Open Access. Powered by Scholars. Published by Universities.®
Environmental Health and Protection Commons™
Open Access. Powered by Scholars. Published by Universities.®
- Institution
-
- Montana Tech Library (1807)
- Chapman University (86)
- University of Nevada, Las Vegas (83)
- University of Nebraska - Lincoln (48)
- University of Louisville (43)
-
- SIT Graduate Institute/SIT Study Abroad (39)
- Department of Primary Industries and Regional Development, Western Australia (31)
- University of Southern Maine (28)
- Eastern Kentucky University (26)
- Portland State University (19)
- Bemidji State University (10)
- Colby College (10)
- University of Dayton (10)
- California Polytechnic State University, San Luis Obispo (9)
- Claremont Colleges (9)
- The University of San Francisco (9)
- University of Arkansas, Fayetteville (9)
- University of New England (9)
- City University of New York (CUNY) (8)
- Montclair State University (8)
- World Maritime University (8)
- Western Kentucky University (7)
- Augustana College (6)
- Center for the Blue Economy (6)
- Technological University Dublin (6)
- DePaul University (5)
- Murray State University (5)
- Nova Southeastern University (5)
- University of Connecticut (5)
- University of Kentucky (5)
- Keyword
-
- Priority Soils (389)
- Metals Abatement (228)
- Unreclaimed Sites (146)
- Field Sampling (135)
- Consent Decree (124)
-
- Quality Assurance (123)
- Groundwater (104)
- Insufficiently Reclaimed Sites (101)
- Indoor Dust (74)
- Berkeley Pit (67)
- Soil Sampling (62)
- Butte Treatment Lagoon (57)
- Lead (57)
- Water quality (56)
- Environment (55)
- Stormwater (54)
- Groundwater Monitoring (52)
- Smelter Area (52)
- Blacktail Creek (49)
- Maintenance (48)
- Arsenic (47)
- Surface Water Monitoring (47)
- Mercury (43)
- Monitoring (41)
- Envirome (40)
- Maintenance Report (40)
- Silver Bow Creek (40)
- Sustain (40)
- Butte Reduction Works (39)
- Residential Metals Abatement (39)
- Publication Year
- Publication
-
- Silver Bow Creek/Butte Area Superfund Site (1807)
- Publications (WR) (51)
- Mathematics, Physics, and Computer Science Faculty Articles and Research (41)
- Sustain Magazine (41)
- Independent Study Project (ISP) Collection (35)
-
- Biology, Chemistry, and Environmental Sciences Faculty Articles and Research (29)
- EKU Faculty and Staff Scholarship (26)
- Nebraska Department of Environmental Quality: Reports (16)
- Department of Environmental Studies: Undergraduate Student Theses (12)
- Environmental Studies Faculty Publications (11)
- Biosecurity factsheets (10)
- UNLV Theses, Dissertations, Professional Papers, and Capstones (10)
- Electronic Theses and Dissertations (9)
- Physics Faculty Publications (9)
- Institute for ECHO Articles and Research (8)
- Maritime Safety & Environment Management Dissertations (Dalian) (8)
- Planning (8)
- Department of Earth and Environmental Studies Faculty Scholarship and Creative Works (7)
- Environmental Science and Management Professional Master's Project Reports (7)
- Pomona Senior Theses (7)
- Articles (6)
- Environmental Science and Management Faculty Publications and Presentations (6)
- Journal of Earth and Life Science (6)
- Maine Collection (6)
- Master's Projects and Capstones (6)
- National Invasive Species Council (6)
- Fisheries Occasional Publications (5)
- Graduate Theses and Dissertations (5)
- Honors Theses (5)
- Marine Affairs Theses and Major Papers (5)
- Publication Type
- File Type
Articles 481 - 510 of 2524
Full-Text Articles in Environmental Health and Protection
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2025 Residential Metals Abatement Program (Rmap) Rock Creek Cattle Company Borrow Submittal #1 (Dated May 23, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Response To Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2024 Field Evaluation Summary And Technical Recommendations Report (Dated April 10, 2025), Abby Peltomaa
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter With Comment For The Butte Priority Soils Operable Unit (Bpsou) 2025 Revised Draft Final Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp) (Dated June 2, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Bpsou Unreclaimed Sites: Ur-05 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Revised Draft Final Bpsou Unreclaimed Sites: Ur-05 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase I Data Summary Report (Dsr), Pioneer Technical Services, Inc.
Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase I Data Summary Report (Dsr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Bpsou Unreclaimed Sites: Ur-05 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Final Bpsou Unreclaimed Sites: Ur-05 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
On-Site Water Management Field Sampling Plan (Fsp), 2025 Update, Mark Thompson, Rampart Solutions
On-Site Water Management Field Sampling Plan (Fsp), 2025 Update, Mark Thompson, Rampart Solutions
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2025 Revised Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2025 Revised Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2024 Residential Metals Abatement Program (Rmap): Walkerville Park (Walkerville Drive & Ryan Road) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.
Draft Final 2024 Residential Metals Abatement Program (Rmap): Walkerville Park (Walkerville Drive & Ryan Road) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Multi-Pathway Residential Metals Abatement Program (Rmap) Plan (Dated March 27, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2025 Residential Metals Abatement Program (Rmap) Rock Creek Cattle Company Borrow Submittal #1, Pioneer Technical Services, Inc.
Draft Final 2025 Residential Metals Abatement Program (Rmap) Rock Creek Cattle Company Borrow Submittal #1, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Ur-05 Remedial Action Work Plan (Rawp) (Dated March 14, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Bres No. 158 Site Evaluation Summary Report (Dated February 24, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 158 – Waste Rock Dump Remedial Action Work Plan (Rawp) (Dated March 28, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Enhancing Water Supply Resilience & Sustainability: Potential Solutions To Address Water Scarcity In Bogotá, Colombia, Sophia Alvarez Wong
Enhancing Water Supply Resilience & Sustainability: Potential Solutions To Address Water Scarcity In Bogotá, Colombia, Sophia Alvarez Wong
Master's Projects and Capstones
Municipal water utilities are in urgent need of adapting to the intensifying impacts of climate change and population growth—key drivers of urban water scarcity worldwide. In rapidly expanding cities like Bogota, Colombia, these pressures have contributed to a severe water crisis driven by prolonged droughts, ecosystem degradation, increasing water demands, and overdependence on limited water sources. This study explores potential adaptation and management strategies that utilities can implement to sustainably strengthen supply system resilience and enhance water security, in the context of low- to middle-income regions. A series of comparative and case study analyses were conducted to assess the feasibility …
Butte Priority Soils Operable Unit (Bpsou)2020 Consent Decree Appendix D Attachment C Sections 7 And 8 Discrepancies, Mike Mcanulty
Butte Priority Soils Operable Unit (Bpsou)2020 Consent Decree Appendix D Attachment C Sections 7 And 8 Discrepancies, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For Draft Final Bpsou Unreclaimed Site Anderson Shaft Remedial Action Work Plan (Rawp) (Dated June 14, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Principles For A Greener Cleanup Report (Dated December 23, 2024), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2025 Revised Draft Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2025 Revised Draft Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels) (Dated February 26, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2025 Residential Metals Abatement Program (Rmap) Non-Residential Daycare Soil Sampling: Field Sampling Plan (Fsp) Submittal #15 [Mini Scholars Discovery Academy, Hands On Learning Childcare, Kidz Konnection, Young Explorers, & University On Princeton], Pioneer Technical Services, Inc.
Draft Final 2025 Residential Metals Abatement Program (Rmap) Non-Residential Daycare Soil Sampling: Field Sampling Plan (Fsp) Submittal #15 [Mini Scholars Discovery Academy, Hands On Learning Childcare, Kidz Konnection, Young Explorers, & University On Princeton], Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Prevalence Of Well Water Contaminants In Georgia From 2010-2022, Angelique B. Willis, Suhasini Ramisetty-Mikler, Christine E. Stauber, Uttam Kumar Saha
Prevalence Of Well Water Contaminants In Georgia From 2010-2022, Angelique B. Willis, Suhasini Ramisetty-Mikler, Christine E. Stauber, Uttam Kumar Saha
Journal of the Georgia Public Health Association
Background: Safe, reliable, and clean drinking water sources are a basic necessity. More than 1.7 million individuals rely on private wells for drinking water in Georgia and are confronted with water quality challenges stemming from chemical contamination as private wells are not under mandated regulations as public water supplies. In Georgia, previous studies suggested that the variation of soil and rock in a physiographic province (region) plays an essential role in the quality of private well water. There is a need to understand the distribution of these chemical contaminants above the federal Maximum Contaminant Level (MCL) and how different geologies …
Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Monitoring Mangrove Dynamics And Evaluating Future Afforestation Potential In The Egyptian Red Sea, Rasha M. Abou Samra, Mansour Almazroui, Wenzhao Li, Hesham El-Askary
Monitoring Mangrove Dynamics And Evaluating Future Afforestation Potential In The Egyptian Red Sea, Rasha M. Abou Samra, Mansour Almazroui, Wenzhao Li, Hesham El-Askary
Mathematics, Physics, and Computer Science Faculty Articles and Research
Mangrove forests are vital for ecosystem services and coastal management but face stressors from anthropogenic activities and climate change. This study estimates the extent and afforestation potential of mangroves along the Egyptian Red Sea coast from 1984 to 2022 using NDVI derived from Landsat-5 and Sentinel-2 data in Google Earth Engine. Aboveground biomass (AGB), belowground biomass (BGB), carbon (C) stock, and CO2 sequestration potential were evaluated using Sentinel-2 and elevation data. Future afforestation suitability (2020–2050) under SSP2-4.5 and SSP5-8.5 scenarios was assessed with the MaxEnt model. Mangrove area increased from 0.95 km2 in 1984 to 1.46 km2 …
Re: Comment Letter For The 2022 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation (Dated March 10, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The 2023 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation (Dated March 10, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Acknowledgement Letter For The Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report (Dated February 27, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Non-Residential Parcels And Residential Daycares) (Dated February 26, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.