Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 2431 - 2460 of 4620

Full-Text Articles in Environmental Indicators and Impact Assessment

Sbc/Butte Area Npl Site Final Bpsou Interim Site-Wide Surface Water Monitoring Qapp 2020 And 2021 Monitoring Period, 10/14/20, Nikia Greene Dec 2021

Sbc/Butte Area Npl Site Final Bpsou Interim Site-Wide Surface Water Monitoring Qapp 2020 And 2021 Monitoring Period, 10/14/20, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company Dec 2021

Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Agency Comments Received December 15 On Silver Bow Creek Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Dec 2021

Response To Agency Comments Received December 15 On Silver Bow Creek Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Progressive Destabilization And Triggering Mechanism Analysis Using Multiple Data For Chamoli Rockslide Of 7 February 2021, Wenfei Mao, Lixin Wu, Ramesh P. Singh, Yuan Qi, Busheng Xie, Yingjia Liu, Yifan Ding, Zilong Zhou, Jia Li Dec 2021

Progressive Destabilization And Triggering Mechanism Analysis Using Multiple Data For Chamoli Rockslide Of 7 February 2021, Wenfei Mao, Lixin Wu, Ramesh P. Singh, Yuan Qi, Busheng Xie, Yingjia Liu, Yifan Ding, Zilong Zhou, Jia Li

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

A catastrophic rockslide occurred on 7 February 2021 in Chamoli area in the high Himalaya. In the absence of field data, multiple satellites data of decade span have been used to investigate and understand the progressive destabilization of rockslide body. A 3D geometric model was developed using geospatial information about geology, terrain, and ice cover to understand the triggering mechanism. Several causes are uncovered as: the pronounced long-term change of land surface temperature facilitated local permafrost degradation and led to ice cover shrinking since 2010; the occurrence of ice avalanche nearby in 2016 accompanying with sidewall-to-bedrock fracturing enhanced the ice …


Ecological Risk Assessment For The State-Wide Small Pelagic Scalefish Resource, S. Blazeski, J. Norriss, K. A. Smith, M. Hourston Dec 2021

Ecological Risk Assessment For The State-Wide Small Pelagic Scalefish Resource, S. Blazeski, J. Norriss, K. A. Smith, M. Hourston

Fisheries Research Reports

In July 2021, the Department of Primary Industries and Regional Development convened an ecological risk assessment (ERA) of the fisheries that access the State-wide Small Pelagic Scalefish Resource. The ERA considered the potential ecological impacts of the West Coast Purse Seine Fishery, South Coast Purse Seine Fishery, Purse Seine Development Zones and the recreational fishers who catch small pelagic scalefish. The assessment evaluated the impact of each fishing sector/method on all relevant retained and bycatch species, endangered, threatened and protected species, habitats and the broader environment.


Residential Metals Abatement Program Quality Assurance Project Plan (Non-Residential Parcels - Indoor Dust), Environmental Resource Management (Erm), Elsie King, Christopher Berg, Thomas J. Beckman Dec 2021

Residential Metals Abatement Program Quality Assurance Project Plan (Non-Residential Parcels - Indoor Dust), Environmental Resource Management (Erm), Elsie King, Christopher Berg, Thomas J. Beckman

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Residential Metals Abatement Program Quality Assurance Project Plan (Non-Residential Parcels - Indoor Dust), Elsie King, Christopher Berg, Thomas J. Beckman Dec 2021

Draft Residential Metals Abatement Program Quality Assurance Project Plan (Non-Residential Parcels - Indoor Dust), Elsie King, Christopher Berg, Thomas J. Beckman

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Epa Region 8 Qa Document Review Crosswalk, Nikia Greene Dec 2021

Epa Region 8 Qa Document Review Crosswalk, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Request For Change (Rfc) To The Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Rfc-Brw-2021-03), Josh Bryson Dec 2021

Request For Change (Rfc) To The Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Rfc-Brw-2021-03), Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites – Field Sampling And Investigation Plan (Fsp) Bres No. 154 – Clark Mill Tailings Ne, Mike Mcanulty Dec 2021

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites – Field Sampling And Investigation Plan (Fsp) Bres No. 154 – Clark Mill Tailings Ne, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


The Effects Of Hydrologic Heterogeneity On Harmful Algal Blooms In Freshwater Reservoir, Lake Sinclair, Georgia, Margaret Blackledge Dec 2021

The Effects Of Hydrologic Heterogeneity On Harmful Algal Blooms In Freshwater Reservoir, Lake Sinclair, Georgia, Margaret Blackledge

Biology Theses

Aquatic habitats are frequently studied after a major water quality problem like the occurrence of an algal bloom. In this study, A proactive rather than a reactive response was considered, where the complexity of conditions conducive to uncontrolled cell growth were studied before a bloom took place by sampling regularly. This study aimed to monitor water quality by monthly sampling of algal communities for approximately one year. As the base of the aquatic food web, algae are a highly diverse group of organisms with varying sensitivity to physical and chemical changes in the environment. Four shallow sites were monitored at …


Residential Metals Abatement Program Quality Assurance Project Plan (Non-Residential Parcels – Indoor Dust), Mike Mcanulty Dec 2021

Residential Metals Abatement Program Quality Assurance Project Plan (Non-Residential Parcels – Indoor Dust), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2021, Dave Griffis Dec 2021

Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2021, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Epa Region 8 Qa Document Review Crosswalk, Trec Inc., A Woodard And Curran Company, Nikia Greene Dec 2021

Epa Region 8 Qa Document Review Crosswalk, Trec Inc., A Woodard And Curran Company, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc. Dec 2021

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Modeling Nitrous Oxide Emissions From Large-Scale Intensive Cropping Systems In The Southern Amazon, Ciniro Costa Jr., Gillian L. Galford, Michael T. Coe, Marcia Macedo, Kathijo Jankowski, Christine S. O'Connell, Christopher Neill Dec 2021

Modeling Nitrous Oxide Emissions From Large-Scale Intensive Cropping Systems In The Southern Amazon, Ciniro Costa Jr., Gillian L. Galford, Michael T. Coe, Marcia Macedo, Kathijo Jankowski, Christine S. O'Connell, Christopher Neill

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Nitrogen (N) fertilizer use is rapidly intensifying on tropical croplands and has the potential to increase emissions of the greenhouse gas, nitrous oxide (N2O). Since about 2005 Mato Grosso (MT), Brazil has shifted from single-cropped soybeans to double-cropping soybeans with maize, and now produces 1.5% of the world's maize. This production shift required an increase in N fertilization, but the effects on N2O emissions are poorly known. We calibrated the process-oriented biogeochemical DeNitrification-DeComposition (DNDC) model to simulate N2O emissions and crop production from soybean and soybean-maize cropping systems in MT. After model validation with …


Final Butte Priority Soils Operable Unit Community Engagement Plan For Remedial Work, Josh Bryson, Eric Hassler Dec 2021

Final Butte Priority Soils Operable Unit Community Engagement Plan For Remedial Work, Josh Bryson, Eric Hassler

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approved Final Butte Priority Soils Operable Unit Community Engagement Plan For Remedial Work, Josh Bryson, Eric Hassler Dec 2021

Approved Final Butte Priority Soils Operable Unit Community Engagement Plan For Remedial Work, Josh Bryson, Eric Hassler

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Work Order No. 10591325, Environmental Protection Agency, Atlantic Richfield Company, Pioneer Technical Services, Inc. Dec 2021

Work Order No. 10591325, Environmental Protection Agency, Atlantic Richfield Company, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Mitigation Of Impacts To Historic Features At The Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site, Mitzi Rossillon Dec 2021

Mitigation Of Impacts To Historic Features At The Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site, Mitzi Rossillon

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte-Silver Bow Medical Monitoring Program Plan, Mike Mcanulty, Eric Hassler Dec 2021

Butte-Silver Bow Medical Monitoring Program Plan, Mike Mcanulty, Eric Hassler

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Biodiversity Scale-Dependence And Opposing Multi-Level Correlations Underlie Differences Among Taxonomic, Phylogenetic And Functional Diversity, Nadejda A. Mirochnitchenko, Erica F. Stuber, Joseph J. Fontaine Dec 2021

Biodiversity Scale-Dependence And Opposing Multi-Level Correlations Underlie Differences Among Taxonomic, Phylogenetic And Functional Diversity, Nadejda A. Mirochnitchenko, Erica F. Stuber, Joseph J. Fontaine

Nebraska Cooperative Fish and Wildlife Research Unit: Staff Publications

Aim: Biodiversity is a multidimensional property of biological communities that represents different information depending on how it is measured, but how dimensions relate to one another and under what conditions is not well understood. We explore how taxonomic, phylogenetic, and functional diversity can differ in scale-of-effect dependence and habitat-biodiversity relationships, and subsequently how spatial differences among biodiversity dimensions may arise. Location: Nebraska, United States. Taxon: Birds. Methods: Across 2016 and 2017, we conducted 2,641 point counts at 781 sites. We modeled the occupancy of 141 species using Bayesian Bernoulli-Bernoulli hierarchical logistic regressions. We calculated species richness (SR), phylogenetic diversity (PD), …


Longleaf Pine Restoration In The South Carolina Sandhills Wiregrass Gap, Jacob W. Murray Dec 2021

Longleaf Pine Restoration In The South Carolina Sandhills Wiregrass Gap, Jacob W. Murray

All Theses

Longleaf pine restoration has been a topic of great concern and intrigue in the southeast and has taken on new fervor in recent decades as restoration methods continue to develop. Many landowners and forest managers are now pursuing ecological forestry and restoration ecology in great numbers as a new form of land management. However, niche regions can often be overlooked, as is the case with the Carolina Sandhills Wiregrass Gap, an area devoid of wiregrass and one that is on the outskirt regions of the historical longleaf pine range. Field studies were conducted pre- and post-harvest during two growing seasons …


Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 154 – Clark Mill Tailings Ne., Mike Mcanulty Dec 2021

Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 154 – Clark Mill Tailings Ne., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Silver Bow Snow Management Plan, Mike Mcanulty, Eric Hassler Dec 2021

Butte Silver Bow Snow Management Plan, Mike Mcanulty, Eric Hassler

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 104 - Colorado Dump – Final, Revision 1, Mike Mcanulty Dec 2021

Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 104 - Colorado Dump – Final, Revision 1, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) 2021- Unreclaimed Areas Quality Assurance Project Plan (Qapp), Request For Change (Rfc)-01, Mike Mcanulty Nov 2021

Butte Priority Soils Operable Unit (Bpsou) 2021- Unreclaimed Areas Quality Assurance Project Plan (Qapp), Request For Change (Rfc)-01, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Qapp. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Nov 2021

Silver Bow Creek Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Qapp. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Atlantic Richfield Response To Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou), 2022 Draft Interim Site-Wide Groundwater Monitoring, Quality Assurance Project Plan (Qapp) (Dated November 23, 2021), Atlantic Richfield Company Nov 2021

Atlantic Richfield Response To Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou), 2022 Draft Interim Site-Wide Groundwater Monitoring, Quality Assurance Project Plan (Qapp) (Dated November 23, 2021), Atlantic Richfield Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company Nov 2021

Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.