Open Access. Powered by Scholars. Published by Universities.®

Environmental Health and Protection

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 661 - 690 of 2545

Full-Text Articles in Environmental Indicators and Impact Assessment

November 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister Dec 2024

November 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir-2024-Ra-02 (Dated December 19, 2024), Molly Roby Dec 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir-2024-Ra-02 (Dated December 19, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites And Insufficiently Reclaimed Areas – Racetrack Borrow Material Usage (Dated December 19, 2024), Molly Roby Dec 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites And Insufficiently Reclaimed Areas – Racetrack Borrow Material Usage (Dated December 19, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites And Insufficiently Reclaimed Areas – Racetrack Borrow Material Usage, Mike Mcanulty Dec 2024

Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites And Insufficiently Reclaimed Areas – Racetrack Borrow Material Usage, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis (Dated November 27, 2024), Emma Rott Dec 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis (Dated November 27, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Invasion Stress Mitigates Climate Stress In A Brackish Marsh Amphipod, Lorna E. Haworth, Sarah Nancollas, Susie N. Landa, Anne E. Todgham, Richelle L. Tanner Dec 2024

Invasion Stress Mitigates Climate Stress In A Brackish Marsh Amphipod, Lorna E. Haworth, Sarah Nancollas, Susie N. Landa, Anne E. Todgham, Richelle L. Tanner

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

  1. Organisms in coastal brackish ecosystems face not only highly variable environmental conditions, but the intensity and stochasticity of these environmental conditions are anticipated to increase due to climate change. While environmental changes are often presented unilaterally as stressors, there are some anthropogenic environmental transformations, such as the introduction of habitat forming plant species, that may mitigate physiological stress imposed by warming. In Suisun Marsh in the California Delta, native plant canopies allow light and heat to penetrate to the understory yet the canopies of the introduced Phragmites australis reed block out sunlight and heat for organisms living below.
  2. We set …


Berkeley Pit Geochemical And Limnological Evaluation Pre-Design Investigation (Pdi) Work Plan, Josh Bryson Dec 2024

Berkeley Pit Geochemical And Limnological Evaluation Pre-Design Investigation (Pdi) Work Plan, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study (Dated October 10, 2024), Emma Rott Dec 2024

Re: Comment Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study (Dated October 10, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Identifying Opportunities For Nature-Based Solutions With Geospatialized Life Cycle Assessments And Fine-Scale Socioecological Data, Gabriela Shirkey, Annick Anctil, Ranjeet John, Venkatesh Kolluru, Leah Mungai, Herve Kashongwe, Lauren T. Cooper, Ilke Celik, Joshua B. Fisher, Jiquan Chen Dec 2024

Identifying Opportunities For Nature-Based Solutions With Geospatialized Life Cycle Assessments And Fine-Scale Socioecological Data, Gabriela Shirkey, Annick Anctil, Ranjeet John, Venkatesh Kolluru, Leah Mungai, Herve Kashongwe, Lauren T. Cooper, Ilke Celik, Joshua B. Fisher, Jiquan Chen

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

As we increasingly understand the impact that land management intensification has on local and global climate, the call for nature-based solutions (NbS) in agroecosystems has expanded. Moreover, the pressing need to determine when and where NbS should be used raises challenges to socioecological data integration as we overcome spatiotemporal resolutions. Natural and working lands is an effort promoting NbS, particularly emissions reduction and carbon stock maintenance in forests. To overcome the spatiotemporal limitation, we integrated life cycle assessments (LCA), an ecological carbon stock model, and a land cover land use change model to synthesize rates of global warming potential (GWP) …


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Plan (Dated October 29, 2024), Molly Roby Dec 2024

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Plan (Dated October 29, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


And Climate Justice For All Dec 2024

And Climate Justice For All

DePaul Magazine

DePaul is taking its environmental sustainability and equity prowess to the next level through its Just DePaul and President's Sustainability Committee initiatives that incorporate a climate action plan and student voices. Plus, community partnership courses that involve students in environmental action and justice efforts.


Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-01, Revision 1, Mike Mcanulty Dec 2024

Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-01, Revision 1, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Butte Area Npl Site 3rd Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She, Josh Bryson Dec 2024

Silver Bow Creek Butte Area Npl Site 3rd Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir-2024-Ra-01 (Dated December 3, 2024), Molly Roby Dec 2024

Re: Comment Letter For Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir-2024-Ra-01 (Dated December 3, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Silver Bow Creek Butte Area Npl Site 3rd Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She, Josh Bryson Dec 2024

Re: Silver Bow Creek Butte Area Npl Site 3rd Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Dec 2024

Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report (Dated September 16, 2024), Emma Rott Dec 2024

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report (Dated September 16, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Insufficiently Reclaimed Sites Sampling Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report, Mike Mcanulty Dec 2024

Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Insufficiently Reclaimed Sites Sampling Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc. Dec 2024

Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Investigation Summary Report After The Bell Child Care Center, Environmental Resource Management (Erm) Dec 2024

Residential Metals Abatement Program Investigation Summary Report After The Bell Child Care Center, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty Dec 2024

Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-01, Mike Mcanulty Dec 2024

Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-01, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


The Impact Of Student Engagement Activities On Future Climate Change Adaptation: The Case Of Student Simulation Models, Bassel Mostafa Elkalaf Dec 2024

The Impact Of Student Engagement Activities On Future Climate Change Adaptation: The Case Of Student Simulation Models, Bassel Mostafa Elkalaf

Future Journal of Social Science

This paper explores the critical role of student engagement in addressing the growing challenges of climate change, with a focus on the Model United Nations (MUN) as a case study. As climate-related security threats increase globally, educational platforms that prepare youth for effective leadership in climate politics are more essential than ever. MUN, a widely practiced student activity simulating global policy-making, provides a valuable opportunity for students to deepen their understanding of the interconnectedness between climate change, peace, and security. By participating in MUN simulations, students engage in debates, develop innovative solutions, and practice diplomatic skills, all while exploring the …


Draft Final 2022 Insufficiently Reclaimed Sites Sampling Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc. Dec 2024

Draft Final 2022 Insufficiently Reclaimed Sites Sampling Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Time Series Decomposition Of Land Surface Temperature For Long-Term Trend Forecasting And Impact On Nesting Sea Turtle Habitats In The Arabian Gulf, Sachi Perera, Rommel H. Maneja, Mohamed Allali, Cyril Rakovski, Erik Linstead, Daniele Struppa, Ali Qasem, Hesham El-Askary Dec 2024

Time Series Decomposition Of Land Surface Temperature For Long-Term Trend Forecasting And Impact On Nesting Sea Turtle Habitats In The Arabian Gulf, Sachi Perera, Rommel H. Maneja, Mohamed Allali, Cyril Rakovski, Erik Linstead, Daniele Struppa, Ali Qasem, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

Improving land surface temperature (LST) modeling is vital for mitigating climate change effects on various ecosystems and marine habitats such as important sea turtle habitats. Over the past decade, extreme temperatures have likely significantly affected nesting sea turtle habitats in the Arabian Gulf, with predominantly female hatchlings creating an imbalance in the sex ratio. Such shifts have profound implications for these habitats’ long-term survival and conservation management. This study leverages statistical machine learning models to measure ongoing temporal variations in LST. We break down the LST time series into trend, seasonal, and noise components using classical decomposition methods like X11, …


Multi-Temporal Analysis Of Urbanization-Driven Slope And Ecological Impact Using Machine-Learning And Remote Sensing Techniques, Zhang Hao, Muhammad Haseeb, Zheng Xiangtian, Zainab Tahir, Syed Amer Mahmood, Aqil Tariq, Rana Waqar Aslam, M. Abdullah-Al-Wadud, Hesham El-Askary Nov 2024

Multi-Temporal Analysis Of Urbanization-Driven Slope And Ecological Impact Using Machine-Learning And Remote Sensing Techniques, Zhang Hao, Muhammad Haseeb, Zheng Xiangtian, Zainab Tahir, Syed Amer Mahmood, Aqil Tariq, Rana Waqar Aslam, M. Abdullah-Al-Wadud, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

Rapid urbanization in Lahore, Pakistan, has led to significant ecological and thermal challenges, particularly the intensification of Urban Heat Island (UHI) effects and increased thermal stress as measured by the Urban Thermal Field Variance Index (UTFVI). This study employs a multi-temporal evaluation of Landsat satellite imagery and GIS-based analysis to investigate the Spatio-temporal trends in land-use and land-cover (LULC) changes from 1994 to 2024. We detected substantial changes in urban growth, vegetation cover, and barren areas using supervised classification (Random Forest) methods and remote sensing indices such as NDVI (Normalized Difference Vegetation Index), NDMI (Normalized Difference Moisture Index), NDBI (Normalized …


Comment Letter For Draft Final Bpsou Quarterly Operations And Maintenance Report Butte Treatment Lagoon System-Second Quarter 2024 (Dated September 27, 2024), Emma Rott Nov 2024

Comment Letter For Draft Final Bpsou Quarterly Operations And Maintenance Report Butte Treatment Lagoon System-Second Quarter 2024 (Dated September 27, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis, Pioneer Technical Services, Inc., Josh Bryson Nov 2024

Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis, Pioneer Technical Services, Inc., Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – October 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis Nov 2024

Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – October 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


October 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister Nov 2024

October 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.