Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 361 - 390 of 4686

Full-Text Articles in Environmental Indicators and Impact Assessment

Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp) (Dated March 24, 2026), Molly Roby Apr 2026

Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp) (Dated March 24, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Dated April 17, 2026), Emma Rott Apr 2026

Re: Comment Letter For Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Dated April 17, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment, Mike Mcanulty Apr 2026

Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Apr 2026

Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Apr 2026

Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Whitehall Borrow Submittal #3 (Dated March 27, 2026), Molly Roby Apr 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Whitehall Borrow Submittal #3 (Dated March 27, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Uniform Federal Policyquality Assurance Project Plan Addendum, Hydrogeologic, Inc. Apr 2026

Draft Uniform Federal Policyquality Assurance Project Plan Addendum, Hydrogeologic, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operably Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System (Btl) Second Quarter 2025 (Dated April 10, 2026), Emma Rott Apr 2026

Re: Approval Letter For The Butte Priority Soils Operably Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System (Btl) Second Quarter 2025 (Dated April 10, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The 2022 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott Apr 2026

Re: Approval Letter For The 2022 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The 2023 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott Apr 2026

Re: Approval Letter For The 2023 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For Diggings East 95 % Remedial Design Package Submittal (Dated March 25, 2006), The Silver Bow Creek Conservation Area (Sbcca) – 95 Percent Programmatic Technical Specifications Submittal (Dated March 25, 2026), The Butte Priority Soils Operable Unit (Bpsou) Sbcca Operations And Maintenance (O&M) Plan (Dated March 24, 2026), And The Sbcca Final Principles For A Greener Cleanup Report (Dated February 4, 2026), Emma Rott Apr 2026

Re: Conditional Approval Letter For Diggings East 95 % Remedial Design Package Submittal (Dated March 25, 2006), The Silver Bow Creek Conservation Area (Sbcca) – 95 Percent Programmatic Technical Specifications Submittal (Dated March 25, 2026), The Butte Priority Soils Operable Unit (Bpsou) Sbcca Operations And Maintenance (O&M) Plan (Dated March 24, 2026), And The Sbcca Final Principles For A Greener Cleanup Report (Dated February 4, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The 2024 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott Apr 2026

Re: Approval Letter For The 2024 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc. Apr 2026

Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc. Apr 2026

Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc. Apr 2026

Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc. Apr 2026

Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 96 – Washoe Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc. Apr 2026

Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 96 – Washoe Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, 60% Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System (Dated March 2, 2026), Emma Rott Apr 2026

Re: Comment Letter For The Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, 60% Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System (Dated March 2, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Brown Pelican (Pelecanus Occidentalis) Groundings On A Four-Lane Divided Highway In South Texas: A Comparative Study Using Citizen Science, Bradley Evan Beer, Kevin W. Ryer, Md. Saydur Rahman, John H. Young Jr., Richard J. Kline Apr 2026

Brown Pelican (Pelecanus Occidentalis) Groundings On A Four-Lane Divided Highway In South Texas: A Comparative Study Using Citizen Science, Bradley Evan Beer, Kevin W. Ryer, Md. Saydur Rahman, John H. Young Jr., Richard J. Kline

School of Integrative Biological & Chemical Sciences Faculty Publications

The population of the once-endangered brown pelican (Pelecanus occidentalis) has increased over the past several decades and is now considered fully recovered. However, in south Texas, the combined effects of weather patterns, transportation infrastructure, and brown pelican biology have led to road mortalities on State Highway 48 (SH 48) at the Carl “Joe” Gayman Bridge. To mitigate these mortalities, the Texas Department of Transportation modified traffic barriers on SH 48. We aimed to examine the effect of the barrier change and determine which weather variables influence brown pelican groundings on SH 48. Citizen scientists monitored sections of SH …


Butte Priority Soils Operable Unit (Bpsou) 2026 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson Apr 2026

Butte Priority Soils Operable Unit (Bpsou) 2026 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services Apr 2026

2023 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services Apr 2026

2023 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services Apr 2026

2024 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services Apr 2026

2024 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services Apr 2026

2023 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services Apr 2026

2024 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services Apr 2026

2022 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services Apr 2026

2022 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Monitoring Koyna Dam Displacements Using Persistent Scatterer Interferometry, Sara Zouriq, Gehan Hamdy, Amr Fawzy, Rejoice Thomas, Hesham El-Askary, Eehab Khalil, Mohamed Elsayad, Tarik El-Salawaky Apr 2026

Monitoring Koyna Dam Displacements Using Persistent Scatterer Interferometry, Sara Zouriq, Gehan Hamdy, Amr Fawzy, Rejoice Thomas, Hesham El-Askary, Eehab Khalil, Mohamed Elsayad, Tarik El-Salawaky

Mathematics, Physics, and Computer Science Faculty Articles and Research

Monitoring dam stability is critical to ensure structural safety and operational reliability. This study integrates Persistent Scatterer Interferometry (PSI) based on Sentinel-1 SAR imagery (2020–2023) with Finite Element Method (FEM) simulations to assess the behavior of the Koyna Dam in India. PSI detected crest displacements between −1.0 and −1.8 mm yr−1, while FEM simulations predicted a maximum vertical displacement of approximately −3.2 mm at the crest. Although these results represent different quantities (time-averaged displacement rates versus peak static displacement), both approaches indicate millimeter-scale deformation and a consistent pattern of settlement at the dam crest, supporting the interpretation of hydrologically driven …


Re: Comment Letter For Butte Priority Soils Operable Unit Draft Leak Detection Monitoring Plan (Dated February 2026), Emma Rott Apr 2026

Re: Comment Letter For Butte Priority Soils Operable Unit Draft Leak Detection Monitoring Plan (Dated February 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.