Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1921 - 1950 of 4620

Full-Text Articles in Environmental Indicators and Impact Assessment

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 08 – Belle Of Butte, Mike Mcanulty Aug 2022

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 08 – Belle Of Butte, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 34 – Eveline (Dated July 22, 2022), Nikia Greene Aug 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 34 – Eveline (Dated July 22, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Colorado Dump – West Lot Remedial Action Work Plan (Rawp) (Dated July 29, 2022), Nikia Greene Aug 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Colorado Dump – West Lot Remedial Action Work Plan (Rawp) (Dated July 29, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Analysis Of Seismicity And Related Seismic Risk In Muslim Countries: Case Studies From Afghanistan And Pakistan, Ikramuddin Bahram Aug 2022

Analysis Of Seismicity And Related Seismic Risk In Muslim Countries: Case Studies From Afghanistan And Pakistan, Ikramuddin Bahram

Graduate Theses and Dissertations

How communities respond to a natural hazard is influenced by how they perceive it. This dissertation evaluated the gap between intent and action regarding earthquake hazards in Muslim countries with a focus on Afghanistan and Pakistan. Cultural biases provided predictions of risk perceptions and risk-taking preferences that were often more powerful than measures of knowledge and experience. In Muslim communities, perception of risk was influenced by the teachings of Islam and related rituals, traditions, and culture.

This study evaluated the seismicity and earthquake hazard in Afghanistan and Pakistan. Assessments of seismic risk and perception of danger were conducted to examine …


Application Of A 14c-Assay To Assess Methanotrophic Biodegradation Of Tce In Low Ph Groundwater, Evan Groome Aug 2022

Application Of A 14c-Assay To Assess Methanotrophic Biodegradation Of Tce In Low Ph Groundwater, Evan Groome

All Theses

Current biological strategies for remediating trichloroethylene (TCE) in low pH aquifers (i.e., pH14C-TCE assay was developed to determine pseudo first-order rate constants for the degradation of TCE in microcosms containing soil and groundwater from the Boeing Michigan Aeronautical Research Center (BOMARC) superfund site, where the pH ranges from 4.1 to 4.9. The 14C-TCE assay was also adapted to calculate soil-normalized rate constants for data from this site, as well as data that Szwast21 collected from the Beltsville Agricultural Research Center (BARC). In addition to natural attenuation, biostimulation through amendments of methane and nutrients were also assessed. This treatment …


Epbc 2010/5491: Weaber Plain Development Project Annual Environmental Report - 1st May 2021 To 30th April 2022, Department Of Primary Industries And Regional Development, Western Australia, Kimberley Boab Consulting Aug 2022

Epbc 2010/5491: Weaber Plain Development Project Annual Environmental Report - 1st May 2021 To 30th April 2022, Department Of Primary Industries And Regional Development, Western Australia, Kimberley Boab Consulting

Irrigated Agricultural Development in the North

This Weaber Plain Development Project EPBC Annual Environment Report for the period 1 May 2021 to 30 April 2022 has been developed in accordance with Condition 3 of the Commonwealth Environmental Approval for the Weaber Plain Development Project, EPBC 2010/5491, issued under the Environment Protection and Biodiversity Conservation (EPBC) Act 1999.

The Western Australian Government, Kimberley Agricultural Investment Pty Ltd (KAI) and the Yawoorroong Miriuwung Gajerrong Yirrgeb Noong Dawang Aboriginal Corporation (MG Corp) are completing farm development and conducting irrigated agriculture across the Weaber Plain, north of Kununurra in the eastern Kimberley region of WA.

This report has been prepared …


Final Butte Reclaimed Areas Maintenance And Monitoring (M&M) Plan In Accordance With Butte Reclamation Evaluation System (Bres), Pioneer Technical Services, Inc. Aug 2022

Final Butte Reclaimed Areas Maintenance And Monitoring (M&M) Plan In Accordance With Butte Reclamation Evaluation System (Bres), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Solid Media Management Program Plan, Pioneer Technical Services, Inc. Aug 2022

Revised Draft Final Solid Media Management Program Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Revised Final Residential Metals Abatement Program (Rmap) Plan, Mike Mcanulty Jul 2022

Butte Priority Soils Operable Unit (Bpsou) Revised Final Residential Metals Abatement Program (Rmap) Plan, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Comments For Butte Priority Soils Operable Unit (Bpsou) Draft Final Street And Snow Management Plan (Received December 15, 2021), Mike Mcanulty Jul 2022

Response To Comments For Butte Priority Soils Operable Unit (Bpsou) Draft Final Street And Snow Management Plan (Received December 15, 2021), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 32 – Corra-2 Dumps, Mike Mcanulty Jul 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 32 – Corra-2 Dumps, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2022

2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft, Mike Mcanulty Jul 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2022

2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Bpsou Insufficiently Reclaimed Sites Colorado Dump-West Lot Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jul 2022

Final Bpsou Insufficiently Reclaimed Sites Colorado Dump-West Lot Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Revised Final Residential Metals Abatement Program (Rmap) Plan, Mike Mcanulty Jul 2022

Re: Butte Priority Soils Operable Unit (Bpsou) Revised Final Residential Metals Abatement Program (Rmap) Plan, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) (Dated July 12, 2022), Nikia Greene Jul 2022

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) (Dated July 12, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft (Dated July 20, 2022), Nikia Greene Jul 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft (Dated July 20, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For: Bpsou Draft 2021 Stormwater Evaluation And Maintenance Report, (Dated July 14, 2022), Nikia Greene Jul 2022

Comment Letter For: Bpsou Draft 2021 Stormwater Evaluation And Maintenance Report, (Dated July 14, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2021 Unreclaimed Sites Sampling Ur-24 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jul 2022

Draft Final 2021 Unreclaimed Sites Sampling Ur-24 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty Jul 2022

Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 133 – Dexter Mill (Dated July 14, 2022), Nikia Greene Jul 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 133 – Dexter Mill (Dated July 14, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Annual Quality Assurance Project Plan For Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site; Phase Ii Brw Quality Assurance Project Plan (Dated July 8, 2022), Nikia Greene Jul 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Annual Quality Assurance Project Plan For Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site; Phase Ii Brw Quality Assurance Project Plan (Dated July 8, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Draft Final 2021 Unreclaimed Site Investigation: Xrf To Laboratory Correlation And Regression Analyses Procedure (Dated May 16, 2022), Nikia Greene Jul 2022

Comment Letter For The Draft Final 2021 Unreclaimed Site Investigation: Xrf To Laboratory Correlation And Regression Analyses Procedure (Dated May 16, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 34 – Eveline., Mike Mcanulty Jul 2022

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 34 – Eveline., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Reduction Works (Brw) Phase I Qapp, Pioneer Technical Services, Inc., Nikia Greene Jul 2022

Final Butte Reduction Works (Brw) Phase I Qapp, Pioneer Technical Services, Inc., Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Revised Butte Reduction Works (Brw) Phase I Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2022

Final Revised Butte Reduction Works (Brw) Phase I Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Response To Agency Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2021 Groundwater Monitoring Data Summary Report, January 2021 – December 2021; Dated April 8, 2022. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Jul 2022

Re: Response To Agency Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2021 Groundwater Monitoring Data Summary Report, January 2021 – December 2021; Dated April 8, 2022. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft, Mike Mcanulty Jul 2022

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc. Jul 2022

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.