Open Access. Powered by Scholars. Published by Universities.®
Articles 1 - 30 of 78
Full-Text Articles in Other Engineering
Fire Protection And Life Safety Analysis Report, Ayoung Yun
Fire Protection And Life Safety Analysis Report, Ayoung Yun
Fire Protection Engineering: Culminating Experience Project Reports
This report evaluates the fire and life safety performance of the proposed building, a two- story, mixed-occupancy facility designed to serve as a civic and cultural hub. The analysis was prepared to assess compliance with the 2021 International Building Code (IBC), NFPA 13, NFPA 72, and related standards, with a particular focus on areas where occupant egress paths challenge prescriptive limitations. The project includes assembly, business, and storage occupancies, and features a large auditorium, classrooms, an exhibition hall, a restaurant, offices, and a double-height atrium. The building is designed as a non-separated mixed-use facility and is classified under Groups A-1, …
Ymca Building, Tomas Lins
Ymca Building, Tomas Lins
Fire Protection Engineering: Culminating Experience Project Reports
This project consists of the prescriptive and performance-based analysis of the fire protection and life safety features of the YMCA building in the city of Grants Pass, OR. The building was opened to the public in 1983 and was expanded in 2003. The initial construction is classified as Type IV and is not protected by a sprinkler system. The expanded section has a construction classification of Type II-B and is fully sprinklered. The main occupancies found in the building are Groups A and B. The building includes daycare room classified as Group E. The four core areas of prescriptive analysis …
Genesis Station Fire Protection And Life Safety Analysis, Mark Anthony Bautista
Genesis Station Fire Protection And Life Safety Analysis, Mark Anthony Bautista
Fire Protection Engineering: Culminating Experience Project Reports
This fire protection and life safety analysis evaluates GENESIS Station, a nine-story Type I-B mixed-tenant building located in Daly City, California. The facility includes business, research laboratory, and assembly occupancies. A combination of prescriptive code compliance and performance-based analysis was applied to assess the building’s overall fire safety strategy.
The building utilizes a layered fire protection strategy that combines passive fire resistive construction with active systems. Fire rated construction separate tenant suites, limiting the spread of fire and smoke, defining hazardous materials control areas, and ensuring compliant separation of egress paths.
Active fire protection systems include a fully automatic sprinkler …
Fire Protection And Life Safety Analysis Of The Carlsbad Village Lofts, Nathaniel Cheung
Fire Protection And Life Safety Analysis Of The Carlsbad Village Lofts, Nathaniel Cheung
Fire Protection Engineering: Culminating Experience Project Reports
This culminating project has been submitted as part of the graduate program in Fire Protection Engineering at Cal Poly. The building is a 221,000 square feet mixed-use residential apartment building comprising of 106 units. The report is split into two sections. The prescriptive based analysis considers the building’s compliance with the requirements found in the 2016 California Building and Fire Codes. The performance based section evaluated design fires to verify that the final building design and operating procedures met the life safety needs of its occupants.
The prescriptive based analysis was split into four main parts. The four parts were …
Fire Protection And Life Safety Analysis Report California State University Of Dominguez Hills, Jung Sub Kim
Fire Protection And Life Safety Analysis Report California State University Of Dominguez Hills, Jung Sub Kim
Fire Protection Engineering: Culminating Experience Project Reports
This report provides detailed fire and life safety analysis of the California State University of Dominguez Hills, Innovation and Instruction Building. The building is 4 stories high, accommodating an auditorium, classrooms, labs, and office spaces. Type of construction for the building is II-A. The building will have an aggregate floor area of 83,539 square feet of across four floors.
First half of the report includes prescriptive fire and life safety analysis conducted in accordance with 2021 Edition International Building Code and the applicable Standards, such as National Fire Protection Association (NFPA) 13, Standard for the Installation of Sprinkler Systems, 2022 …
Project Buildings, Anthony Pamintuan
Project Buildings, Anthony Pamintuan
Fire Protection Engineering: Culminating Experience Project Reports
This report analyzes the prescriptive based design of a government-use high-rise building whose primary use is a business office building in California utilizing the California Building Code 2022 Edition. For security purposes, the name of the project will be the “Project Building.” The project site consists of a common podium underground parking garage with two high-rise buildings and an auditorium built on the parking garage. The project buildings that were analyzed consisted of the underground parking garage, the auditorium, and one of the high-rise buildings.
The parking garage is approximately 135,000 square feet consisting of mixed occupancies throughout. The mixed …
Fire & Life Safety Evaluation Of The Goff Health Sciences And Technology Building, Philip Bond
Fire & Life Safety Evaluation Of The Goff Health Sciences And Technology Building, Philip Bond
Fire Protection Engineering: Culminating Experience Project Reports
The purpose of this report is to practically apply the information conveyed in the Cal Poly Fire Protection Engineering Master of Science program by selecting a building and analyzing prescriptive and performance-based design features that accomplish the building’s life safety strategy. The selected building is the Goff Health Sciences and Technology Building located in Oak Ridge, Tennessee.
The Goff Health Sciences and Technology Building is a three-story educational facility with business, education, and assembly occupancies. The fire safety strategy of the building depends on a fire alarm communication system, wet pipe sprinkler system, structural fire protection components, and egress elements …
Community Multipurpose Center, Cristian Cohen
Community Multipurpose Center, Cristian Cohen
Fire Protection Engineering: Culminating Experience Project Reports
This report is an analysis of fire protection and life safety features required for a Community Multipurpose Center (CMC).
Governing the construction of the building was the International Building Code (IBC). Throughout this report there are justifications for a call to redesign the CMC conceptual drawing.
The fire and life safety features were organized into five areas, otherwise known as the FPE core areas.
The first four core areas consist of (1) Structural Fire Protection, (2) Water-Based Fire Control and Suppression Systems, (3) Detection, Alarm and Notification Systems, and (4) Means of Egress System. These come straight out of codes …
Training Facility, Andrew Kuharski
Training Facility, Andrew Kuharski
Fire Protection Engineering: Culminating Experience Project Reports
The Training Facility is a two-story, 142,500 sq. ft. building constructed in 1994 at the Savannah River Site DOE complex. The facility primarily contains training rooms, office space, and a cafeteria. Fire protection features of the Training Facility are detailed in this report, including key life safety, suppression, alarm, and structural features. The building has several deficiencies; the second floor has an occupant load of 911 occupants but is only provided with an exit capacity of 800, and occupancy size per floor exceeds what is allowed for assembly occupancies on the first floor. The travel distance from the records storage …
Building San Francisco, Ca, Kevin Nguyen
Building San Francisco, Ca, Kevin Nguyen
Fire Protection Engineering: Culminating Experience Project Reports
The objective of this report is to conduct a thorough analysis and evaluation of the existing fire life safety and fire protection systems in place at the Building located in San Francisco, California. The building is classified as a Type II-A building and serves predominantly as office space. The building is six stories tall with a total gross area of approximately 97,170 SF.
The initial portion of this report concentrates on a thorough prescriptive-based analysis, which provides an evaluation of the egress design, fire alarm system, communication systems, fire suppression system, structural and construction design, smoke control, and flammability requirements. …
University Of Washington Bill & Melinda Gates Center For Computer Science & Engineering, Devin Ide
University Of Washington Bill & Melinda Gates Center For Computer Science & Engineering, Devin Ide
Fire Protection Engineering: Culminating Experience Project Reports
The purpose of this report is to analyze and evaluate the prescriptive and performance-based criteria used to design the fire protection systems installed in the Gates Center for Computer Science and Engineering at the University of Washington, Seattle Campus. The Gates Center is a five-story building housing business and assembly spaces such as classrooms, workrooms, offices, a lecture hall, event center, and a café. The main architectural feature is a central atrium, which connects the ground, first, second, and third floors of the building.
Aspects of the prescriptive-based fire protection design include egress, automatic sprinkler systems, detection and notification devices, …
A Fire Protection And Life Safety Analysis Of An Oupatient Healthcare System Building, Conrad Chandler
A Fire Protection And Life Safety Analysis Of An Oupatient Healthcare System Building, Conrad Chandler
Fire Protection Engineering: Culminating Experience Project Reports
The subject building of the report is an outpatient healthcare system building that is a two stories in height and 184,670 SF building. This building offers primary, specialty, and mental health outpatient care to patients throughout its state of location.
The facility is a mixed occupancy building with business as the primary occupancy, a surgery suite that classifies as an ambulatory health care occupancy, and assembly uses in the conference rooms, kitchen, and canteen. The Authority Having Jurisdiction (AHJ) has adopted the National Fire Codes (NFC) published by the National Fire Protection Association (NFPA), and throughout this report, the life …
Design Fire Robert E. Kennedy Library, California Polytechnic State, San Luis Obispo, Jennifer Ocampo
Design Fire Robert E. Kennedy Library, California Polytechnic State, San Luis Obispo, Jennifer Ocampo
Fire Protection Engineering: Culminating Experience Project Reports
This report evaluates the fire protection system of the Kennedy Building using a prescriptive approach and a performance-based design. The prescriptive approach evaluates code compliance of the structural design, fire suppression system, alarm and detection and smoke control. The performance-based design evaluates egress and life safety protection and three design fires that could potentially compromise the goals and objectives of the design.
The Kennedy Building is on the Campus of Cal Poly, San Luis Obispo and serves as the primary library of the university. This building has five stories of mixed occupancies. It is partially sprinklered, has limited automatic detection …
Food Processing And Campus Market (Building 24), Ian De Vries
Food Processing And Campus Market (Building 24), Ian De Vries
Fire Protection Engineering: Culminating Experience Project Reports
This report provides a prescriptive and performance-based analysis of the Food Processing Building located on Cal Poly’s campus in San Luis Obispo, California. Food science and nutrition classes take place at the facility where faculty and students manufacture food products such as chocolates, jams, and barbecue sauces. The finished products are offered for sale in the building’s mercantile area, known as the Campus Market, in addition to other retail locations around the city. The Food Processing Building is considered mixed use with portions of the building classified as moderate-hazard factory (F-1), moderate-hazard storage (S-1), business (B), mercantile (M), and assembly …
Process Support Building Savannah River Site, Victoria Zawacki
Process Support Building Savannah River Site, Victoria Zawacki
Fire Protection Engineering: Culminating Experience Project Reports
A report on the fire and life safety analysis of the Savannah River Site Process Support Building is required in order to receive a Master of Science in Fire Protection Engineering from the California Polytechnic State University, San Luis Obispo. The Process Support Building is a two-story office building that was first occupied in 2013, with a floor area of approximately 10,000 ft2. The building contains mainly personal offices, but also contains conference and turnover rooms, a Computer Simulation Room, an Observation Room, and a lunch area. The analysis includes both prescriptive and performance-based analysis.
The Process Support Building is …
Prescriptive And Performance-Based Analysis Of Colorado Liberal Arts College, Victor Wight
Prescriptive And Performance-Based Analysis Of Colorado Liberal Arts College, Victor Wight
Fire Protection Engineering: Culminating Experience Project Reports
This project consists of a prescriptive and performance-based analysis of an existing two-story college building. The building is located in downtown Colorado Springs, Colorado. Colorado Liberal Arts College is used for general education courses with the focus on creative fields such as dance, graphic design, and art. The building consists of classrooms, offices, an art gallery, dance studio, and a bookstore.
A prescriptive based design was completed using the code requirements laid out in the International Building Code (IBC) 2015 Edition and applicable National Fire Protection Association (NFPA) Codes. The prescriptive based analysis consisted of analyzing life safety and egress, …
Grange Insurance Audubon Center-Fire Protection Life Safety Report, Gabriel Levy
Grange Insurance Audubon Center-Fire Protection Life Safety Report, Gabriel Levy
Fire Protection Engineering: Culminating Experience Project Reports
This technical approach narrative presents the intent and methodology of the Fire Protection and Life Safety systems for the Grange Insurance Audubon Center located at 505 W Whittier St. Columbus OH 43215. The primary goal of the structure is to provide life and property protection in a fire scenario while taking into account the costs of implementing the criterion and risks associated with the facility. This will be achieved through the appropriate application of requirements listed in the 2015 International Building Code (IBC) and the International Fire Code (IFC) as adopted by the City of Columbus, Ohio, and any reference …
Jack E Brown Chemical Engineering Building At Texas A&M University, Daniel Higdon
Jack E Brown Chemical Engineering Building At Texas A&M University, Daniel Higdon
Fire Protection Engineering: Culminating Experience Project Reports
The Jack E Brown Chemical Engineering building at Texas A&M is located in College Station, TX. While this building is dedicated to chemical engineering, it serves many different departments as they use the lecture halls on the first floor. It was built and opened in 2004 and has 206,500 square feet with 7 stories. The building consists of multiple labs as well as study hall rooms, computer labs, offices, and the normal MEP/storage rooms. Jack E Brown building is one of the foremost buildings of the Texas A&M engineering quadrant and is further proof that Texas A&M desires to keep …
Fire Safety Management Plan For South Texas Project Turbine Generator Building, Brett Long
Fire Safety Management Plan For South Texas Project Turbine Generator Building, Brett Long
Fire Protection Engineering: Culminating Experience Project Reports
This report includes a fire protection and life safety analysis of the South Texas Project Turbine Generator Building (TGB). This analysis was done to fulfill the requirement for the Master of Science Degree in Fire Protection Engineering from California Polytechnic State University. The Turbine Generator Building consists of three elevations and is Type II-B construction. The TGB’s primary use is a special-purpose industrial building housing the turbine generator, main feed pumps, condensate pumps, condenser, feed water re-heaters, secondary cold chemistry lab, Balance-of-Plant (BOP) diesel, batteries, and switchgear, 13.8 kVA switchgear, and various other systems and components. This analysis consists of …
Fire Protection And Life Safety Analysis Of The Adult Education Facility, William K.W. Bridges
Fire Protection And Life Safety Analysis Of The Adult Education Facility, William K.W. Bridges
Fire Protection Engineering: Culminating Experience Project Reports
The objective of this report is to provide an analysis of an existing building’s prescriptive-based and performance-based design methods. The intention is to provide the building owner with a working assessment of the building’s current life safety situation, as well as providing recommendations to improve the overall life safety and property protection of the selected building. This report is developed following the writing style and structure to meet the requirement for the Master of Science Degree in Fire Protection Engineering from California Polytechnic State University. The analysis includes an evaluation of the building owner’s fire and safety program for the …
Fire Protection And Life Safety Analysis Of Christopher Cohan Center, Kristen Dentici
Fire Protection And Life Safety Analysis Of Christopher Cohan Center, Kristen Dentici
Fire Protection Engineering: Culminating Experience Project Reports
This report analyzes the fire protection and life safety systems of the Christopher Cohan Center. The building was assessed from both a prescriptive and performance-based approach.
The prescriptive design analyzed the code requirements for the building based on the 2018 IBC, with some consideration for the codes in place at the time of construction. The prescriptive analysis main focus was on egress systems, fire alarm and detection, fire suppression, and structural fire protection. The egress analysis found that the exits and exit configuration were sufficient for the occupant loads that were calculated for the building. The fire alarm and detection …
Fire Protection Analysis For The Tritium Engineering Building, Jack Smeck
Fire Protection Analysis For The Tritium Engineering Building, Jack Smeck
Fire Protection Engineering: Culminating Experience Project Reports
This report analyzed several different aspects of the fire protection and life safety strategy for the Tritium Engineering Building (TEB) at the Savannah River Site in Aiken, SC. The TEB is a single-story, Type IIB building that primarily houses engineering and technical staff. The building is approximately 15,560 ft2 and consists of two large “open areas” enclosed by hard- wall offices. Modular workstations are located in both “open areas” and accommodate the majority of the building occupants. This analysis provided both a prescriptive and a performance-based approach for analyzing fire hazards within the building. The prescriptive- based analysis evaluated the …
College Sports Center Fire Protection Analysis, Elijah Kimmig
College Sports Center Fire Protection Analysis, Elijah Kimmig
Fire Protection Engineering: Culminating Experience Project Reports
The purpose of this project was to analyze and compare the existing fire protection systems in the college sports center to current applicable codes and standards. Both prescriptive based analysis and performance based analyses were performed.
The prescriptive based analyses included analyzing the structural fire protection, fire suppression, fire alarm, and egress systems. Overall, the majority of the fire protection systems appeared to meet the requirements of the current codes but there are a few items that were found that appear to not meet current code. These items are listed below along with recommendations to mitigate: (1) Placement of certain …
Sole On The Ocean Hotel, Dale Mcdowell
Sole On The Ocean Hotel, Dale Mcdowell
Fire Protection Engineering: Culminating Experience Project Reports
The following is an analysis of the fire protection systems and services at the Sole On The Ocean, Hotel (pronounced So-lay), Restaurant and Parking Building, located in Sunny Isles (Miami), Florida. Sole is used for temporary sleeping accommodations, business conference and restaurant purposes. The building is considered a high-rise building and is 24 Stories tall. The building occupancy classification is mixed used for Hotel (Residential), Restaurant (Assembly) and Parking (Storage). The prescriptive analysis was based on the Florida Building Code (FBC) which is identical to the International Building Code (IBC) with a few addendums. This report will adhere to the …
California Polytechnic State University – San Luis Obispo Building 180: Baker, Kelly Kessloff
California Polytechnic State University – San Luis Obispo Building 180: Baker, Kelly Kessloff
Fire Protection Engineering: Culminating Experience Project Reports
This project was performed as part of the requirements for completion of the Fire Protection Engineering Master’s Program at Cal Poly. This project covers a full prescriptive and performance based analysis on the Warren J. Baker Center for Science and Mathematics. This building was constructed on Cal Poly’s campus in 2013 and serves occupancies such as classrooms, laboratories, and office space for students and professors.
The prescriptive based analysis of this report will analyze the applicable building codes and determine if this building is compliant. Relevant codes include the 2016 California Building and the 2016 California Fire Code. In addition …
Fire Protection And Life Safety Analysis Of A Chicago Hotel, Thomas Hampton
Fire Protection And Life Safety Analysis Of A Chicago Hotel, Thomas Hampton
Fire Protection Engineering: Culminating Experience Project Reports
The following report contains an analysis of the life safety and fire protection features of a Chicago Hotel. The report is intended to meet the requirements for the Culminating Experience of the Cal Poly Master of Science Fire Protection Engineering Program.
The Chicago Hotel building chosen for the analysis is a mixed-use 7-story hotel. On the 1st, 2nd, and 7th floors of the building are spaces for mercantile and restaurant tenants as well as other spaces necessary for the operation of the building such as back of house space for the hotel, storage, employee locker rooms, hotel and retail lobbies, …
Research Laboratory: Fire, Explosion, And Life Safety Analysis, Dennis A. Tuma
Research Laboratory: Fire, Explosion, And Life Safety Analysis, Dennis A. Tuma
Fire Protection Engineering: Culminating Experience Project Reports
This culminating report is a fire, explosion, and life safety evaluation of a Research Laboratory ("Laboratory") where significant quantities of flammable, combustible, and hazardous materials are used and stored. The report's initial portion provides a prescriptive-based analysis using applicable sections of the 2016 California Building Standard Codes and National Fire Protection Association (NFPA) standards. Because of the unique challenges to hazardous laboratory spaces, the prescriptive- based analysis includes both a review of codes applicable to all occupancies (e.g., egress, fire-resistance, building area), and codes applicable to Group H and L occupancies (e.g., electrical area classification maps, control areas). Unfortunately, detailed …
Powell Building, David John Devinney
Powell Building, David John Devinney
Fire Protection Engineering: Culminating Experience Project Reports
A detailed study of the fire and life safety systems was performed on the Powell Building located in Oak Ridge, TN. This report consists of both prescriptive and performance-based analysis. The prescriptive based analysis reviews the fire and life safety requirements in accordance with the applicable codes. The prescriptive portion of this report included life safety, fire suppression systems, fire alarm and detection systems, and structural fire protection. The performance-based analysis was used with viable fire scenarios to ensure that occupants could safely egress the building. This was accomplished by comparing the Required Safe Egress Time (RSET) with the Available …
New Campus Life Center Fire Protection Evaluation, Shawn R. Block
New Campus Life Center Fire Protection Evaluation, Shawn R. Block
Fire Protection Engineering: Culminating Experience Project Reports
This project report is a fire and life safety evaluation of a newly constructed building. The new Campus Life Center (CLC) building is located on the campus of Emory University in Atlanta, Georgia. The CLC is a student center where students, staff, and guests can gather to socialize, study, eat and attend conferences. The prescriptive requirements were based on the Georgia State Fire Codes, adopted on January 2014 and served as code of record for this facility. Occupant classification was established from both International Building Code (IBC) and Life Safety Code (LSC), NFPA 101, to determine construction type, interior finish …
Fire Protection Analysis: Engineering Iv, Building 192, Cal Poly State University, San Luis Obispo, Paul Jenkins
Fire Protection Analysis: Engineering Iv, Building 192, Cal Poly State University, San Luis Obispo, Paul Jenkins
Fire Protection Engineering: Culminating Experience Project Reports
This report is an analysis of the fire protection capabilities of Engineering IV (Building 192) at Cal Poly University in San Luis Obispo, CA. The overall objective of this report was to assess whether the building and its fire protection systems supported the evacuation of occupants from the building in a safe manner before conditions became untenable during a fire event. The assessment was accomplished by performing a prescriptive and performance analysis.
The purpose of the prescriptive analysis was to determine whether the building egress components and fire protections systems were designed, built, and installed in compliance with all the …