Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1861 - 1890 of 4620

Full-Text Articles in Environmental Indicators and Impact Assessment

Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-39 Site Evaluation Summary Report (June 15, 2022), Nikia Greene Sep 2022

Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-39 Site Evaluation Summary Report (June 15, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Butte Priority Soils Operable Unit (Bpsou) Annual Quality Assurance Project Plan For Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site; Phase Iii Brw Quality Assurance Project Plan (Dated June 29, 2022), Nikia Greene Sep 2022

Comments On The Butte Priority Soils Operable Unit (Bpsou) Annual Quality Assurance Project Plan For Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site; Phase Iii Brw Quality Assurance Project Plan (Dated June 29, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 6, Revision 1 (Dated September 8, 2022), Nikia Greene Sep 2022

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 6, Revision 1 (Dated September 8, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 1, Revision 1 (Dated September 8, 2022), Nikia Greene Sep 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 1, Revision 1 (Dated September 8, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 5, Revision 1 (Dated September 8, 2022), Nikia Greene Sep 2022

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 5, Revision 1 (Dated September 8, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 3, Revision 1 (Dated September 8, 2022), Nikia Greene Sep 2022

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 3, Revision 1 (Dated September 8, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Revision No. 1, Residential Metals Abatement Program (Rmap), Quality Assurance Project Plan (Qapp), Non-Residential Parcels – Indoor Dust (Dated September 9, 2022), Nikia Greene Sep 2022

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Revision No. 1, Residential Metals Abatement Program (Rmap), Quality Assurance Project Plan (Qapp), Non-Residential Parcels – Indoor Dust (Dated September 9, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Annual Quality Assurance Project Plan For Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site; Phase I Brw Quality Assurance Project Plan (Dated July 20, 2022), Nikia Greene Sep 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Annual Quality Assurance Project Plan For Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site; Phase I Brw Quality Assurance Project Plan (Dated July 20, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Street And Snow Management Plan, Mike Mcanulty Sep 2022

Butte Priority Soils Operable Unit (Bpsou) Final Street And Snow Management Plan, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 158 - Waste Rock Dump, Mike Mcanulty Sep 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 158 - Waste Rock Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-35 Site Evaluation Summary Report (June 15, 2022), Nikia Greene Sep 2022

Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-35 Site Evaluation Summary Report (June 15, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-38 Site Evaluation Summary Report (June 8, 2022), Nikia Greene Sep 2022

Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-38 Site Evaluation Summary Report (June 8, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-33 Site Evaluation Summary Report (June 6, 2022), Nikia Greene Sep 2022

Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-33 Site Evaluation Summary Report (June 6, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For Draft Final Bpsou Subdrain Pump Station Remedial Design (Rd) Work Plan (Dated June 14, 2022), Nikia Greene Sep 2022

Comment Letter For Draft Final Bpsou Subdrain Pump Station Remedial Design (Rd) Work Plan (Dated June 14, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Environmental Justice Mapping In The U.S. Pacific Island Territory Of Guam, Ben Rocha Sep 2022

Environmental Justice Mapping In The U.S. Pacific Island Territory Of Guam, Ben Rocha

Master of Science in Environmental Sciences and Management Projects

Academics, regulators, and the public currently use geospatial analysis tools to identify locations that may be candidates for further environmental justice review in the continental United States (U.S.). However, current environmental justice geospatial analysis tools overlook a small but significant portion of the U.S. - the U.S. Pacific Islands. This study analyzes environmental justice within the U.S. Territory of Guam using existing geospatial analysis methods and publicly available environmental, climate, and socio-economic data to: (1) Spatially map relevant demographic and environmental data and (2) determine the correlation, if any, between the exposure to environmental hazards and the socio-economic status of …


Sea Level Rise Estimation On The Pacific Coast From Southern California To Vancouver Island, Xiaoxing He, Jean-Philippe Montillet, Rui Fernandes, Timothy I. Melbourne, Weiping Jiang, Zhengkai Huang Sep 2022

Sea Level Rise Estimation On The Pacific Coast From Southern California To Vancouver Island, Xiaoxing He, Jean-Philippe Montillet, Rui Fernandes, Timothy I. Melbourne, Weiping Jiang, Zhengkai Huang

Geological Sciences Faculty Scholarship

Previous studies have estimated the sea level rise (SLR) at various locations on the west coast of the USA and Vancouver Island in Canada. Here, we construct an entire SLR profile from Vancouver Island in the Pacific Northwest to San Diego in Southern California. First, we process global navigation satellite system (GNSS) measurements at 405 stations blanketing the whole coast to generate a profile of vertical land motion (VLM) known to bias century-long tide gauge (TG) measurements recording relative SLR (RSLR). We are then able to estimate the absolute SLR (ASLR) by correcting the SLR with the VLM. Our study …


2022 Lab Results Annual, Pioneer Technical Services, Inc. Sep 2022

2022 Lab Results Annual, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 3q Daily Pts Field Dump, Pioneer Technical Services, Inc. Sep 2022

2022 3q Daily Pts Field Dump, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Acid Mine Drainage In The Shamokin Creek Watershed: A Spatial Analysis Of Economic And Environmental Consequences Of Coal Mining, Ben Shimer Sep 2022

Acid Mine Drainage In The Shamokin Creek Watershed: A Spatial Analysis Of Economic And Environmental Consequences Of Coal Mining, Ben Shimer

Student Project Reports

No abstract provided.


2022 Final Blacktail Creek Remediation And Contaminated Groundwater Hydraulic Control Site Pumping Test Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Aug 2022

2022 Final Blacktail Creek Remediation And Contaminated Groundwater Hydraulic Control Site Pumping Test Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) 2022 Final Insufficiently Reclaimed Areas Quality Assurance Project Plan (Qapp), Mike Mcanulty Aug 2022

Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) 2022 Final Insufficiently Reclaimed Areas Quality Assurance Project Plan (Qapp), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Research On The Detection Technologies Of Ship Exhaust Gas In Emission Control Areas, Binting Tu Aug 2022

Research On The Detection Technologies Of Ship Exhaust Gas In Emission Control Areas, Binting Tu

World Maritime University Dissertations

No abstract provided.


Comments For The Draft Final Butte Priority Soils Operable Unit, Draft Final 2021 Unreclaimed Sites Sampling Ruby Street (Ur-05) Site Evaluation Summary Report (May 2022), Nikia Greene Aug 2022

Comments For The Draft Final Butte Priority Soils Operable Unit, Draft Final 2021 Unreclaimed Sites Sampling Ruby Street (Ur-05) Site Evaluation Summary Report (May 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Tables A1, A2, A3, A4, A5 2021, Pioneer Technical Services, Inc., Environmental Protection Agency Aug 2022

Tables A1, A2, A3, A4, A5 2021, Pioneer Technical Services, Inc., Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Overall Data Summary, Pioneer Technical Services, Inc., Environmental Protection Agency Aug 2022

Overall Data Summary, Pioneer Technical Services, Inc., Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Butte Area Npl Site 2nd Quarter 2022 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Aug 2022

Silver Bow Creek Butte Area Npl Site 2nd Quarter 2022 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


1st Sem 2022 Bpsou Gw Data, Woodard & Curran, Hannah Foster Aug 2022

1st Sem 2022 Bpsou Gw Data, Woodard & Curran, Hannah Foster

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Q2 Bpsou Sw, Environmental Protection Agency, Pioneer Technical Services, Inc. Aug 2022

2022 Q2 Bpsou Sw, Environmental Protection Agency, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Of The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2021 Groundwater Monitoring Data Summary Report, January 2021 – December 2021 (Dated July 20, 2022), Nikia Greene Aug 2022

Approval Of The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2021 Groundwater Monitoring Data Summary Report, January 2021 – December 2021 (Dated July 20, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2019 - 2021 Wsssou Data For Gis, Pioneer Technical Services, Inc. Aug 2022

2019 - 2021 Wsssou Data For Gis, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.