Open Access. Powered by Scholars. Published by Universities.®

Articles 571 - 600 of 1824

Full-Text Articles in Environmental Health and Protection

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Residential Metals Abatement Program Investigation Summary Report (Non‐Residential Parcels – Indoor Dust) – Cccs Gym Annex (Dated October 4, 2024), Molly Roby Jan 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Residential Metals Abatement Program Investigation Summary Report (Non‐Residential Parcels – Indoor Dust) – Cccs Gym Annex (Dated October 4, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-01, Mike Mcanulty Jan 2025

Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-01, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Exhibit 2 “Basement Iswp” 122 W. Daly St. Butte, Mt 59701 January 16, 2025 Database Residential Identifier: R-00845, Butte-Silver Bow Department Of Reclamation And Environmental Services Jan 2025

Exhibit 2 “Basement Iswp” 122 W. Daly St. Butte, Mt 59701 January 16, 2025 Database Residential Identifier: R-00845, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Nrdp Comments On Bp-Atlantic Richfield (Bp-Ar’S) Draft Materials Management Plan And Associated Documents At Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site, Jim Ford Jan 2025

Nrdp Comments On Bp-Atlantic Richfield (Bp-Ar’S) Draft Materials Management Plan And Associated Documents At Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site, Jim Ford

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis, Pioneer Technical Services, Inc. Jan 2025

Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) 2024 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson Jan 2025

Butte Priority Soils Operable Unit (Bpsou) 2024 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir-2024-Ra-01, Revision 1 (Dated December 13, 2024), Molly Roby Jan 2025

Approval Letter For Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir-2024-Ra-01, Revision 1 (Dated December 13, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Final Multi- Pathway Residential Metals Abatement Program (Rmap) Plan (Dated January 13, 2025), Molly Roby Jan 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Final Multi- Pathway Residential Metals Abatement Program (Rmap) Plan (Dated January 13, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: December 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister Jan 2025

Re: December 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Exhibit 2 “Basement Iswp” 223 N. Alabama St. Butte, Mt 59701 January 2, 2025 Database Residential Identifier: R-00455, Butte-Silver Bow Department Of Reclamation And Environmental Services Jan 2025

Exhibit 2 “Basement Iswp” 223 N. Alabama St. Butte, Mt 59701 January 2, 2025 Database Residential Identifier: R-00455, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Horseshoe Bend Effluent Line (Hbel) Discharge Structure Surface Enhancements Work Plan, Pioneer Technical Services, Inc. Jan 2025

Final Horseshoe Bend Effluent Line (Hbel) Discharge Structure Surface Enhancements Work Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jan 2025

Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Silver Bow Creek Conservation Area Repository Data Gap Data Summary Report (Dsr), Pioneer Technical Services, Inc. Jan 2025

Draft Final Silver Bow Creek Conservation Area Repository Data Gap Data Summary Report (Dsr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

This Silver Bow Creek Conservation Area (SBCCA) Repository Data Gap Data Summary Report (DSR) presents the results from the soil sampling activities conducted as specified in the SBCCA Repository Data Gap Quality Assurance Project Plan (QAPP) (referred to herein as the SBCCA Repository Data Gap QAPP; Atlantic Richfield Company, 2024). The information presented in this DSR includes laboratory analytical results from subsurface soil sampling collected from Buffalo Gulch (BG), Butte Reduction Works (BRW), Diggings East (DE), and Northside Tailings (NST) within the SBCCA. This DSR was prepared by Pioneer Technical Services, Inc. (Pioneer), 1101 S. Montana Street, Butte, Montana 59701 …


Berkeley Pit And Discharge Pilot Project Quarterly Pilot Project Report Third Quarter 2024, Atlantic Richfield Company, Mark Thompson Jan 2025

Berkeley Pit And Discharge Pilot Project Quarterly Pilot Project Report Third Quarter 2024, Atlantic Richfield Company, Mark Thompson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Final Multi-Pathway Residential Metals Abatement Program Plan, Atlantic Richfield Company, Butte Silver Bow Jan 2025

Revised Final Multi-Pathway Residential Metals Abatement Program Plan, Atlantic Richfield Company, Butte Silver Bow

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Dec 2024

Re: Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2024., Dave Griffis Dec 2024

Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2024., Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Sbcca Principles For A Greener Cleanup Report, Josh Bryson Dec 2024

Butte Priority Soils Operable Unit Sbcca Principles For A Greener Cleanup Report, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-02, Mike Mcanulty Dec 2024

Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-02, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


November 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister Dec 2024

November 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir-2024-Ra-02 (Dated December 19, 2024), Molly Roby Dec 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir-2024-Ra-02 (Dated December 19, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – November 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis Dec 2024

Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – November 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites And Insufficiently Reclaimed Areas – Racetrack Borrow Material Usage (Dated December 19, 2024), Molly Roby Dec 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites And Insufficiently Reclaimed Areas – Racetrack Borrow Material Usage (Dated December 19, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites And Insufficiently Reclaimed Areas – Racetrack Borrow Material Usage, Mike Mcanulty Dec 2024

Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites And Insufficiently Reclaimed Areas – Racetrack Borrow Material Usage, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis (Dated November 27, 2024), Emma Rott Dec 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis (Dated November 27, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Berkeley Pit Geochemical And Limnological Evaluation Pre-Design Investigation (Pdi) Work Plan, Josh Bryson Dec 2024

Berkeley Pit Geochemical And Limnological Evaluation Pre-Design Investigation (Pdi) Work Plan, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study (Dated October 10, 2024), Emma Rott Dec 2024

Re: Comment Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study (Dated October 10, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Plan (Dated October 29, 2024), Molly Roby Dec 2024

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Plan (Dated October 29, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-01, Revision 1, Mike Mcanulty Dec 2024

Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-01, Revision 1, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir-2024-Ra-01 (Dated December 3, 2024), Molly Roby Dec 2024

Re: Comment Letter For Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir-2024-Ra-01 (Dated December 3, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.