Open Access. Powered by Scholars. Published by Universities.®

Environmental Health and Protection

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 121 - 150 of 2545

Full-Text Articles in Environmental Indicators and Impact Assessment

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) (Dated June 1, 2026), Emma Rott Jun 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) (Dated June 1, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Trophic Transfer Of Fluorescent Polyethylene Microplastics In A Simplified Artemia–Oreochromis Aquatic Food Chain, Dativa J. Shilla Jun 2026

Trophic Transfer Of Fluorescent Polyethylene Microplastics In A Simplified Artemia–Oreochromis Aquatic Food Chain, Dativa J. Shilla

Tanzania Journal of Science

Microplastics (MPs) are pervasive contaminants in aquatic ecosystems, yet experimental evidence of their trophic transfer within tropical African food webs remains scarce. This study provides experimental evidence of indirect trophic transfer of microplastics from Artemia salina to Oreochromis urolepis, a cichlid species of ecological and economic importance in African inland and coastal waters. A simplified two-level food chain was established by exposing A. salina nauplii to fluorescent polyethylene microplastics (10–20 µm; 1, 10, and 100 mg L⁻¹) and subsequently feeding them to juvenile O. urolepis under controlled laboratory conditions. These concentrations were selected to represent a range of exposure levels …


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou), Draft Intermediate (60%) Remedial Design Report, Blacktail Creek Riparian Actions (Dated March 13, 2026), Emma Rott Jun 2026

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou), Draft Intermediate (60%) Remedial Design Report, Blacktail Creek Riparian Actions (Dated March 13, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Effects Of Changing Fire Regimes On Black Huckleberry Habitat Suitability, Emily Labarge Jun 2026

Effects Of Changing Fire Regimes On Black Huckleberry Habitat Suitability, Emily Labarge

University Honors Theses

Black huckleberries are a significant cultural, ecological, and economic species in the Pacific Northwest. Historically, black huckleberries were tended with cultural fire by Indigenous peoples, and now also hold importance as a resource in the non-timber forest product economy. Research has begun on the impacts of climate change on suitable black huckleberry habitat and on changing fire regimes, but not in relation to each other. To address this gap, I examined the area of overlap between suitable black huckleberry habitat and fire burn probability into mid-century climate projections. I determined the current ownership entities with management jurisdiction in areas with …


Re: Approval Letter For The Quarterly Operations And Maintenance Report Grove Gulch Sedimentation Bay For Fourth Quarter 2025 Silver Bow Creek/Bute Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She (Dated May 15, 2026)., Emma Rott Jun 2026

Re: Approval Letter For The Quarterly Operations And Maintenance Report Grove Gulch Sedimentation Bay For Fourth Quarter 2025 Silver Bow Creek/Bute Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She (Dated May 15, 2026)., Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Quarterly Operations And Maintenance Report Grove Gulch Sedimentation Bay For First Quarter 2026 Silver Bow Creek/Bute Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She (Dated May 15, 2026)., Emma Rott Jun 2026

Re: Approval Letter For The Quarterly Operations And Maintenance Report Grove Gulch Sedimentation Bay For First Quarter 2026 Silver Bow Creek/Bute Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She (Dated May 15, 2026)., Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoon (Btl) System Annual Report – 2025 (Dated May 11, 2026), Emma Rott Jun 2026

Re: Comment Letter For The Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoon (Btl) System Annual Report – 2025 (Dated May 11, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Unreclaimed Sites: New And Mahoney (Ur-23) Construction Completion Report (Ccr), Molly Roby Jun 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Unreclaimed Sites: New And Mahoney (Ur-23) Construction Completion Report (Ccr), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Sister Dump (Bres No. 38) Remedial Action Work Plan (Rawp), Molly Roby Jun 2026

Re: Conditional Approval Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Sister Dump (Bres No. 38) Remedial Action Work Plan (Rawp), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Butte Reclamation Evaluation System (Bres) Site Specific Corrective Action Plans For Quadrant 2, Molly Roby Jun 2026

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Butte Reclamation Evaluation System (Bres) Site Specific Corrective Action Plans For Quadrant 2, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Reclamation Improvement Sampling: Bres No. 78 – Original Mine Yard Site Evaluation Summary Report, Molly Roby Jun 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Reclamation Improvement Sampling: Bres No. 78 – Original Mine Yard Site Evaluation Summary Report, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Construction Completion Report (Ccr), Molly Roby Jun 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Construction Completion Report (Ccr), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Draft Final Butte Mine Waste Repository Operations And Maintenance (O&M) Plan (Dated May 8, 2026), Emma Rott Jun 2026

Re: Comment Letter For The Draft Final Butte Mine Waste Repository Operations And Maintenance (O&M) Plan (Dated May 8, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Rfc - Request For Information - Waste Rock Dump Stormwater Runoff Collection System Substitution, Molly Roby Jun 2026

Rfc - Request For Information - Waste Rock Dump Stormwater Runoff Collection System Substitution, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Western Kentucky University Stormwater Utility Survey 2026, Warren Campbell Jun 2026

Western Kentucky University Stormwater Utility Survey 2026, Warren Campbell

SEAS Faculty Publications

In the U.S., more than 2200 stormwater utilities have been enacted. This year, we have expanded the survey to include stormwater utilities in other countries. Many of these stormwater assessments are called taxes, but if the assessment is recurring, is not an ad valorem tax, and is dedicated to stormwater purposes, we call it a stormwater utility. With the help of ChatGPT we have been able to identify 25 stormwater fees in Australia. We were also able to identify 3 in New Zealand, and some in Europe as well.


Draft Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase Ii Data Summary Report (Dsr), Pioneer Technical Services, Inc. Jun 2026

Draft Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase Ii Data Summary Report (Dsr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Unreclaimed Sites Sampling: Ur-27 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jun 2026

Draft Final 2022 Unreclaimed Sites Sampling: Ur-27 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Unreclaimed Sites Sampling: Ur-31 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jun 2026

Draft Final 2023 Unreclaimed Sites Sampling: Ur-31 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026, Pioneer Technical Services, Inc. Jun 2026

Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Fourth Quarter 2025, Pioneer Technical Services, Inc. Jun 2026

Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Fourth Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Bpsou Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jun 2026

Draft Final Bpsou Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jun 2026

Draft Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Unreclaimed Sites Sampling: Ur-31 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jun 2026

Draft Final 2023 Unreclaimed Sites Sampling: Ur-31 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Unreclaimed Sites Sampling: Ur-46 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jun 2026

Draft Final 2024 Unreclaimed Sites Sampling: Ur-46 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc. Jun 2026

Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Draft Final 2026 Butte Priority Soils Operable Unit (Bpsou) Type B Borrow Material Submittal #3 (Dated May 6, 2026), Molly Roby May 2026

Re: Approval Letter For The Draft Final 2026 Butte Priority Soils Operable Unit (Bpsou) Type B Borrow Material Submittal #3 (Dated May 6, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2026 Revised Draft Final Backfill And Cover Soil Quality Assurance Project Plan (Qapp) (Dated May 13, 2026), Molly Roby May 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2026 Revised Draft Final Backfill And Cover Soil Quality Assurance Project Plan (Qapp) (Dated May 13, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit (Bpsou) Draft 2025 Groundwater Monitoring Data Summary Report Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson, Pioneer Technical Services, Inc. May 2026

Re: Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit (Bpsou) Draft 2025 Groundwater Monitoring Data Summary Report Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Diggings East Final 100% Remedial Design Package Submittal, Josh Bryson May 2026

Butte Priority Soils Operable Unit Diggings East Final 100% Remedial Design Package Submittal, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Bpsou Blacktail Creek Riparian Actions Uniform Federal Policy Quality Assurance Project Plan Addendum (Dated April 24, 2026), Emma Rott May 2026

Re: Comment Letter For Bpsou Blacktail Creek Riparian Actions Uniform Federal Policy Quality Assurance Project Plan Addendum (Dated April 24, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.