Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 481 - 510 of 4608

Full-Text Articles in Environmental Indicators and Impact Assessment

Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott Oct 2025

Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit Final Leak Infiltration Evaluation, Josh Bryson Oct 2025

Re: Butte Priority Soils Operable Unit Final Leak Infiltration Evaluation, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 30 – Atlantic-1 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 30 – Atlantic-1 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-08 (Anderson Shaft) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-08 (Anderson Shaft) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Quantifying Single, Compound And Cascading Climate Extremes: Implications For Agricultural Resilience In California, Shahryar Fazli, Wenzhao Li, Rejoice Thomas, Surendra Maharjan, Mohammad Sina Jahangiri, Andre Daccache, Hesham Morgan, Mohamed Allali, Hesham El-Askary Oct 2025

Quantifying Single, Compound And Cascading Climate Extremes: Implications For Agricultural Resilience In California, Shahryar Fazli, Wenzhao Li, Rejoice Thomas, Surendra Maharjan, Mohammad Sina Jahangiri, Andre Daccache, Hesham Morgan, Mohamed Allali, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

As climate change intensifies, extreme weather increasingly threatens California’s Central Valley (CV), a vital agricultural region exposed to rising risks from heatwaves (HW), droughts (DR), and compound extremes. These events disrupt crop productivity and broader processes like water demand, pest dynamics, and soil stability, posing systemic risks. This study examines the spatiotemporal dynamics of HW, coldwaves (CW), DR, excessive rainfall (ER), and their compound (e.g., HWDR) and cascading forms from 1951 to 2025, using NOAA nClimGrid-Daily data. We assessed trends in frequency, intensity, and duration over long-term (1951–2025) and mid-term (1981–2025) periods. Results show increasing HW and DR in the …


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2024 Surface Water, Groundwater, And Soil Characterization, Woodard & Curran Oct 2025

Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2024 Surface Water, Groundwater, And Soil Characterization, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soil Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 91 – Robert Emmett Dump, Mike Mcanulty Oct 2025

Re: Butte Priority Soil Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 91 – Robert Emmett Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No.94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp), Mike Mcanulty Oct 2025

Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No.94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Draft Final Butte Mine Waste Repository Geotechnical Investigation Work Plan (Dated September 23, 2025), Emma Rott Oct 2025

Re: Comments On The Draft Final Butte Mine Waste Repository Geotechnical Investigation Work Plan (Dated September 23, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Residential Metals Abatement Program (Rmap) Baptist Student Union (Former Mckinley School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc. Oct 2025

Draft Final 2024 Residential Metals Abatement Program (Rmap) Baptist Student Union (Former Mckinley School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson Oct 2025

Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2025 Residential Metals Abatement Program (Rmap) Butte Koa Playground Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Oct 2025

Final 2025 Residential Metals Abatement Program (Rmap) Butte Koa Playground Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2025 Residential Metals Abatement Program (Rmap) Cccs Gymnasium Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Oct 2025

Final 2025 Residential Metals Abatement Program (Rmap) Cccs Gymnasium Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soil Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 177 – North Alice Culvert, Mike Mcanulty Oct 2025

Re: Butte Priority Soil Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 177 – North Alice Culvert, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Ur- 19 – Butte, Anaconda & Pacific Railway From Montana Street To South Arizona Avenue – Montana Street Adjacent Parcel (Dated August 13, 2025), Molly Roby Oct 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Ur- 19 – Butte, Anaconda & Pacific Railway From Montana Street To South Arizona Avenue – Montana Street Adjacent Parcel (Dated August 13, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No. 35 Del Monte Reclamation Improvement Field Sampling Plan, Mike Mcanulty Oct 2025

Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No. 35 Del Monte Reclamation Improvement Field Sampling Plan, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield, Mike Mcanulty Oct 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For Bpsou Blacktail Creek Riparian Actions Revised Draft Final Uniform Federal Policy Quality Assurance Project Plan (Dated September 30, 2025), Emma Rott Oct 2025

Re: Approval Letter For Bpsou Blacktail Creek Riparian Actions Revised Draft Final Uniform Federal Policy Quality Assurance Project Plan (Dated September 30, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2025 Residential Metals Abatement Program (Rmap) Butte Koa Playground Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Oct 2025

Draft Final 2025 Residential Metals Abatement Program (Rmap) Butte Koa Playground Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Carbon Footprint Of Carrots In Western Australia, Christophe D'Abbadie, Saloomeh Akbari, Sang Ravindran Oct 2025

Carbon Footprint Of Carrots In Western Australia, Christophe D'Abbadie, Saloomeh Akbari, Sang Ravindran

Horticulture research reports

This report presents the findings of a comprehensive carbon accounting study conducted on carrot production in the Myalup area of Western Australia.

The study reveals that carrot emissions are approximately 81 kg CO2e per tonne of carrot sold from the April harvest and 76 kg CO2e per tonne from the October harvest, when using rejected carrots for other economic uses. These figures represent competitive emissions intensities compared to international benchmarks.

Key findings include:

  • Yield improvement is the primary driver for emissions reduction: Increasing productivity, without proportional input increases, offers the most effective pathway to lower emissions’ intensity while improving economic …


Evolution Of Agricultural Emissions Calculations In Australia: Methodological And Calculator Refinements And Their Impact On Western Australia’S Agricultural Carbon Footprint, Christophe D'Abbadie Oct 2025

Evolution Of Agricultural Emissions Calculations In Australia: Methodological And Calculator Refinements And Their Impact On Western Australia’S Agricultural Carbon Footprint, Christophe D'Abbadie

Climate Science Published Reports

Greenhouse gas (GHG) emissions accounting is fundamental to positioning Australian agricultural products competitively in global markets, enabling supply chain stakeholders to make informed decisions, and understanding the trade-offs between market demands, policy requirements, consumer expectations, and intergenerational responsibilities.

Recent methodological refinements to emissions methodologies have enhanced the accuracy of GHG accounting in Western Australian (WA) agriculture. The Department of Primary Industries and Regional Development (DPIRD) has collaborated in these improvements through collaborative research with universities and federal agencies and advocacy for Western Australia-specific emission factors.

Methodological refinements have improved the accuracy of WA agricultural emissions estimates by 6% overall, providing …


Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Remedial Action Work Plan (Rawp): Bres No. 104 (Colorado Dump) North Slope, Pioneer Technical Services, Inc. Oct 2025

Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Remedial Action Work Plan (Rawp): Bres No. 104 (Colorado Dump) North Slope, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


A Feature Engineering Technique For Enhancing The Generalization Of Machine Learning Models In Estimating Crop Evapotranspiration, Gaku Yokoyama, Sohta Harigai, Shigehiro Kubota, Koichi Nomura, Gregory R. Goldsmith, Daisuke Yasutake, Tomoyoshi Hirota, Masaharu Kitano Sep 2025

A Feature Engineering Technique For Enhancing The Generalization Of Machine Learning Models In Estimating Crop Evapotranspiration, Gaku Yokoyama, Sohta Harigai, Shigehiro Kubota, Koichi Nomura, Gregory R. Goldsmith, Daisuke Yasutake, Tomoyoshi Hirota, Masaharu Kitano

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Accurate and precise estimation of evapotranspiration (ET) is crucial for understanding the terrestrial carbon, water, and energy cycles. While process-based models of ET, such as the Penman–Monteith model offer robust generalization capabilities, they are limited by the need for detailed parameters (e.g., stomatal conductance,) that are challenging to measure continuously. On the other hand, machine learning models can estimate ET by capturing relationships between ET and environmental variables without experimentally measuring model parameters. However, machine learning models face the challenge of limited generalizability. This issue is particularly significant given the uncertainty introduced by changing climatic …


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield Response To Agency Comments (Dated August 14, 2025), Molly Roby Sep 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield Response To Agency Comments (Dated August 14, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No.94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp) (Dated August 21, 2025), Molly Roby Sep 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No.94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp) (Dated August 21, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.