Open Access. Powered by Scholars. Published by Universities.®
Environmental Indicators and Impact Assessment Commons™
Open Access. Powered by Scholars. Published by Universities.®
- Institution
-
- Montana Tech Library (1827)
- Chapman University (86)
- University of Nevada, Las Vegas (83)
- University of Nebraska - Lincoln (48)
- University of Louisville (43)
-
- SIT Graduate Institute/SIT Study Abroad (39)
- Department of Primary Industries and Regional Development, Western Australia (31)
- University of Southern Maine (28)
- Eastern Kentucky University (26)
- Portland State University (19)
- Bemidji State University (10)
- Colby College (10)
- University of Dayton (10)
- California Polytechnic State University, San Luis Obispo (9)
- City University of New York (CUNY) (9)
- Claremont Colleges (9)
- The University of San Francisco (9)
- University of Arkansas, Fayetteville (9)
- University of New England (9)
- Montclair State University (8)
- World Maritime University (8)
- Western Kentucky University (7)
- Augustana College (6)
- Center for the Blue Economy (6)
- Technological University Dublin (6)
- DePaul University (5)
- Murray State University (5)
- Nova Southeastern University (5)
- University of Connecticut (5)
- University of Kentucky (5)
- Keyword
-
- Priority Soils (398)
- Metals Abatement (228)
- Unreclaimed Sites (147)
- Field Sampling (143)
- Quality Assurance (127)
-
- Consent Decree (126)
- Groundwater (104)
- Insufficiently Reclaimed Sites (102)
- Indoor Dust (74)
- Berkeley Pit (67)
- Soil Sampling (62)
- Butte Treatment Lagoon (57)
- Lead (57)
- Water quality (56)
- Environment (55)
- Stormwater (55)
- Groundwater Monitoring (54)
- Smelter Area (53)
- Blacktail Creek (49)
- Surface Water Monitoring (49)
- Maintenance (48)
- Arsenic (47)
- Mercury (43)
- Maintenance Report (41)
- Monitoring (41)
- Butte Reduction Works (40)
- Envirome (40)
- Silver Bow Creek (40)
- Sustain (40)
- Residential Metals Abatement (39)
- Publication Year
- Publication
-
- Silver Bow Creek/Butte Area Superfund Site (1827)
- Publications (WR) (51)
- Mathematics, Physics, and Computer Science Faculty Articles and Research (41)
- Sustain Magazine (41)
- Independent Study Project (ISP) Collection (35)
-
- Biology, Chemistry, and Environmental Sciences Faculty Articles and Research (29)
- EKU Faculty and Staff Scholarship (26)
- Nebraska Department of Environmental Quality: Reports (16)
- Department of Environmental Studies: Undergraduate Student Theses (12)
- Environmental Studies Faculty Publications (11)
- Biosecurity factsheets (10)
- UNLV Theses, Dissertations, Professional Papers, and Capstones (10)
- Electronic Theses and Dissertations (9)
- Physics Faculty Publications (9)
- Institute for ECHO Articles and Research (8)
- Maritime Safety & Environment Management Dissertations (Dalian) (8)
- Planning (8)
- Department of Earth and Environmental Studies Faculty Scholarship and Creative Works (7)
- Environmental Science and Management Professional Master's Project Reports (7)
- Pomona Senior Theses (7)
- Articles (6)
- Environmental Science and Management Faculty Publications and Presentations (6)
- Journal of Earth and Life Science (6)
- Maine Collection (6)
- Master's Projects and Capstones (6)
- National Invasive Species Council (6)
- Fisheries Occasional Publications (5)
- Graduate Theses and Dissertations (5)
- Honors Theses (5)
- Marine Affairs Theses and Major Papers (5)
- Publication Type
- File Type
Articles 1441 - 1470 of 2545
Full-Text Articles in Environmental Indicators and Impact Assessment
Residential Metals Abatement Program – Interior School Soil ‐ Remedial Action Work Plan – Butte High School, Mike Mcanulty
Residential Metals Abatement Program – Interior School Soil ‐ Remedial Action Work Plan – Butte High School, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Revised Residential Metals Abatement Program (Rmap), Interior School Soils Remedial Action Work Plan (Rawp), Butte High School (Dated November 17, 2022), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Remedial Action Work Plan East Middle School, Environmental Resource Management (Erm)
Remedial Action Work Plan East Middle School, Environmental Resource Management (Erm)
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) – Temporary Construction Surface Water Performance Standards Variance Request For Fresow Projects, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final 2022 Residential Metals Abatement Program (Rmap) Koprivica Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Final 2022 Residential Metals Abatement Program (Rmap) Koprivica Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Annual Quality Assurance Project Plan For Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site; Phase Iii Brw Quality Assurance Project Plan (Dated November 29, 2022), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Memorandum – Final Revised - Recommended Qualification For Select Dust Cassette Data, Lester J. Dupes, Rock J. Vitale
Memorandum – Final Revised - Recommended Qualification For Select Dust Cassette Data, Lester J. Dupes, Rock J. Vitale
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Residential Metals Abatement Program – Interior School Dust ‐ Remedial Action Work Plan – East Middle School, Mike Mcanulty
Residential Metals Abatement Program – Interior School Dust ‐ Remedial Action Work Plan – East Middle School, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final 2022 Residential Metals Abatement Program (Rmap) Cherokee Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Final 2022 Residential Metals Abatement Program (Rmap) Cherokee Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Revised Butte Reduction Works (Brw) Phase Iii Qapp, Nikia Greene
Final Revised Butte Reduction Works (Brw) Phase Iii Qapp, Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Revised Butte Reduction Works (Brw) Phase Iii Qapp, Nikia Greene
Final Revised Butte Reduction Works (Brw) Phase Iii Qapp, Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2022 Draft Final Blacktail Creek Groundwater Hydraulic Control System Remedial Design Work Plan, Stantec Consulting Services, Inc.
2022 Draft Final Blacktail Creek Groundwater Hydraulic Control System Remedial Design Work Plan, Stantec Consulting Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2022 Draft Final Blacktail Creek Groundwater Hydraulic Control System Remedial Design Work Plan, Stantec Consulting Services, Inc.
2022 Draft Final Blacktail Creek Groundwater Hydraulic Control System Remedial Design Work Plan, Stantec Consulting Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty
Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft - Sieve Study Report December 2022, Appendices, Ramboll
Draft - Sieve Study Report December 2022, Appendices, Ramboll
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc.
Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comparison Of Sieved Soil Sample Results From Butte-Silver Bow Multi-Pathway Residential Metals Abatement Program: 250 Μm And 150 Μm Sieved Samples For Lead And Arsenic Enrichment Determination Atlantic Richfield Company Butte, Montana, Ramboll, Environmental Standards, Inc.
Comparison Of Sieved Soil Sample Results From Butte-Silver Bow Multi-Pathway Residential Metals Abatement Program: 250 Μm And 150 Μm Sieved Samples For Lead And Arsenic Enrichment Determination Atlantic Richfield Company Butte, Montana, Ramboll, Environmental Standards, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Increased Aerosols Can Reverse Twomey Effect In Water Clouds Through Radiative Pathway, Pradeep Khatri, Tadahiro Hayasaka, Brent N. Holben, Ramesh P. Singh, Husi Letu, Sachchida N. Tripathi
Increased Aerosols Can Reverse Twomey Effect In Water Clouds Through Radiative Pathway, Pradeep Khatri, Tadahiro Hayasaka, Brent N. Holben, Ramesh P. Singh, Husi Letu, Sachchida N. Tripathi
Biology, Chemistry, and Environmental Sciences Faculty Articles and Research
Aerosols play important roles in modulations of cloud properties and hydrological cycle by decreasing the size of cloud droplets with the increase of aerosols under the condition of fixed liquid water path, which is known as the first aerosol indirect effect or Twomey-effect or microphysical effect. Using high-quality aerosol data from surface observations and statistically decoupling the influence of meteorological factors, we show that highly loaded aerosols can counter this microphysical effect through the radiative effect to result both the decrease and increase of cloud droplet size depending on liquid water path in water clouds. The radiative effect due to …
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Solid Media Management Program Plan (Dated August 1, 2022), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump., Mike Mcanulty
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump., Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran
2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Revised Bpsou Subdrain Pump Station Remedial Design (Rd) Work Plan, Pioneer Technical Services, Inc.
Final Revised Bpsou Subdrain Pump Station Remedial Design (Rd) Work Plan, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran
2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Nikia Greene
2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Request For Information (Rfi) - 01 To The Butte Priority Soils Operable Unit (Bpsou) Final 2022 Unreclaimed Sites Quality Assurance Project Plan (Qapp) (Dated August 31, 2022), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.