Full-Text Articles in Environmental Indicators and Impact Assessment

Draft Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase Ii Data Summary Report (Dsr), Pioneer Technical Services, Inc. Jun 2026

Draft Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase Ii Data Summary Report (Dsr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Unreclaimed Sites Sampling: Ur-31 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jun 2026

Draft Final 2023 Unreclaimed Sites Sampling: Ur-31 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jun 2026

Draft Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Unreclaimed Sites Sampling: Ur-31 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jun 2026

Draft Final 2023 Unreclaimed Sites Sampling: Ur-31 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Unreclaimed Sites Sampling: Ur-46 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jun 2026

Draft Final 2024 Unreclaimed Sites Sampling: Ur-46 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Unreclaimed Sites Sampling: Ur-27 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jun 2026

Draft Final 2022 Unreclaimed Sites Sampling: Ur-27 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Fourth Quarter 2025, Pioneer Technical Services, Inc. Jun 2026

Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Fourth Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Bpsou Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jun 2026

Draft Final Bpsou Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Draft Final 2026 Butte Priority Soils Operable Unit (Bpsou) Type B Borrow Material Submittal #3 (Dated May 6, 2026), Molly Roby May 2026

Re: Approval Letter For The Draft Final 2026 Butte Priority Soils Operable Unit (Bpsou) Type B Borrow Material Submittal #3 (Dated May 6, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2026 Revised Draft Final Backfill And Cover Soil Quality Assurance Project Plan (Qapp) (Dated May 13, 2026), Molly Roby May 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2026 Revised Draft Final Backfill And Cover Soil Quality Assurance Project Plan (Qapp) (Dated May 13, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Diggings East Final 100% Remedial Design Package Submittal, Josh Bryson May 2026

Butte Priority Soils Operable Unit Diggings East Final 100% Remedial Design Package Submittal, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit (Bpsou) Draft 2025 Groundwater Monitoring Data Summary Report Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson, Pioneer Technical Services, Inc. May 2026

Re: Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit (Bpsou) Draft 2025 Groundwater Monitoring Data Summary Report Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: 1st Quarter 2026 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson May 2026

Re: 1st Quarter 2026 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Conservation Area Approved Final Principles For A Greener Cleanup Report, Woodard & Curran May 2026

Silver Bow Creek Conservation Area Approved Final Principles For A Greener Cleanup Report, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Bpsou Blacktail Creek Riparian Actions Uniform Federal Policy Quality Assurance Project Plan Addendum (Dated April 24, 2026), Emma Rott May 2026

Re: Comment Letter For Bpsou Blacktail Creek Riparian Actions Uniform Federal Policy Quality Assurance Project Plan Addendum (Dated April 24, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Butte Reduction Works Smelter Area Intermediate 60% Remedial Design Submittal, Pioneer Technical Services, Inc., Atlantic Richfield Company May 2026

Butte Priority Soils Operable Unit Butte Reduction Works Smelter Area Intermediate 60% Remedial Design Submittal, Pioneer Technical Services, Inc., Atlantic Richfield Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Unreclaimed Sites Sampling: Ur-21 Site Evaluation Summary Report, Pioneer Technical Services, Inc. May 2026

Draft Final 2024 Unreclaimed Sites Sampling: Ur-21 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Subject: Quarterly Operations And Maintenance Report Grove Gulch Sedimentation Bay For Fourth Quarter 2025 And First Quarter 2026 Silver Bow Creek/Butte Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson May 2026

Subject: Quarterly Operations And Maintenance Report Grove Gulch Sedimentation Bay For Fourth Quarter 2025 And First Quarter 2026 Silver Bow Creek/Butte Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2026 Revised Draft Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. May 2026

2026 Revised Draft Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Urban Conflagrations: Structural Ash And Soil Metal(Loid) Contamination After California’S Eaton And Palisades Fires, S. Anselme Dossou, Leon Kelly, P. Louis Lu, Robin Jones, Oliver O'Donnell, Justin St. P. Walsh, Daniel D. Richter May 2026

Urban Conflagrations: Structural Ash And Soil Metal(Loid) Contamination After California’S Eaton And Palisades Fires, S. Anselme Dossou, Leon Kelly, P. Louis Lu, Robin Jones, Oliver O'Donnell, Justin St. P. Walsh, Daniel D. Richter

Art Faculty Articles and Research

In the weeks after California’s Eaton-Palisades wildfires, structural ash of burned homes and soils from yards and curbsides were sampled for analysis of Pb, As, and eight metals from 32 burned residences. About six months after fires and after US Army Corps of Engineers’ Phase 2 cleanups removed 15 cm from structural ash footprints, 17 properties were resampled within about a meter of original sampling sites. Concentrations of metal(oid)s in structural ash and residential soils varied between and within properties with significant spatial and temporal patterns. Lead concentrations were highest in structural ash and soil of yards of select pre-1970s …


Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025, Pioneer Technical Services, Inc. May 2026

Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Old Butte Silver Bow Landfill/Clark Tailings Consolidated Waste Management Area (Ctcwma) Remedy Effectiveness Evaluation Phase I (Conceptual Site Model) (Dated February 27, 2026), Emma Rott May 2026

Re: Comment Letter For Old Butte Silver Bow Landfill/Clark Tailings Consolidated Waste Management Area (Ctcwma) Remedy Effectiveness Evaluation Phase I (Conceptual Site Model) (Dated February 27, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Mine Waste Repository Operation And Maintenance (O&M) Plan, Pioneer Technical Services, Inc. May 2026

Draft Final Butte Mine Waste Repository Operation And Maintenance (O&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) (Dated April 16, 2026), Emma Rott May 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) (Dated April 16, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) 2026 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson May 2026

Butte Priority Soils Operable Unit (Bpsou) 2026 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Brine Solidification And Metals Sequestration Using Lignocellulosics, Frank Kvietok May 2026

Brine Solidification And Metals Sequestration Using Lignocellulosics, Frank Kvietok

World of Coal Ash Proceedings

Coal ash has historically been used as a convenient, on-site solidification material for brines generated from flue gas desulfurization at power plants. As alternate utilization scenarios are developed for coal ash, lignocellulosic (wood-based) sorbents can serve as a highly efficient substitute for the solidification process. Results will be shared for a variety of different brine types: thermally reduced, thermally reduced and neutralized, and reverse osmosis. In addition to solidification performance, which demonstrated a 3-4x mass of liquid vs mass of sorbent factor, studies were conducted to quantify the strength of binding to the wood-based sorbent for a broad range of …


Practical Guidelines For Pump Testing Of Ccr: Workflow, Design, And Lessons Learned., Nathanial Keller, Brian Hennings, Vic Modeer, Katie Moran May 2026

Practical Guidelines For Pump Testing Of Ccr: Workflow, Design, And Lessons Learned., Nathanial Keller, Brian Hennings, Vic Modeer, Katie Moran

World of Coal Ash Proceedings

This session presents a streamlined approach for pump testing of coal combustion residuals (CCR) to maximize hydraulic information with limited well installations, variable pumping rates, and short tests. Pre-test forward modeling identifies well offsets (typically 5–10 ft) and test durations (~2–6 hours) to yield measurable and analyzable drawdown at observation wells despite low pumping rates. Field execution consists of short step-drawdown testing to evaluate well specific capacity and select pumping rates for a constant rate test with one or more observation wells. Test results facilitate analysis of transmissivity and storativity of the CCR. Applied at two Midwestern sites with different …


Simplified Approximate Procedure For Assessing The Implications Of Updated Usgs Seismic Hazard Models On Seismic Stability Assessments Of Ccr Impoundment Facilities, Nick Mcclung, Matt Bishop, Adrian Pena-Iguaran, Seda Gokyer-Erbis May 2026

Simplified Approximate Procedure For Assessing The Implications Of Updated Usgs Seismic Hazard Models On Seismic Stability Assessments Of Ccr Impoundment Facilities, Nick Mcclung, Matt Bishop, Adrian Pena-Iguaran, Seda Gokyer-Erbis

World of Coal Ash Proceedings

Selection of appropriate seismic design ground motions remains a key challenge for seismic stability assessments of coal combustion residual (CCR) impoundment facilities, particularly where regulatory guidance does not specify a required hazard model. This paper examines the implications of using Uniform Hazard Spectra (UHS) derived from the 2014 versus the 2018 U.S. Geological Survey (USGS) National Seismic Hazard Model (NSHM) for seismic amplification and stability evaluations of the Tennessee Valley Authority (TVA) Widows Creek Fossil (WCF) Plant CCR Management Units. The 2018 NSHM incorporates updated understanding of seismicity in the central and eastern United States and generally predicts higher ground …


Integrating Advanced Geochemical Workflows With Modern Statistical Tools To Improve The Decision-Making Process At Ccr Sites, A Case Study, Glenna Thomas May 2026

Integrating Advanced Geochemical Workflows With Modern Statistical Tools To Improve The Decision-Making Process At Ccr Sites, A Case Study, Glenna Thomas

World of Coal Ash Proceedings

While statistical assessment provides the foundation for CCR compliance reporting, incorporating a holistic geochemical framework transforms statistics from a compliance requirement into a powerful predictive tool. Strategic geochemical insight established the basis of understanding needed to support successful statistical approaches and to ensure that statistical outcomes reflect actual groundwater behavior. Whether it is trend analysis, delineating source mechanism, or updating geochemical conceptual site models (GCMs), geochemical context provides the technical foundations for statistical outputs and methods. A continuously refined GCSM enhances the ability to anticipate how groundwater chemistry should evolve, improving interpretation and predictive capability. This allows practitioners to understand …


Before The Limit Hits: Lessons From A Proactive Construction Air Monitoring Program, Brian Egan, Nicholas Golden, Wendy Depp May 2026

Before The Limit Hits: Lessons From A Proactive Construction Air Monitoring Program, Brian Egan, Nicholas Golden, Wendy Depp

World of Coal Ash Proceedings

This presentation describes a comprehensive air monitoring program designed to protect workers and nearby neighborhoods during ash pond closure work. The program uses three main components: project (or boundary) monitoring at the site perimeter to track dust near the project boundaries, work area monitoring placed near active construction zones, and personal sampling on individual workers at regular intervals. Together, these approaches provide data on both community impacts and worker exposures, helping the team respond quickly when levels approach action limits. The Teams actions prior to exceedance of regulatory limits has helped prevent exposures. The talk will explain how monitors are …