Open Access. Powered by Scholars. Published by Universities.®
Environmental Indicators and Impact Assessment Commons™
Open Access. Powered by Scholars. Published by Universities.®
- Institution
-
- Montana Tech Library (1829)
- University of Nebraska - Lincoln (763)
- University of Kentucky (589)
- Department of Primary Industries and Regional Development, Western Australia (305)
- Chapman University (198)
-
- University of Nevada, Las Vegas (160)
- Portland State University (51)
- Old Dominion University (44)
- University of Louisville (43)
- University of Arkansas, Fayetteville (29)
- Eastern Kentucky University (28)
- Seattle University School of Law (26)
- California Polytechnic State University, San Luis Obispo (24)
- City University of New York (CUNY) (23)
- University of Southern Maine (19)
- SIT Graduate Institute/SIT Study Abroad (18)
- Western Kentucky University (14)
- Molloy University (13)
- University of Dayton (13)
- Central Washington University (12)
- Nova Southeastern University (12)
- Stony Brook University (12)
- Wilfrid Laurier University (12)
- Center for the Blue Economy (11)
- Colby College (11)
- Bemidji State University (10)
- Stephen F. Austin State University (10)
- The University of San Francisco (10)
- University of Connecticut (10)
- Claremont Colleges (9)
- Keyword
-
- Priority Soils (398)
- Gas (251)
- And Energy; Structural Materials; Sustainability (248)
- Energy Systems; Environmental Indicators and Impact Assessment; Environmental Monitoring; Mining Engineering; Oil (248)
- Metals Abatement (228)
-
- Western Australia (189)
- Unreclaimed Sites (147)
- Field Sampling (143)
- Groundwater (142)
- Consent Decree (126)
- Quality Assurance (126)
- Water quality (108)
- Drought (103)
- Insufficiently Reclaimed Sites (101)
- Indoor Dust (74)
- United States (74)
- Berkeley Pit (67)
- Salinity (64)
- Soil Sampling (62)
- Butte Treatment Lagoon (57)
- Climate change (56)
- Lead (55)
- Stormwater (55)
- Groundwater Monitoring (54)
- Smelter Area (53)
- Sustainability (53)
- Lake Mead (Ariz. and Nev.) (51)
- Blacktail Creek (49)
- Environment (49)
- Monitoring (49)
- Publication Year
- Publication
-
- Silver Bow Creek/Butte Area Superfund Site (1829)
- World of Coal Ash Proceedings (580)
- United States Agricultural Commodities in Drought Archive (219)
- Nebraska Cooperative Fish and Wildlife Research Unit: Staff Publications (166)
- National Drought Mitigation Center: Faculty Publications (135)
-
- Mathematics, Physics, and Computer Science Faculty Articles and Research (98)
- Publications (WR) (85)
- Biology, Chemistry, and Environmental Sciences Faculty Articles and Research (74)
- DroughtScape: Quarterly Newsletter of the National Drought Mitigation Center (2007–2023) (68)
- High Plains Regional Climate Center: Staff Publications (64)
- Resource management technical reports (64)
- Natural resources published reports (59)
- Sustain Magazine (41)
- Irrigated Agricultural Development in the North (39)
- EKU Faculty and Staff Scholarship (28)
- Environmental Science and Management Faculty Publications and Presentations (25)
- SITIE Symposiums (25)
- Status and Trends for Virginia Chesapeake Bay (23)
- Wildlife Monitoring (23)
- Fisheries Research Reports (21)
- Prairie Post: Quarterly Newsletter of the High Plains Regional Climate Center (21)
- Biosecurity factsheets (20)
- Graduate Theses and Dissertations (17)
- Nebraska Department of Environmental Quality: Reports (16)
- Independent Study Project (ISP) Collection (15)
- Elizabeth River Reports (14)
- Electronic Theses and Dissertations (13)
- Environmental Science and Management Professional Master's Project Reports (13)
- Master of Science in Environmental Sciences and Management Projects (13)
- The Coastal Monitor (13)
- Publication Type
Articles 301 - 330 of 4608
Full-Text Articles in Environmental Indicators and Impact Assessment
Re: Approval Letter For The 2024 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc.
Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc.
Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, 60% Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System (Dated March 2, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 96 – Washoe Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 96 – Washoe Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Brown Pelican (Pelecanus Occidentalis) Groundings On A Four-Lane Divided Highway In South Texas: A Comparative Study Using Citizen Science, Bradley Evan Beer, Kevin W. Ryer, Md. Saydur Rahman, John H. Young Jr., Richard J. Kline
Brown Pelican (Pelecanus Occidentalis) Groundings On A Four-Lane Divided Highway In South Texas: A Comparative Study Using Citizen Science, Bradley Evan Beer, Kevin W. Ryer, Md. Saydur Rahman, John H. Young Jr., Richard J. Kline
School of Integrative Biological & Chemical Sciences Faculty Publications
The population of the once-endangered brown pelican (Pelecanus occidentalis) has increased over the past several decades and is now considered fully recovered. However, in south Texas, the combined effects of weather patterns, transportation infrastructure, and brown pelican biology have led to road mortalities on State Highway 48 (SH 48) at the Carl “Joe” Gayman Bridge. To mitigate these mortalities, the Texas Department of Transportation modified traffic barriers on SH 48. We aimed to examine the effect of the barrier change and determine which weather variables influence brown pelican groundings on SH 48. Citizen scientists monitored sections of SH …
Butte Priority Soils Operable Unit (Bpsou) 2026 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2024 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services
2024 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2022 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services
2022 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2023 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services
2023 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2024 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services
2024 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2023 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services
2023 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2023 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services
2023 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2022 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services
2022 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2024 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services
2024 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Monitoring Koyna Dam Displacements Using Persistent Scatterer Interferometry, Sara Zouriq, Gehan Hamdy, Amr Fawzy, Rejoice Thomas, Hesham El-Askary, Eehab Khalil, Mohamed Elsayad, Tarik El-Salawaky
Monitoring Koyna Dam Displacements Using Persistent Scatterer Interferometry, Sara Zouriq, Gehan Hamdy, Amr Fawzy, Rejoice Thomas, Hesham El-Askary, Eehab Khalil, Mohamed Elsayad, Tarik El-Salawaky
Mathematics, Physics, and Computer Science Faculty Articles and Research
Monitoring dam stability is critical to ensure structural safety and operational reliability. This study integrates Persistent Scatterer Interferometry (PSI) based on Sentinel-1 SAR imagery (2020–2023) with Finite Element Method (FEM) simulations to assess the behavior of the Koyna Dam in India. PSI detected crest displacements between −1.0 and −1.8 mm yr−1, while FEM simulations predicted a maximum vertical displacement of approximately −3.2 mm at the crest. Although these results represent different quantities (time-averaged displacement rates versus peak static displacement), both approaches indicate millimeter-scale deformation and a consistent pattern of settlement at the dam crest, supporting the interpretation of hydrologically driven …
Re: Comment Letter For Butte Priority Soils Operable Unit Draft Leak Detection Monitoring Plan (Dated February 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For Revised Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Data Summary Report 2024 And Response To Epa Comment Letter (Dated February 24, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc.
Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Second Quarter 2025, Pioneer Technical Services, Inc.
Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Second Quarter 2025, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Silver Bow Creek Conservation Area Materials Management Plan Revision 1, Pioneer Technical Services, Inc.
Draft Final Silver Bow Creek Conservation Area Materials Management Plan Revision 1, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2025 Bpsou Subdrain Data Summary Report (Dsr), Pioneer Technical Services, Inc.
Draft Final 2025 Bpsou Subdrain Data Summary Report (Dsr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Sister Dump (Bres No. 38) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Sister Dump (Bres No. 38) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft 2025 Butte Priority Soils Operable Unit Residential Metals Abatement Program Construction Completion Report, Abby Peltomaa
Draft 2025 Butte Priority Soils Operable Unit Residential Metals Abatement Program Construction Completion Report, Abby Peltomaa
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Third Quarter 2025, Pioneer Technical Services, Inc.
Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Third Quarter 2025, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2025, Pioneer Technical Services, Inc.
Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2025, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Changes In Land, Ocean, Atmospheric Parameters Associated With The 2025 Myanmar (Mw 7.7) Earthquake, Feng Jing, Akshansa Chauhan, Ashwani Raju, Ramesh P. Singh
Changes In Land, Ocean, Atmospheric Parameters Associated With The 2025 Myanmar (Mw 7.7) Earthquake, Feng Jing, Akshansa Chauhan, Ashwani Raju, Ramesh P. Singh
Mathematics, Physics, and Computer Science Faculty Articles and Research
Multiple parameters associated with the land, atmosphere, and ocean were analyzed to study short-term and immediate pre-earthquake changes associated with the 28 March 2025 Myanmar earthquake (Mw 7.7). Anomalous clear-sky outgoing longwave radiation (ClrOLR) and trace gases (CH₄, CO, and O₃) were detected within two months prior to the mainshock. Vertical changes at different pressure levels suggest a possible underground source. High-temporal-resolution observations of the infrared brightness temperature and surface air pressure revealed short-lived fluctuations shortly before the earthquake, which may reflect localized stress adjustments and surface latent heat flux release during the final stage of earthquake preparation. In the …
Butte Priority Soils Operable Unit Diggings East Final 95% Remedial Design Package Submittal, Josh Bryson
Butte Priority Soils Operable Unit Diggings East Final 95% Remedial Design Package Submittal, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.