Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1711 - 1740 of 4620

Full-Text Articles in Environmental Indicators and Impact Assessment

Final 2021 Insufficiently Reclaimed Sites Sampling Bres No. 154 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2023

Final 2021 Insufficiently Reclaimed Sites Sampling Bres No. 154 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2021 Insufficiently Reclaimed Sites Sampling Bres No. 104 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2023

Final 2021 Insufficiently Reclaimed Sites Sampling Bres No. 104 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Stormwater Bmps Repair, Inspection Report, And Maintenance Work Plan Bnsf Railway Company And Union Pacific Railroad Company Butte Priority Soils Operable Unit Kj 2299019.00, Doug Brannan P.E. Feb 2023

2022 Stormwater Bmps Repair, Inspection Report, And Maintenance Work Plan Bnsf Railway Company And Union Pacific Railroad Company Butte Priority Soils Operable Unit Kj 2299019.00, Doug Brannan P.E.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Residential Metals Abatement Program (Rmap) Walkerville Park (Alley Of North Main And Alley Of West Daly) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Feb 2023

Draft Final 2023 Residential Metals Abatement Program (Rmap) Walkerville Park (Alley Of North Main And Alley Of West Daly) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Stormwater Bmps Repair, Inspection Report, And Maintenance Work Plan Bnsf Railway Company And Union Pacific Railroad Company Butte Priority Soils Operable Unit Kj 2299019.00, Doug Brannan P.E., Kennedy Jenks Feb 2023

2022 Stormwater Bmps Repair, Inspection Report, And Maintenance Work Plan Bnsf Railway Company And Union Pacific Railroad Company Butte Priority Soils Operable Unit Kj 2299019.00, Doug Brannan P.E., Kennedy Jenks

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2021 Rmap Non-Residential Parcels Data Summary Report Silver Bow Creek/Butte Area Npl Site Bpsou, Environmental Standards, Inc., Pioneer Technical Services, Inc. Feb 2023

2021 Rmap Non-Residential Parcels Data Summary Report Silver Bow Creek/Butte Area Npl Site Bpsou, Environmental Standards, Inc., Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2023 Residential Metals Abatement Program (Rmap) Rocker Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Feb 2023

Final 2023 Residential Metals Abatement Program (Rmap) Rocker Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit (Bpsou) 2021 Unreclaimed Sites Sampling – Ur-39 Site Evaluation Summary Report (Dated January 4, 2023), Nikia Greene Feb 2023

Final Butte Priority Soils Operable Unit (Bpsou) 2021 Unreclaimed Sites Sampling – Ur-39 Site Evaluation Summary Report (Dated January 4, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2021 Unreclaimed Sites Sampling Ur-38 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2023

Final 2021 Unreclaimed Sites Sampling Ur-38 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2021 Unreclaimed Sites Sampling Ur-35 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2023

Final 2021 Unreclaimed Sites Sampling Ur-35 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2021 Unreclaimed Sites Sampling Ur-03 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2023

Final 2021 Unreclaimed Sites Sampling Ur-03 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2021 Unreclaimed Sites Sampling Ur-36 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2023

Final 2021 Unreclaimed Sites Sampling Ur-36 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2021 Unreclaimed Sites Sampling Ur-24 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2023

Final 2021 Unreclaimed Sites Sampling Ur-24 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2021 Unreclaimed Sites Sampling Ur-33 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2023

Final 2021 Unreclaimed Sites Sampling Ur-33 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2021 Unreclaimed Sites Sampling Ur-05 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2023

Final 2021 Unreclaimed Sites Sampling Ur-05 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Bats Increased Foraging Activity At Experimental Prey Patches Near Hibernacula, Winifred F. Frick, Yvonne A. Dzal, Kristin A. Jonasson, Michael D. Whitby, Amanda M. Adams, Christen Long, John E. Depue, Christian M. Newman, Craig K. R. Willis, Tina L. Cheng Feb 2023

Bats Increased Foraging Activity At Experimental Prey Patches Near Hibernacula, Winifred F. Frick, Yvonne A. Dzal, Kristin A. Jonasson, Michael D. Whitby, Amanda M. Adams, Christen Long, John E. Depue, Christian M. Newman, Craig K. R. Willis, Tina L. Cheng

Nebraska Cooperative Fish and Wildlife Research Unit: Staff Publications

  1. Emerging infectious diseases in wildlife can threaten vulnerable host populations. Actions targeting habitat improvements to aid population resilience and recovery may be beneficial long-term strategies, yet testing the efficacy of such strategies before major conservation investments are made can be challenging.

  2. The disease white-nose syndrome (WNS) has caused severe declines in several species of North American hibernating bats. We tested a novel conservation approach targeted at improving foraging conditions near bat hibernacula by experimentally manipulating insect density in the pre-hibernation fattening period and spring emergence recovery period. We measured foraging (feeding buzzes) and echolocation activity of little brown bats Myotis …


Oria Stage Ii Expansion: Keep River Post-Development Aquatic Fauna And Targeted Sawfish Survey - 2022, Indopacific Environmental, Department Of Primary Industries And Regional Development, Western Australia Feb 2023

Oria Stage Ii Expansion: Keep River Post-Development Aquatic Fauna And Targeted Sawfish Survey - 2022, Indopacific Environmental, Department Of Primary Industries And Regional Development, Western Australia

Irrigated Agricultural Development in the North

This report presents the results of the 2022 Keep River Aquatic Fauna and Targeted Sawfish Survey which represents the final post-development survey required as per the project conditions of the Goomig Irrigation Development. Unlike the 2021 survey, which was affected by pandemic related travel restrictions that prohibited some sites from being surveyed, all regular monitoring sites were able to be sampled in 2022. Field work was undertaken September 2022 and sampling and analyses undertaken during the current study aligned with standardised methodologies set forth in the Ord River Irrigation Area – Weaber Plain Development Project Aquatic Fauna Management Plan.


Comments On The Draft Final Butte Priority Soils Operable Unit (Bpsou) Temporary Construction Surface Water Performance Standards Variance Request For Future Remedial Elements (Fresow) Projects (Dated December 7, 2022), Nikia Greene Feb 2023

Comments On The Draft Final Butte Priority Soils Operable Unit (Bpsou) Temporary Construction Surface Water Performance Standards Variance Request For Future Remedial Elements (Fresow) Projects (Dated December 7, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Assessing Ecosystem Health Through Contaminants In The Tijuana River National Estuarine Research Reserve, Nancy Torres Jan 2023

Assessing Ecosystem Health Through Contaminants In The Tijuana River National Estuarine Research Reserve, Nancy Torres

Theses

Although the Tijuana River Estuary (TRE) remains the largest, most-intact coastal wetland in Southern California, it has a history of major changes, much of this related to its location immediately north of the US / Mexico Border. One of the primary challenges is cross-border flows from the rapidly growing city of Tijuana, Baja California, Mexico, and the delivery of wastewater, debris, and sediment to sensitive coastal wetland ecosystems. There is a need to more fully investigate these environmental changes to assess the ecosystem health of the Tijuana River Estuary over time, especially related to pollution impacts. This can inform an …


Final-2023 Update, Butte Mine Flooding Operable Unit, Butte Priority Soils Operable Unit And Mt Pole, Babcgwa Quality Assurance Project Plan, Ver 1, And Crosswalk, Montana Bureau Of Mines And Geology Jan 2023

Final-2023 Update, Butte Mine Flooding Operable Unit, Butte Priority Soils Operable Unit And Mt Pole, Babcgwa Quality Assurance Project Plan, Ver 1, And Crosswalk, Montana Bureau Of Mines And Geology

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Aware Early Head Start, Environmental Resource Management (Erm) Jan 2023

Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Aware Early Head Start, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Highland View Christian School, Environmental Resource Management (Erm) Jan 2023

Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Highland View Christian School, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter: Bpsou Uncontrolled Surface Flow Areas Rdwp/Pdiwp, Dated November 8, 2023, Mike Mcanulty Jan 2023

Comment Letter: Bpsou Uncontrolled Surface Flow Areas Rdwp/Pdiwp, Dated November 8, 2023, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Residential Metals Abatement Program (Rmap) Rocker Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jan 2023

Draft Final 2023 Residential Metals Abatement Program (Rmap) Rocker Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On: Horseshoe Bend Water Treatment Plan [Hsbwtp] 2021 Annual Report; Dated November 15, 2022, Nikia Greene Jan 2023

Re: Comments On: Horseshoe Bend Water Treatment Plan [Hsbwtp] 2021 Annual Report; Dated November 15, 2022, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval For Quality Assurance Project Plan, 2023, Butte Mine Flooding Operable Unit And Butte Priority Soils Operable Unit, Private Well Monitoring Program, Dated November 2022, Nikia Greene Jan 2023

Approval For Quality Assurance Project Plan, 2023, Butte Mine Flooding Operable Unit And Butte Priority Soils Operable Unit, Private Well Monitoring Program, Dated November 2022, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp) (Dated June 17, 2022), Nikia Greene Jan 2023

Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp) (Dated June 17, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-30 Site Evaluation Summary Report (November 22, 2022), Nikia Greene Jan 2023

Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-30 Site Evaluation Summary Report (November 22, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-40 Site Evaluation Summary Report (April 11, 2022), Nikia Greene Jan 2023

Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-40 Site Evaluation Summary Report (April 11, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-34 Site Evaluation Summary Report (November 22, 2022), Nikia Greene Jan 2023

Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-34 Site Evaluation Summary Report (November 22, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.