Brownsville, Texas, Sai Deepak Pinakana, Kabir Bahadur Shah, Daniel Jaffe, Juan L. Gonzalez, Owen Temby, Gabriel Ibarra-Mejia, Amit U. Raysoni Jan 2026

Using Low-Cost Sensors For Source Attribution And Health Assessment: An Air Quality Study In Brownsville, Texas, Sai Deepak Pinakana, Kabir Bahadur Shah, Daniel Jaffe, Juan L. Gonzalez, Owen Temby, Gabriel Ibarra-Mejia, Amit U. Raysoni

School of Earth, Environmental, & Marine Sciences Faculty Publications

Air quality monitoring remains a challenge in areas lacking or having sparse federal monitoring infrastructure, posing significant barriers to public health research. This study demonstrates the usage of low-cost sensors in addressing gaps in air quality monitoring, source attribution, and health risk assessment in a Brownsville, TX neighborhood impacted by emissions from a barite and celestite mineral processing unit. PM2.5 concentrations were measured using PurpleAir sensors deployed across three residential locations, with the site nearest to the processing unit recording a 24-h averaged PM2.5 concentration of 25.12 μg/m3—approximately 2.79 times higher than the nearest Texas Commission of Environmental Quality (TCEQ) …


Swimming In Uncertainty: Filling Data Gaps And Providing An Educational Platform For Beach Water Quality At Tybee Island, Georgia, Lukas Roberson Jan 2026

Swimming In Uncertainty: Filling Data Gaps And Providing An Educational Platform For Beach Water Quality At Tybee Island, Georgia, Lukas Roberson

College of Graduate Studies: Theses & Dissertations

@font-face {font-family:"Cambria Math"; panose-1:2 4 5 3 5 4 6 3 2 4; mso-font-charset:0; mso-generic-font-family:roman; mso-font-pitch:variable; mso-font-signature:-536870145 1107305727 0 0 415 0;}p.MsoNormal, li.MsoNormal, div.MsoNormal {mso-style-unhide:no; mso-style-qformat:yes; mso-style-parent:""; margin:0in; mso-pagination:widow-orphan; font-size:12.0pt; font-family:"Times New Roman",serif; mso-fareast-font-family:"Times New Roman";}.MsoChpDefault {mso-style-type:export-only; mso-default-props:yes; mso-font-kerning:0pt; mso-ligatures:none;}div.WordSection1 {page:WordSection1;}

Swimming in beaches water contaminated with high levels of bacteria can make you sick. Current monitoring at the public beaches on Tybee Island consists of weekly monitoring and enumeration of fecal indicator bacteria that takes 24 hours for results. If the number of bacteria exceed regulatory limits, a public health advisory is issued, and affected waters are retested until …


2024 Annual Operations And Maintenance Report 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services Jan 2026

2024 Annual Operations And Maintenance Report 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Annual Operations And Maintenance Report - 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services Jan 2026

2024 Annual Operations And Maintenance Report - 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2023, Pioneer Technical Services, Inc. Jan 2026

Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Preliminary Analysis Of The Spatial Distribution Of Microplastics Along The Cuyahoga River, Northeast, Ohio, Ella Pitz Jan 2026

Preliminary Analysis Of The Spatial Distribution Of Microplastics Along The Cuyahoga River, Northeast, Ohio, Ella Pitz

Williams Honors College, Honors Research Projects

Plastics are nearly ubiquitous throughout modern society, and when left in the natural environment, they degrade into microplastics. Microplastics are particles that range in diameter from 5 millimeters down to nanometers, and microplastics pose many potential environmental and health risks due to their small size and ease of ingestion. While the study of microplastics in the environment has become more common over the past ten years, microplastic concentrations remain unexplored in many regions throughout the country. Here I present a method for separating microplastics from organic matter and clastic sediment as well as preliminary measurements of microplastic concentrations in sediment …


A Geospatial Assessment Of Groundwater Salinization In A Multi-Aquifer System: Durango, Mexico, Juan Lopez-Sierra Jan 2026

A Geospatial Assessment Of Groundwater Salinization In A Multi-Aquifer System: Durango, Mexico, Juan Lopez-Sierra

Graduate Theses/Dissertations

Groundwater salinization poses a critical environmental concern for water resource sustainability in arid and semi-arid regions. This study evaluates spatial and temporal patterns of groundwater salinity across the state of Durango, Mexico, using total dissolved solids (TDS), sodium adsorption ratio (SAR), as salinity indicators and nitrate-nitrogen (NO₃–N) as an anthropogenic indicator. Groundwater quality data were obtained from (CONAGUA), a Mexican water agency. To assess salinity variations with respect to time, while minimizing interannual sampling bias, two multi-year sampling periods were selected: 2012-2013, and 2020-2021. Final datasets consisted of 122 wells for 2012–2013 and 131 wells for 2020–2021. The wells were …


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 30 – Atlantic-1 Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 30 – Atlantic-1 Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Revised Unreclaimed Sites Ur-08 (Anderson Shaft) – Remedial Action Work Plan (Rawp) (Dated October 24, 2025), Molly Roby Dec 2025

Re: Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Revised Unreclaimed Sites Ur-08 (Anderson Shaft) – Remedial Action Work Plan (Rawp) (Dated October 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Experiences Of Bukidnon Farmers On The Use Of Carbonized Rice Hulls (Crh) Waste From Biomass Boilers As A Soil Conditioner, Dash Constantine S. Chamen, Queen Loraine D. Ban, Michael Justin O. Eluna, Pole Honson B. Gabitano, Ian Jay P. Saldo, Jhovel Roy D. Calo Dec 2025

Experiences Of Bukidnon Farmers On The Use Of Carbonized Rice Hulls (Crh) Waste From Biomass Boilers As A Soil Conditioner, Dash Constantine S. Chamen, Queen Loraine D. Ban, Michael Justin O. Eluna, Pole Honson B. Gabitano, Ian Jay P. Saldo, Jhovel Roy D. Calo

Sinaya: A Philippine Journal for Senior High School Teachers and Students

The long-term use of agricultural products that adversely affect soil is a significant issue for farmers. This study explored the potential of carbonized rice hulls (CRH) waste from biomass boilers as a sustainable soil conditioner. The research investigated the specific soil conditioning properties of CRH and explored the lived experiences of nine (9) Bukidnon farmers to correlate their observations with the material’s chemical profile. The composition analysis identified a high silica content and essential micronutrients, such as calcium and magnesium, which act as nutrient restorers and pH regulators. The thematic analysis of semi-structured interviews, four themes emerged to summarize the …


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report (Dated September 30, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report (Dated September 30, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report (Dated October 16, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report (Dated October 16, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report (Dated October 22, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report (Dated October 22, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Third Quarter 2025, Pioneer Technical Services, Inc. Dec 2025

Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Third Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 18, 2025), Emma Rott Dec 2025

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 18, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp) (Dated November 24, 2025), Emma Rott Dec 2025

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp) (Dated November 24, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System - 2023 (Dated October 29, 2025), Emma Rott Dec 2025

Re: Approval Letter For The Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System - 2023 (Dated October 29, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Revised Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Annual Operations, Maintenance, And Monitoring (Om&M) Plan – 2023 (Dated October 29, 2025), Emma Rott Dec 2025

Re: Approval Letter For The Revised Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Annual Operations, Maintenance, And Monitoring (Om&M) Plan – 2023 (Dated October 29, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


A Predictive Model For Multi- Week Respiratory Risk From Red Tide On Florida’S Gulf Coast., Elmer S. Ochaeta Dec 2025

A Predictive Model For Multi- Week Respiratory Risk From Red Tide On Florida’S Gulf Coast., Elmer S. Ochaeta

Computer Science and Engineering Faculty Publications

Florida’s Gulf Coast red tide (Karenia brevis) can put toxins into the air, making people cough, irritating the throat, and worsening asthma or other breathing problems especially when winds blow from the ocean toward the beach. Right now, most public updates don’t really help with the question people actually ask when planning a weekend or vacation: “Will going to or close to the beach be risky in the next few weeks?”.

In this project, I build a weekly early warning system that estimates respiratory risk for specific beaches and predicts that risk 2 to 4 weeks ahead. The study covers …


Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc. Dec 2025

Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc. Dec 2025

Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc. Dec 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.