Articles 1 - 2 of 2
Full-Text Articles in Other Operations Research, Systems Engineering and Industrial Engineering
Origami-Based Deployable Ballistic Barrier, Kenny Seymour, Dakota Burrow, Alex Avila, Terri Bateman, David C. Morgan, Spencer P. Magleby, Larry L. Howell
Origami-Based Deployable Ballistic Barrier, Kenny Seymour, Dakota Burrow, Alex Avila, Terri Bateman, David C. Morgan, Spencer P. Magleby, Larry L. Howell
Faculty Publications
This paper demonstrates how recent developments in origami crease pattern adaptation, surrogate folds, and thickness accommodation techniques enabled development of an origami-based deployable ballistic barrier. The barrier crease pattern was employed using the membrane-fold technique for surrogate folds and to assist in thickness accommodation. A proof-of-concept barrier was fabricated and tested, demonstrating ballistic resistance, a large deployment ratio, and rapid deployment times.
Likelihood And Cost Impact Of Engineering Change Requirements For Dod Contracts, James C. Ellis, Edward D. White, Jonathan D. Ritschel, Shawn M. Valentine, Brandon Lucas, Ian S. Cordell
Likelihood And Cost Impact Of Engineering Change Requirements For Dod Contracts, James C. Ellis, Edward D. White, Jonathan D. Ritschel, Shawn M. Valentine, Brandon Lucas, Ian S. Cordell
Faculty Publications
Purpose: There appears to be no empirical-based method in the literature for estimating if an engineering change proposal (ECP) will occur or the dollar amount incurred. This paper aims to present an empirically based approach to address this shortfall.
Design/Methodology/Approach: Using the cost assessment data enterprise database, 533 contracts were randomly selected via a stratified sampling plan to build two regression models: one to predict the likelihood of a contract experiencing an ECP and the other to determine the expected median per cent increase in baseline contract cost if an ECP was likely. Both models adopted a stepwise approach. A …