Open Access. Powered by Scholars. Published by Universities.®

Articles 481 - 510 of 1811

Full-Text Articles in Environmental Health and Protection

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2024 Corrective Action Plans (Dated January 27, 2025), Molly Roby Apr 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2024 Corrective Action Plans (Dated January 27, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Dated February 27, 2025), Emma Rott Apr 2025

Re: Approval Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Dated February 27, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study (Dated February 27, 2025), Emma Rott Apr 2025

Re: Approval Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study (Dated February 27, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Final Silver Bow Creek Conservation Area Repository Data Gap Data Summary Report (Dated April 4, 2025), Emma Rott Apr 2025

Re: Approval Letter For The Final Silver Bow Creek Conservation Area Repository Data Gap Data Summary Report (Dated April 4, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 84 – Mandan Park Site Evaluation Summary Report, Mike Mcanulty Apr 2025

Butte Priority Soils Operable Unit Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 84 – Mandan Park Site Evaluation Summary Report, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson Apr 2025

Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites (Ur-35) Remedial Action Work Plan (Rawp) (Dated June 14, 2024), Molly Roby Apr 2025

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites (Ur-35) Remedial Action Work Plan (Rawp) (Dated June 14, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2024 Field Evaluation Summary And Technical Recommendations Report (Dated November 15, 2024), Molly Roby Apr 2025

Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2024 Field Evaluation Summary And Technical Recommendations Report (Dated November 15, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Dated February 14, 2025), Molly Roby Apr 2025

Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Dated February 14, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Ur-03 Remedial Action Work Plan (Rawp) (Dated January 27, 2025)., Molly Roby Apr 2025

Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Ur-03 Remedial Action Work Plan (Rawp) (Dated January 27, 2025)., Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Blacktail Creek Pdier, Hgl Apr 2025

Blacktail Creek Pdier, Hgl

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Blacktail Creek Energy Laboratories Metals & Mercury Laboratory Analysis Results With Hgl 2b Data Validation Qualifiers, Pioneer Technical Services, Inc. Apr 2025

Blacktail Creek Energy Laboratories Metals & Mercury Laboratory Analysis Results With Hgl 2b Data Validation Qualifiers, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Unreclaimed Sites Sampling: Ur-06 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Apr 2025

Draft Final 2022 Unreclaimed Sites Sampling: Ur-06 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Bpsou Subdrain Data Summary Report (Dsr), Pioneer Technical Services, Inc. Apr 2025

Draft Final 2024 Bpsou Subdrain Data Summary Report (Dsr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Unreclaimed Sites Sampling: Ur-12 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Apr 2025

Draft Final 2022 Unreclaimed Sites Sampling: Ur-12 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Bpsou Insufficiently Reclaimed Sites Bres No. 158 - Waste Rock Dump Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Mar 2025

Draft Final Bpsou Insufficiently Reclaimed Sites Bres No. 158 - Waste Rock Dump Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty Mar 2025

Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit Berkeley Pit Geochemical And Limnological Evaluation Pre-Design Investigation (Pdi) Work Plan (Dated December 17, 2024), Emma Rott Mar 2025

Re: Comment Letter For Butte Priority Soils Operable Unit Berkeley Pit Geochemical And Limnological Evaluation Pre-Design Investigation (Pdi) Work Plan (Dated December 17, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


February 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister Mar 2025

February 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


February 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister Mar 2025

February 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Rmap Non-Residential Parcels Data Summary Report Silver Bow Creek/Butte Area Npl Site Bpsou, Environmental Standards, Inc., Pioneer Technical Services, Inc. Mar 2025

2024 Rmap Non-Residential Parcels Data Summary Report Silver Bow Creek/Butte Area Npl Site Bpsou, Environmental Standards, Inc., Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoons (Btl) System – Third Quarter 2024 (Dated December 23, 2024), Emma Rott Mar 2025

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoons (Btl) System – Third Quarter 2024 (Dated December 23, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Technical Memorandum - Re: 2022 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation, Paddy Stoy Mar 2025

Technical Memorandum - Re: 2022 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation, Paddy Stoy

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Technical Memorandum - Re: 2022 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation, Paddy Stoy Mar 2025

Technical Memorandum - Re: 2022 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation, Paddy Stoy

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final - Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase I Data Summary Report (Dsr), Pioneer Technical Services, Inc. Mar 2025

Draft Final - Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase I Data Summary Report (Dsr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Mar 2025

Draft Final 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Unreclaimed Sites Sampling: Ur-22 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Mar 2025

Draft Final 2022 Unreclaimed Sites Sampling: Ur-22 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Final - Multi-Pathway Residential Metals Abatement Program Plan, Butte-Silver Bow Department Of Reclamation And Environmental Services, Atlantic Richfield Company Mar 2025

Revised Final - Multi-Pathway Residential Metals Abatement Program Plan, Butte-Silver Bow Department Of Reclamation And Environmental Services, Atlantic Richfield Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Final Multi-Pathway Residential Metals Abatement Program Plan, Atlantic Richfield Company, Butte Silver Bow Mar 2025

Revised Final Multi-Pathway Residential Metals Abatement Program Plan, Atlantic Richfield Company, Butte Silver Bow

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc. Mar 2025

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.