Open Access. Powered by Scholars. Published by Universities.®

Environmental Indicators and Impact Assessment

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 481 - 510 of 2524

Full-Text Articles in Environmental Health and Protection

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2025 Residential Metals Abatement Program (Rmap) Rock Creek Cattle Company Borrow Submittal #1 (Dated May 23, 2025), Molly Roby Jun 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2025 Residential Metals Abatement Program (Rmap) Rock Creek Cattle Company Borrow Submittal #1 (Dated May 23, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2024 Field Evaluation Summary And Technical Recommendations Report (Dated April 10, 2025), Abby Peltomaa Jun 2025

Response To Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2024 Field Evaluation Summary And Technical Recommendations Report (Dated April 10, 2025), Abby Peltomaa

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter With Comment For The Butte Priority Soils Operable Unit (Bpsou) 2025 Revised Draft Final Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp) (Dated June 2, 2025), Molly Roby Jun 2025

Re: Approval Letter With Comment For The Butte Priority Soils Operable Unit (Bpsou) 2025 Revised Draft Final Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp) (Dated June 2, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jun 2025

Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Bpsou Unreclaimed Sites: Ur-05 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jun 2025

Revised Draft Final Bpsou Unreclaimed Sites: Ur-05 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase I Data Summary Report (Dsr), Pioneer Technical Services, Inc. Jun 2025

Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase I Data Summary Report (Dsr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Bpsou Unreclaimed Sites: Ur-05 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jun 2025

Final Bpsou Unreclaimed Sites: Ur-05 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


On-Site Water Management Field Sampling Plan (Fsp), 2025 Update, Mark Thompson, Rampart Solutions Jun 2025

On-Site Water Management Field Sampling Plan (Fsp), 2025 Update, Mark Thompson, Rampart Solutions

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jun 2025

Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2025 Revised Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. May 2025

2025 Revised Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Residential Metals Abatement Program (Rmap): Walkerville Park (Walkerville Drive & Ryan Road) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc. May 2025

Draft Final 2024 Residential Metals Abatement Program (Rmap): Walkerville Park (Walkerville Drive & Ryan Road) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Multi-Pathway Residential Metals Abatement Program (Rmap) Plan (Dated March 27, 2025), Molly Roby May 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Multi-Pathway Residential Metals Abatement Program (Rmap) Plan (Dated March 27, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2025 Residential Metals Abatement Program (Rmap) Rock Creek Cattle Company Borrow Submittal #1, Pioneer Technical Services, Inc. May 2025

Draft Final 2025 Residential Metals Abatement Program (Rmap) Rock Creek Cattle Company Borrow Submittal #1, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Ur-05 Remedial Action Work Plan (Rawp) (Dated March 14, 2025), Molly Roby May 2025

Re: Comment Letter For Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Ur-05 Remedial Action Work Plan (Rawp) (Dated March 14, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Bres No. 158 Site Evaluation Summary Report (Dated February 24, 2025), Molly Roby May 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Bres No. 158 Site Evaluation Summary Report (Dated February 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 158 – Waste Rock Dump Remedial Action Work Plan (Rawp) (Dated March 28, 2025), Molly Roby May 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 158 – Waste Rock Dump Remedial Action Work Plan (Rawp) (Dated March 28, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Enhancing Water Supply Resilience & Sustainability: Potential Solutions To Address Water Scarcity In Bogotá, Colombia, Sophia Alvarez Wong May 2025

Enhancing Water Supply Resilience & Sustainability: Potential Solutions To Address Water Scarcity In Bogotá, Colombia, Sophia Alvarez Wong

Master's Projects and Capstones

Municipal water utilities are in urgent need of adapting to the intensifying impacts of climate change and population growth—key drivers of urban water scarcity worldwide. In rapidly expanding cities like Bogota, Colombia, these pressures have contributed to a severe water crisis driven by prolonged droughts, ecosystem degradation, increasing water demands, and overdependence on limited water sources. This study explores potential adaptation and management strategies that utilities can implement to sustainably strengthen supply system resilience and enhance water security, in the context of low- to middle-income regions. A series of comparative and case study analyses were conducted to assess the feasibility …


Butte Priority Soils Operable Unit (Bpsou)2020 Consent Decree Appendix D Attachment C Sections 7 And 8 Discrepancies, Mike Mcanulty May 2025

Butte Priority Soils Operable Unit (Bpsou)2020 Consent Decree Appendix D Attachment C Sections 7 And 8 Discrepancies, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Draft Final Bpsou Unreclaimed Site Anderson Shaft Remedial Action Work Plan (Rawp) (Dated June 14, 2024), Molly Roby May 2025

Re: Comment Letter For Draft Final Bpsou Unreclaimed Site Anderson Shaft Remedial Action Work Plan (Rawp) (Dated June 14, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Principles For A Greener Cleanup Report (Dated December 23, 2024), Emma Rott May 2025

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Principles For A Greener Cleanup Report (Dated December 23, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2025 Revised Draft Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. May 2025

2025 Revised Draft Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels) (Dated February 26, 2025), Molly Roby May 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels) (Dated February 26, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2025 Residential Metals Abatement Program (Rmap) Non-Residential Daycare Soil Sampling: Field Sampling Plan (Fsp) Submittal #15 [Mini Scholars Discovery Academy, Hands On Learning Childcare, Kidz Konnection, Young Explorers, & University On Princeton], Pioneer Technical Services, Inc. May 2025

Draft Final 2025 Residential Metals Abatement Program (Rmap) Non-Residential Daycare Soil Sampling: Field Sampling Plan (Fsp) Submittal #15 [Mini Scholars Discovery Academy, Hands On Learning Childcare, Kidz Konnection, Young Explorers, & University On Princeton], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Prevalence Of Well Water Contaminants In Georgia From 2010-2022, Angelique B. Willis, Suhasini Ramisetty-Mikler, Christine E. Stauber, Uttam Kumar Saha May 2025

Prevalence Of Well Water Contaminants In Georgia From 2010-2022, Angelique B. Willis, Suhasini Ramisetty-Mikler, Christine E. Stauber, Uttam Kumar Saha

Journal of the Georgia Public Health Association

Background: Safe, reliable, and clean drinking water sources are a basic necessity. More than 1.7 million individuals rely on private wells for drinking water in Georgia and are confronted with water quality challenges stemming from chemical contamination as private wells are not under mandated regulations as public water supplies. In Georgia, previous studies suggested that the variation of soil and rock in a physiographic province (region) plays an essential role in the quality of private well water. There is a need to understand the distribution of these chemical contaminants above the federal Maximum Contaminant Level (MCL) and how different geologies …


Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson May 2025

Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Monitoring Mangrove Dynamics And Evaluating Future Afforestation Potential In The Egyptian Red Sea, Rasha M. Abou Samra, Mansour Almazroui, Wenzhao Li, Hesham El-Askary May 2025

Monitoring Mangrove Dynamics And Evaluating Future Afforestation Potential In The Egyptian Red Sea, Rasha M. Abou Samra, Mansour Almazroui, Wenzhao Li, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

Mangrove forests are vital for ecosystem services and coastal management but face stressors from anthropogenic activities and climate change. This study estimates the extent and afforestation potential of mangroves along the Egyptian Red Sea coast from 1984 to 2022 using NDVI derived from Landsat-5 and Sentinel-2 data in Google Earth Engine. Aboveground biomass (AGB), belowground biomass (BGB), carbon (C) stock, and CO2 sequestration potential were evaluated using Sentinel-2 and elevation data. Future afforestation suitability (2020–2050) under SSP2-4.5 and SSP5-8.5 scenarios was assessed with the MaxEnt model. Mangrove area increased from 0.95 km2 in 1984 to 1.46 km2 …


Re: Comment Letter For The 2022 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation (Dated March 10, 2025), Emma Rott May 2025

Re: Comment Letter For The 2022 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation (Dated March 10, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The 2023 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation (Dated March 10, 2025), Emma Rott May 2025

Re: Comment Letter For The 2023 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation (Dated March 10, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Acknowledgement Letter For The Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report (Dated February 27, 2025), Emma Rott May 2025

Re: Acknowledgement Letter For The Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report (Dated February 27, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Non-Residential Parcels And Residential Daycares) (Dated February 26, 2025), Molly Roby May 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Non-Residential Parcels And Residential Daycares) (Dated February 26, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.