Open Access. Powered by Scholars. Published by Universities.®

Groundwater

Discipline
Institution
Publication Year
Publication
Publication Type

Articles 31 - 60 of 163

Full-Text Articles in Environmental Health and Protection

Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2023, Pioneer Technical Services, Inc. Jan 2026

Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Third Quarter 2025, Pioneer Technical Services, Inc. Dec 2025

Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Third Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System - 2023 (Dated October 29, 2025), Emma Rott Dec 2025

Re: Approval Letter For The Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System - 2023 (Dated October 29, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 2 2024 (Dated August 19, 2025), Emma Rott Dec 2025

Re: Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 2 2024 (Dated August 19, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc. Dec 2025

Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 2 2025 (Dated September 30, 2025), Emma Rott Dec 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 2 2025 (Dated September 30, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2023, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan (Dated August 29, 2025), Emma Rott Oct 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan (Dated August 29, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott Oct 2025

Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Sep 2025

Re: Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2019 Surface Water, Groundwater Seep, And Soil Characterization 2021-2023 Surface Water And Groundwater Seep Evaluation 2023 Waterloo Aps Soil And Groundwater Evaluation, Woodard & Curran Sep 2025

Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2019 Surface Water, Groundwater Seep, And Soil Characterization 2021-2023 Surface Water And Groundwater Seep Evaluation 2023 Waterloo Aps Soil And Groundwater Evaluation, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc. Aug 2025

Revised Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2023, Pioneer Technical Services, Inc. Aug 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2025, Pioneer Technical Services, Inc. Jun 2025

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty, Eric Hassler Jun 2025

Re: Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty, Eric Hassler

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Educational Efficacy Of Private Well-Testing Workshops And The Surveillance Of Private Drinking Water Quality In Connecticut, Alec Janis, Michael Dietz, Meredith Metcalf Jun 2025

Educational Efficacy Of Private Well-Testing Workshops And The Surveillance Of Private Drinking Water Quality In Connecticut, Alec Janis, Michael Dietz, Meredith Metcalf

Journal of Human Sciences and Extension

More than 820,000 Connecticut residents rely on groundwater from private wells, yet minimal regulations address well water quality. Extension programs across the United States have begun to provide private drinking water education and testing assistance to address this public health gap. Few studies have analyzed the efficacy of these programs.

We delivered four workshops across Connecticut, from November 2022 to November 2023, where participants were given an educational presentation on private drinking water and an opportunity to test their well-water quality at a subsidized cost. After participating in the workshops, participants believed they were more confident to begin annual testing, …


Re: Acknowledgement Letter For The Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report (Dated February 27, 2025), Emma Rott May 2025

Re: Acknowledgement Letter For The Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report (Dated February 27, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Dated February 27, 2025), Emma Rott Apr 2025

Re: Approval Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Dated February 27, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study (Dated February 27, 2025), Emma Rott Apr 2025

Re: Approval Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study (Dated February 27, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty Mar 2025

Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final - Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase I Data Summary Report (Dsr), Pioneer Technical Services, Inc. Mar 2025

Draft Final - Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase I Data Summary Report (Dsr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc. Mar 2025

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc. Mar 2025

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan (Dated December 10, 2024), Emma Rott Feb 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan (Dated December 10, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Feb 2025

2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc. Feb 2025

2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc. Feb 2025

2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report, Josh Bryson Feb 2025

Re: Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Feb 2025

2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit Subdrain Pump Station 30% Remedial Design Package Submittal (Dated January 31, 2025), Emma Rott Feb 2025

Re: Comment Letter For Butte Priority Soils Operable Unit Subdrain Pump Station 30% Remedial Design Package Submittal (Dated January 31, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.