Open Access. Powered by Scholars. Published by Universities.®

Articles 601 - 630 of 1824

Full-Text Articles in Environmental Health and Protection

Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Dec 2024

Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Butte Area Npl Site 3rd Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She, Josh Bryson Dec 2024

Silver Bow Creek Butte Area Npl Site 3rd Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report (Dated September 16, 2024), Emma Rott Dec 2024

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report (Dated September 16, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Silver Bow Creek Butte Area Npl Site 3rd Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She, Josh Bryson Dec 2024

Re: Silver Bow Creek Butte Area Npl Site 3rd Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Insufficiently Reclaimed Sites Sampling Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report, Mike Mcanulty Dec 2024

Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Insufficiently Reclaimed Sites Sampling Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc. Dec 2024

Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Investigation Summary Report After The Bell Child Care Center, Environmental Resource Management (Erm) Dec 2024

Residential Metals Abatement Program Investigation Summary Report After The Bell Child Care Center, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty Dec 2024

Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-01, Mike Mcanulty Dec 2024

Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-01, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Insufficiently Reclaimed Sites Sampling Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc. Dec 2024

Draft Final 2022 Insufficiently Reclaimed Sites Sampling Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For Draft Final Bpsou Quarterly Operations And Maintenance Report Butte Treatment Lagoon System-Second Quarter 2024 (Dated September 27, 2024), Emma Rott Nov 2024

Comment Letter For Draft Final Bpsou Quarterly Operations And Maintenance Report Butte Treatment Lagoon System-Second Quarter 2024 (Dated September 27, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis, Pioneer Technical Services, Inc., Josh Bryson Nov 2024

Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis, Pioneer Technical Services, Inc., Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – October 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis Nov 2024

Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – October 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


October 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister Nov 2024

October 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Dated September 25, 2024), Emma Rott Nov 2024

Comment Letter For Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Dated September 25, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2023 (Dated October 15, 2024), Emma Rott Nov 2024

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2023 (Dated October 15, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit, Butte Reclamation Evaluation System Draft 2024 Field Evaluation Of Previously Reclaimed Sites Summary And Technical Recommendations Report, Butte-Silver Bow Department Of Reclamation And Environmental Services Nov 2024

Butte Priority Soils Operable Unit, Butte Reclamation Evaluation System Draft 2024 Field Evaluation Of Previously Reclaimed Sites Summary And Technical Recommendations Report, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Bpsou Draft Phase I Design Investigation Evaluation Report (Dated September 25, 2024), Emma Rott Nov 2024

Re: Comment Letter For Bpsou Draft Phase I Design Investigation Evaluation Report (Dated September 25, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For Bpsou Draft Phase I Design Investigation Evaluation Report (Dated September 25, 2024), Emma Rott Nov 2024

Comment Letter For Bpsou Draft Phase I Design Investigation Evaluation Report (Dated September 25, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Bpsou Draft Phase I Design Investigation Evaluation Report (Dated September 25, 2024), Emma Rott Nov 2024

Re: Comment Letter For Bpsou Draft Phase I Design Investigation Evaluation Report (Dated September 25, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023 (Dated October 15, 2024), Emma Rott Nov 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023 (Dated October 15, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Draft Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2019-2023 (Dated October 3, 2024), Emma Rott Nov 2024

Re: Comment Letter For Draft Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2019-2023 (Dated October 3, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Mine Flooding Site Cd, Cv 02-35 Bu-Rfc, 2024 Third Quarter Report, Mark Thompson, Dave Griffis Nov 2024

Re: Butte Mine Flooding Site Cd, Cv 02-35 Bu-Rfc, 2024 Third Quarter Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Reduction Work (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis, Julia Crain Nov 2024

Butte Reduction Work (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis, Julia Crain

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2023 Bres Fsr And Caps, Butte-Silver Bow Department Of Reclamation And Environmental Services Nov 2024

Final 2023 Bres Fsr And Caps, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) For Bres No. 120 – Bonanza Dump (Dated July 22, 2024), Molly Roby Nov 2024

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) For Bres No. 120 – Bonanza Dump (Dated July 22, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Reclaimed Areas Weed Management Plan (Dated April 11, 2024), Molly Roby Nov 2024

Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Reclaimed Areas Weed Management Plan (Dated April 11, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Hill Revegetation Specifications (Dated September 2024), Molly Roby Nov 2024

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Hill Revegetation Specifications (Dated September 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter With Comments For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) For Bres No. 181 – Mountain Con-3 Dump (Dated October 4, 2024), Molly Roby Nov 2024

Re: Approval Letter With Comments For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) For Bres No. 181 – Mountain Con-3 Dump (Dated October 4, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft 2024 Residential Metals Abatement Program Investigation Summary Report (Non-Residential – Interior Dust) After The Bell Child Care Center (Dated April 25, 2024), Molly Roby Nov 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft 2024 Residential Metals Abatement Program Investigation Summary Report (Non-Residential – Interior Dust) After The Bell Child Care Center (Dated April 25, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.