Articles 1 - 30 of 97

Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

A Check Parameter Method For Use In Designing Relays, H Kadete Dec 1993

A Check Parameter Method For Use In Designing Relays, H Kadete

Tanzania Journal of Engineering and Technology (TJET)

Low quality magnetic steel available locally has been successfully used as core material for a relay. New design principles as well as construction procedure used in development of a prototype are presented. Then the new approach is assessed and found to deliver acceptable accuracy.


Improvement Of Solar Salt Works Performance, J Katima Dec 1993

Improvement Of Solar Salt Works Performance, J Katima

Tanzania Journal of Engineering and Technology (TJET)

Coal, asphalt, black oil paint, naphthol green b and alkali blue 6b were testedfor improvement Of solar energy utilisation in solar salt manufacture. It was found that the use of alkali blue 6b dye dissolved in raw seawater improves efficiency by 3.6 percent. Both modifications could increase solar salt works with a coal coated surface than one employing raw seawater dyed with alkali blue 6b.


Critical Evaluation Of The Effects Of Changes Made To Roughing Filters Of Mpira-Balaka Plant On Its Treatment And Operational Performance, C Zulu Dec 1993

Critical Evaluation Of The Effects Of Changes Made To Roughing Filters Of Mpira-Balaka Plant On Its Treatment And Operational Performance, C Zulu

Tanzania Journal of Engineering and Technology (TJET)

Mpira Balaka, a full scale rural water supply project was constructed in Ntcheu, Malawi, in 1988 utilising Slow Sand Filtration (SSF) as the main treatment process and roughing filtration as the pretreatment method,following the promo- tion of this technology by various international institutions. During the rainy seasons, the treatment plant for Mpira Balaka failed to cope with the high raw water turbidity, resulting into very short filter run times and hence also to unavoidable distribution Of very turbid water to the rural communi- ties as a result Of by-passing the filters. Of the fifty or so existing rural projects in …


Acuta Enews December 1993, Vol. 22, No. 12 Dec 1993

Acuta Enews December 1993, Vol. 22, No. 12

ACUTA Newsletters

In This Issue

Board Report

President's message

Telecom talks $$$ at UNM

US West to test high speed transmission

Big MAN on campus

Student toll fraud


Development Of A Systematic Approach To The Implementation Of A Computer Integrated Manufacturing (Cim) For Small To Medium Sized Companies, G. Steven Trimmer Dec 1993

Development Of A Systematic Approach To The Implementation Of A Computer Integrated Manufacturing (Cim) For Small To Medium Sized Companies, G. Steven Trimmer

Masters Theses

CIM technology is rapidly becoming an essential part of businesses of all types and sizes. The impact on the culture of the enterprise is possibly of even greater complexity. Most existing implementations have been done by large businesses large teams of specialized talent.

The unique scope of this work is to simplify the implementation of CIM for small companies. The basic research derived from the WMU/IBM CIM Management Center, a fully functioning CIM facility that provides hands on experience to students and regional businesses.

The cultural references concerning CIM are derived from reading and personal experiences with industry while setting …


Automating Satellite Range Scheduling, S. Michael Schalck Dec 1993

Automating Satellite Range Scheduling, S. Michael Schalck

Theses and Dissertations

The objective of this study was to develop a computer based satellite range scheduling SRS algorithm to create a 24 hour satellite support schedule. The algorithms goal was to schedule as many satellite support requests as possible. An iterative heuristic approach was used to schedule satellite support requests in three successive sub problems. The first sub problem involves scheduling low altitude satellite support requests using a mixed integer programming approach. The next two sub problems each involve scheduling 12 hour blocks of medium and high altitude satellite support requests, again using a mixed integer programming approach. Fourteen 24 hour schedules …


An Evaluation Of The Software Engineering Institute's Capability Maturity Model As A Framework For Software Process Improvement At Three Air Logistics Centers, Brian G. Hermann, Raymond J. Lewis Jr. Dec 1993

An Evaluation Of The Software Engineering Institute's Capability Maturity Model As A Framework For Software Process Improvement At Three Air Logistics Centers, Brian G. Hermann, Raymond J. Lewis Jr.

Theses and Dissertations

This research sought to determine whether a relationship exists between the maturity level of the software process, as determined by the Software Engineering Institutes Capability Maturity Model SEI CMM, and the actual success of particular software projects at three US Air Force Air Logistics Centers. Project success is defined in terms of cost, schedule, and quality criteria. In addition, each organizations acceptance of the SEI assessment as well as its effectiveness in setting up follow-on process improvement programs were evaluated. Finally, the process improvement programs were reviewed individually inasmuch as these programs are the mechanisms for achieving improved quality, lower …


Measuring User Satisfaction Of The Electronic Mail System At Air Force Materiel Command Headquarters As An Indicator Of The System's Effectiveness, Randall R. Bradford Dec 1993

Measuring User Satisfaction Of The Electronic Mail System At Air Force Materiel Command Headquarters As An Indicator Of The System's Effectiveness, Randall R. Bradford

Theses and Dissertations

The purpose of this study was to evaluate the effectiveness of the electronic mail system at the Air Force Materiel Command Headquarters. User satisfaction was measured as an indicator of the systems effectiveness. In order to provide an objective measurement of system effectiveness, the following research questions were addressed: (1) What is system effectiveness in relation to this particular electronic mail system, and how should it be measured? (2) What measurement instruments can be adapted, modified, or created to measure effectiveness as it is defined for problem? (3) If a measurement instrument is administered what do the results of the …


Synthetic Battlebridge: Information Visualization And User Interface Design Applications In A Large Virtual Reality Environment, Kirk G. Wilson Dec 1993

Synthetic Battlebridge: Information Visualization And User Interface Design Applications In A Large Virtual Reality Environment, Kirk G. Wilson

Theses and Dissertations

With shrinking budgets and fewer personnel, future military training will rely heavily on simulated environments. The goal for this training is to reduce cost while maintaining readiness and unparalleled capability for all levels of military command. This thesis effort, the Synthetic Battle Bridge SBB , provides a real-time simulated environment for military commanders to observe on-going computer simulations of varying participation levels and helps them wring the most from a simulation. The SBB, designed for higher ranking personnel with little time to spend learning how to run the system, must exhibit three capabilities ease-of-use, long-term retention, and adaptability. Based on …


Guidelines For Ensuring Software Supportability In Systems Developed Under The Integrated Weapon System Management Concept, Forrest F. Butts Iii, Anthony C. Johndro Dec 1993

Guidelines For Ensuring Software Supportability In Systems Developed Under The Integrated Weapon System Management Concept, Forrest F. Butts Iii, Anthony C. Johndro

Theses and Dissertations

This thesis studied the software maintenance planning and practices of the pilot Integrated Weapon System Management IWSM programs. Before IWSM, a System Program Office SPO acquired an Air Force weapon system then passed it to an Air Logistics Center ALC for follow-on support. The ALC was forced to maintain the software despite its questionable maintainability. The SPO de- emphasized maintainability because maintenance was an ALC responsibility and building maintainable software increased development costs and lengthened schedules. The IWSM philosophy closes the gap between development and maintenance. A System Program Director SPD, who oversees both system development and maintenance, has an …


Integration And Enhancement Of The Saber Wargame, Karl S. Mathias Dec 1993

Integration And Enhancement Of The Saber Wargame, Karl S. Mathias

Theses and Dissertations

The Saber wargame is a theater-level air/land battle wargame written in Ada that is being developed for the Air Force Wargaming Center at Maxwell AFB, AL. This thesis documents how the user interface and simulation engine were integrated. Integration was accomplished by developing a portable object-oriented database system (OODBMS) interface. The interface was implemented in Ada and tied to an OODBMS also written in Ada. Using the interface, both subsystems were able to work from a consistent database and exchange information. The user interface was enhanced by converting it from the Software Technology for Adaptable Reliable Systems Ada/X Window System …


Acuta Enews November 1993, Vol. 22, No. 11 Nov 1993

Acuta Enews November 1993, Vol. 22, No. 11

ACUTA Newsletters

In This Issue

Board Report

President's message

TASA commissions

Numbering plan means net manager pains

21st Century Technology

Toll Fraud


The Application Of Simulated Annealing To Stochastic Systems, Charles B. Warrender Nov 1993

The Application Of Simulated Annealing To Stochastic Systems, Charles B. Warrender

Theses and Dissertations

Simulated Annealing was used to optimize three constrained simulation models. For each of these models, seven different acceptance functions were evaluated and compared against the performance of Local Search. These comparisons demonstrated the affect that different acceptance functions have on the performance of the algorithm. The performance was measured by the average solution quality and average efficiency obtained from several runs. The first model facilitated the implementation of Simulated Annealing using the SLAM simulation language. The configuration space was small, described by only two decision variables. It demonstrated the viability of using Simulated Annealing to optimize the variable settings in …


A Robust Aggregation Approach To Simplification Of Manufacturing Flow Line Models, Paul Savory Nov 1993

A Robust Aggregation Approach To Simplification Of Manufacturing Flow Line Models, Paul Savory

Department of Industrial and Management Systems Engineering: Presentations

One of the more difficult tasks facing a modeler in developing a simulation model of a discrete part manufacturing system is deciding at what level of abstraction to represent the resources of the system. For example, questions about plant capacity can be modeled with a simple model, whereas questions regarding the efficiency of different part scheduling rules can only be answered with a more detailed model. In developing a simulation model, most of the actual features of the system under study must be ignored and an abstraction must be developed. If done correctly, this idealization provides a useful approximation of …


A Robust Aggregation Approach To Simplification Of Manufacturing Flow Line Models, Paul Savory Nov 1993

A Robust Aggregation Approach To Simplification Of Manufacturing Flow Line Models, Paul Savory

Department of Industrial and Management Systems Engineering: Faculty Publications

One of the more difficult tasks facing a modeler in developing a simulation model of a discrete part manufacturing system is deciding at what level of abstraction to represent the resources of the system. For example, questions about plant capacity can be modeled with a simple model, whereas questions regarding the efficiency of different part scheduling rules can only be answered with a more detailed model. In developing a simulation model, most of the actual features of the system under study must be ignored and an abstraction must be developed. If done correctly, this idealization provides a useful approximation of …


Development Of An Intelligent Geometry Measurement Procedure For Coordinate Measuring Machines, Tae-Sung Kim Oct 1993

Development Of An Intelligent Geometry Measurement Procedure For Coordinate Measuring Machines, Tae-Sung Kim

Theses

A Coordinate Measuring Machines (CMM) is a highly accurate electronic scale for the automatic measurement of 2 and 3 dimensional geometries. In a typical operation the CMM measures a set of user defined points, and then utilizes some internal logic to ascertain whether the inspected part meets the specifications. CMMs have received widespread acceptance among the manufacturing community, and in many instances are required as per supplier contract. Applications of CMMs vary from the measurement of simple 2D parts to complex 3D spatial frames (as for example in their use to measure the integrity of automobile frames). The primary objective …


Set-Up Saving Schemes For Printed Circuit Boards Assembly, Oded Z. Maimon, Ezey M. Dar-El, Tali F. Carmon Oct 1993

Set-Up Saving Schemes For Printed Circuit Boards Assembly, Oded Z. Maimon, Ezey M. Dar-El, Tali F. Carmon

Industrial and Manufacturing Engineering

Focusing on a basic printed circuit board (PCB) assembly line configuration characterized by very long set-up times, we examine two scheduling methods that can significantly reduce the set-up. Both methods -the Grouped Set-Up (GSU) method that has been recently introduced in the literature and the Sequence Dependent Scheduling (SDS) method, which has not been studied in this context -are based on component commonality among PCB types. Using the typical traditional scheduling method as a benchmark, the GSU and the SDS methods are compared in terms of three performance measures: line throughput, average work-in-process (WIP) inventory level, and implementation complexity. Guidelines …


Acuta Enews October 1993, Vol. 22, No. 10 Oct 1993

Acuta Enews October 1993, Vol. 22, No. 10

ACUTA Newsletters

In This Issue

E-mail

President's message

Data Comm Project at Delaware Tech

User Groups Meet at Conference

21st Century Technology

Staff Report


An Evaluation Of The Implementation Of Total Quality Management In A Service Organization, Charles Stanford Stevens Oct 1993

An Evaluation Of The Implementation Of Total Quality Management In A Service Organization, Charles Stanford Stevens

Engineering Management & Systems Engineering Theses & Dissertations

This research consists of a formative evaluation designed to identify the steps necessary to revitalize a formerly successful Total Quality Management (TQM) process at a U.S. Navy engineering and logistics support organization. The research also developed a methodology to account for the fact that the investigator is a well-informed insider who served as one of the principle change agents for the TQM implementation.

The research is based on the researcher's observation that the major cause for the waning implementation was due to senior management and leadership issues and the organization-wide processes with which they interface. The investigation consisted of an …


Integration Of Simulation Modeling And Computer Aided Production Management In Computer Integrated Enterprise, Emine Persentili, Sema E. Alptekin Sep 1993

Integration Of Simulation Modeling And Computer Aided Production Management In Computer Integrated Enterprise, Emine Persentili, Sema E. Alptekin

Industrial and Manufacturing Engineering

Designing efficient and integrated manufacturing systems is the first step in attaining computer integrated enterprises (CIE). Integration of planning and implementation phases of manufacturing is essential for taking full advantage of the CIE. In order to design reliable and efficient manufacturing systems, the designers must consider the impacts of planning decisions made by computer aided production management (CAPM) modules on implementations held in manufacturing cells. This paper focuses on two issues. The first issue is importance and necessity of integrating CAPM modules with manufacturing cells. The second issue includes major features of the object-oriented approach and their relevance to our …


An Investigation Of Integrated Product Development Implementation Issues: A Case Study Of Bosma Machine And Tool Corp, F. Paul Khuri, Howard M. Plevyak Jr. Sep 1993

An Investigation Of Integrated Product Development Implementation Issues: A Case Study Of Bosma Machine And Tool Corp, F. Paul Khuri, Howard M. Plevyak Jr.

Theses and Dissertations

This thesis investigated Integrated Product Development (IPD) implementation issues. Research emphasis focused on teams used in IPD, particularly self-directed work teams (SDWTs). The areas addressed in the study were: Work Environment, Team Organization, Training and Education, Group Dynamics and Communication, Motivation, Rewards and Incentives, Measurements, and Contracts. Data was collected using interviews and presented as a case study. The most significant findings on work environment were that the organization's leadership should commit to the teaming idea and sell it to the organization's members. Teams should be organized by choosing members carefully and defining all roles. Personnel should be trained in …


Acuta Enews September 1993, Vol. 22, No. 9 Sep 1993

Acuta Enews September 1993, Vol. 22, No. 9

ACUTA Newsletters

In This Issue

Emergency phones

President's message

FCC opens up local loop

CWRU cuts phone bill by 20%

Staff report


Software Cost Estimating Models: A Comparative Study Of What The Models Estimate, George A. Coggins, Roy C. Russell Sep 1993

Software Cost Estimating Models: A Comparative Study Of What The Models Estimate, George A. Coggins, Roy C. Russell

Theses and Dissertations

This effort developed a consolidated document which highlights and examines differences in definitions, assumptions, and methodologies used by the REVIC, SASET, PRICES, and SEER-SEM cost models. The following research questions were investigated: (1) What differences exist between the cost models? (2) How do these differences impact the resulting estimates? (3) To what degree can we explain and adjust for known differences between the cost models? Seven specific areas were addressed: (1) software development phases, (2) development activities and cost elements, (3) source lines of code and language differences, (4) key model attributes and key cost drivers, (5) implications of Project …


Pollution Prevention Incentives For Major Weapon System Programs, Donna C. Heinz, Dudley C. Wireman Sep 1993

Pollution Prevention Incentives For Major Weapon System Programs, Donna C. Heinz, Dudley C. Wireman

Theses and Dissertations

This research was undertaken to identify positive incentives that would motivate both government personnel and contractors to incorporate pollution prevention into the early design phases of weapon system acquisitions. The adoption and implementation of such incentives would allow the Air Force to reach pollution prevention objectives more efficiently. A literature search revealed little information on the pollution prevention program in the military. In contrast much information was found concerning military cleanup activities. As a result, in-depth personal interviewing was used to measure pollution prevention awareness in Aeronautical Systems Center program offices. Interviews, analysis, and comparisons were made between three groups …


Repair Process Improvement At The Ogden Air Logistics Center, Landing Gear Division: A Case Study In The Application Of The Theory Of Constraints, David A. Maddox, Susan L. Martz Sep 1993

Repair Process Improvement At The Ogden Air Logistics Center, Landing Gear Division: A Case Study In The Application Of The Theory Of Constraints, David A. Maddox, Susan L. Martz

Theses and Dissertations

This study explored the nature and extent of success that resulted from the implementation of the Theory of Constraints (TOC) in a depot repair environment. The actions taken to implement TOC were determined. Performance measures which defined success were identified and data were collected and summarized to demonstrate performance before and after implementation of TOC concepts. Improvements in flowdays and work-in-process (WIP) were determined to be attributable to the TOC effort. In addition, the unique characteristics of probabalistic repair and supply system variability were noted as those characteristics that posed the greatest challenges to implementing TOC in a remanufacturing environment. …


Scheduling A Medium-Sized Manufacturing Shop: A Simulation Study, Daniel J. Mcfeely Sep 1993

Scheduling A Medium-Sized Manufacturing Shop: A Simulation Study, Daniel J. Mcfeely

Theses and Dissertations

This study examined the application of simple-to-use, low cost scheduling methods to the operating environment of a medium-sized manufacturing shop. Computer simulation was used to evaluate eighteen different scheduling algorithms, each the result of the combination of a loading and a sequencing rule; due date setting was not considered since due dates are exogenously set. The loading rules investigated were Minimum Machine Required, Lowest Average WIP, and Lowest Average Aggregate Priority Level. The sequencing rules investigated were Priority, EDD, FIS, SPT, Slack, and Slack Ratio. The scheduling algorithms were evaluated against performance measures of mean tardiness, mean flowtime, mean percentage …


A Comparison Of The Disaster™ Scheduling Software With A Simultaneous Scheduling Algorithm For Minimizing Maximum Tardiness In Job Shops, Barak J. Carlson, Christopher A. Lettiere Sep 1993

A Comparison Of The Disaster™ Scheduling Software With A Simultaneous Scheduling Algorithm For Minimizing Maximum Tardiness In Job Shops, Barak J. Carlson, Christopher A. Lettiere

Theses and Dissertations

The Theory of Constraints (TOC) is the foundation for a computerized scheduling system called DISASTER. Although this system has proven successful in many manufacturing settings, it has potential limitations due to the sequential heuristic process by which it schedules constraints. The objective of this thesis was to determine the extent to which these limitations impact the due date performance of schedules created by DISASTER. This objective was addressed by developing an algorithm to simultaneously schedule multiple constraints in a job shop environment and provide the optimal schedule for minimized maximum tardiness. This algorithm was used to obtain solutions for a …


An Analysis Of The Effectiveness Of The Air Force Drug Testing Program And Four Potential Modifications, Thomas R. Doster, Hubert A. Ross Sep 1993

An Analysis Of The Effectiveness Of The Air Force Drug Testing Program And Four Potential Modifications, Thomas R. Doster, Hubert A. Ross

Theses and Dissertations

This study evaluated the 1992 USAF Drug Testing Program and potential improvements, based on the number of drug users detected, cost, and legal issues. Four potential improvements were examined: (1) increasing the annual amount of random urinalysis; (2) increasing the proportion of commander-directed testing; (3) using a weighted selection technique, and (4) replacing urinalysis with hair testing. For each improvement, the researchers used test and survey results to estimate the number of drug users detected, a cost formula to estimate any changes in cost, and interviews with legal experts to identify any legal issues associated with implementing the modification. Researchers …


A Decision Support Model Using Life Cycle Cost (Lcc) Analysis To Select Cost-Effective Alternatives For Hazardous Materials, Blaine F. Burley, Kirk A. Phillips Sep 1993

A Decision Support Model Using Life Cycle Cost (Lcc) Analysis To Select Cost-Effective Alternatives For Hazardous Materials, Blaine F. Burley, Kirk A. Phillips

Theses and Dissertations

This research focuses on the development of a decision support model to select cost-effective alternatives for hazardous materials using life cycle cost (LCC) analysis. The model provides an effective decision-making tool to evaluate the economic feasibility of using alternatives for hazardous materials. Given a specific operation, the users of this model can enter site-specific cost data to determine the total LCCs of using baseline hazardous materials (i.e., hazardous materials currently being used in an operation), as well as the total LCCs of using various alternatives. This thesis postulates that the material having the lowest total LCC is considered to be …


Schedule Estimating Relationships For The Engineering And Manufacturing Development Of Bomber, Transport, Tanker And Surveillance Aircraft Systems, D. Scott Boyd, Brian D. Mundt Sep 1993

Schedule Estimating Relationships For The Engineering And Manufacturing Development Of Bomber, Transport, Tanker And Surveillance Aircraft Systems, D. Scott Boyd, Brian D. Mundt

Theses and Dissertations

This study developed parametric schedule estimating relationships (SERs) for the engineering and manufacturing development (EMD) phase for nontactical aircraft systems. The potential value of this nontraditional approach to estimating schedule duration has been established by previous applications to tactical aircraft, air-launched munitions, and office buildings. Prior research suggested acquisition strategy parameters to be significant schedule drivers. For this study, data on EMD milestone dates and potential schedule drivers were collected on 56 bomber, transport, tanker, and surveillance aircraft systems. Several SERs were developed for these systems using linear regression analysis. The EMD phase was divided into subphases based on significant …