Open Access. Powered by Scholars. Published by Universities.®
Environmental Indicators and Impact Assessment Commons™
Open Access. Powered by Scholars. Published by Universities.®
- Institution
-
- Montana Tech Library (1827)
- Chapman University (86)
- University of Nevada, Las Vegas (83)
- University of Nebraska - Lincoln (48)
- University of Louisville (43)
-
- SIT Graduate Institute/SIT Study Abroad (39)
- Department of Primary Industries and Regional Development, Western Australia (31)
- University of Southern Maine (28)
- Eastern Kentucky University (26)
- Portland State University (19)
- Bemidji State University (10)
- Colby College (10)
- University of Dayton (10)
- California Polytechnic State University, San Luis Obispo (9)
- City University of New York (CUNY) (9)
- Claremont Colleges (9)
- The University of San Francisco (9)
- University of Arkansas, Fayetteville (9)
- University of New England (9)
- Montclair State University (8)
- World Maritime University (8)
- Western Kentucky University (7)
- Augustana College (6)
- Center for the Blue Economy (6)
- Technological University Dublin (6)
- DePaul University (5)
- Murray State University (5)
- Nova Southeastern University (5)
- University of Connecticut (5)
- University of Kentucky (5)
- Keyword
-
- Priority Soils (398)
- Metals Abatement (228)
- Unreclaimed Sites (147)
- Field Sampling (143)
- Quality Assurance (127)
-
- Consent Decree (126)
- Groundwater (104)
- Insufficiently Reclaimed Sites (102)
- Indoor Dust (74)
- Berkeley Pit (67)
- Soil Sampling (62)
- Butte Treatment Lagoon (57)
- Lead (57)
- Water quality (56)
- Environment (55)
- Stormwater (55)
- Groundwater Monitoring (54)
- Smelter Area (53)
- Blacktail Creek (49)
- Surface Water Monitoring (49)
- Maintenance (48)
- Arsenic (47)
- Mercury (43)
- Maintenance Report (41)
- Monitoring (41)
- Butte Reduction Works (40)
- Envirome (40)
- Silver Bow Creek (40)
- Sustain (40)
- Residential Metals Abatement (39)
- Publication Year
- Publication
-
- Silver Bow Creek/Butte Area Superfund Site (1827)
- Publications (WR) (51)
- Mathematics, Physics, and Computer Science Faculty Articles and Research (41)
- Sustain Magazine (41)
- Independent Study Project (ISP) Collection (35)
-
- Biology, Chemistry, and Environmental Sciences Faculty Articles and Research (29)
- EKU Faculty and Staff Scholarship (26)
- Nebraska Department of Environmental Quality: Reports (16)
- Department of Environmental Studies: Undergraduate Student Theses (12)
- Environmental Studies Faculty Publications (11)
- Biosecurity factsheets (10)
- UNLV Theses, Dissertations, Professional Papers, and Capstones (10)
- Electronic Theses and Dissertations (9)
- Physics Faculty Publications (9)
- Institute for ECHO Articles and Research (8)
- Maritime Safety & Environment Management Dissertations (Dalian) (8)
- Planning (8)
- Department of Earth and Environmental Studies Faculty Scholarship and Creative Works (7)
- Environmental Science and Management Professional Master's Project Reports (7)
- Pomona Senior Theses (7)
- Articles (6)
- Environmental Science and Management Faculty Publications and Presentations (6)
- Journal of Earth and Life Science (6)
- Maine Collection (6)
- Master's Projects and Capstones (6)
- National Invasive Species Council (6)
- Fisheries Occasional Publications (5)
- Graduate Theses and Dissertations (5)
- Honors Theses (5)
- Marine Affairs Theses and Major Papers (5)
- Publication Type
- File Type
Articles 421 - 450 of 2545
Full-Text Articles in Environmental Indicators and Impact Assessment
Re: Approval Letter For Bpsou Blacktail Creek Riparian Actions Draft Field Work Plan: Wetlands Delineation And Functional Assessment (Received August 8, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Notice Of Intent To Abandon Bps07-05a And Bps07-05b (Dated July 14, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 1 2025 (Dated June 30, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Superfund Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels (Revised On July 23, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 91 – Robert Emmett Dumps, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp)., Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 177 – North Alice Culvert, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc.
Draft Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Site-Wide Surface Water Monitoring Data Summary Report (Dated May 30, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Revised Butte Hill Revegetation Specifications, Mike Mcanulty, Eric Hassler
Butte Priority Soils Operable Unit (Bpsou) Revised Butte Hill Revegetation Specifications, Mike Mcanulty, Eric Hassler
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: 2025 Spring Semi-Annual – Interim Site-Wide Groundwater Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: 2nd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 35 Del Monte Reclamation Improvement Field Sampling Plan (Fsp), Mike Mcanulty
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 35 Del Monte Reclamation Improvement Field Sampling Plan (Fsp), Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Mine Flooding Site Cd, Cv 02-35 Bu-Rfc, 2025 Second Quarter Report, Mark Thompson, Dave Griffis
Re: Butte Mine Flooding Site Cd, Cv 02-35 Bu-Rfc, 2025 Second Quarter Report, Mark Thompson, Dave Griffis
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit Revised Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield Response To Agency Comments Received June 28, 2024, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp) For Ur-19 – Butte, Anaconda & Pacific Railway From Montana Street To South Arizona Avenue – Montana Street Adjacent Parcel, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 18 – Walkerville Ballfield, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 100 – Capri Motel – Arctic Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Revised Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 120 – Bonanza Dump, Mike Mcanulty
Re: Revised Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 120 – Bonanza Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter With Comments For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Annual Operations And Maintenance (O&M) Butte Treatment Lagoons (Btl) System 2024 (Dated May 30, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc.
Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc.
Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Sustainability: Buzz Word Or Future Of Fashion? Measuring The Feasibility Of Outright Sustainability Among Fast Fashion’S Biggest Agents, Ryan Miller
Apparel Merchandising and Product Development Undergraduate Honors Theses
Abstract
The fashion industry is currently experiencing unsustainable rates of pollution within its supply chains. The rapid increase in demand for short lead times perpetrated by large-scale retailers has led to hazardous practices negatively affecting both the environmental conditions and working conditions of producing countries. With this increased pressure, relationships between brands and suppliers have become untenable. Limited transparency and imbalanced power dynamics at the hand of the industry’s leading retailers require restructuring in order to build more sustainable and equitable supply-chain practices. Further, governmental regulation is currently limited in its capacity to enforce sustainable business practices on a global …
Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc.
Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc.
Revised Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023, Pioneer Technical Services, Inc.
Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2023, Pioneer Technical Services, Inc.
Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2023, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc.
Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.