Open Access. Powered by Scholars. Published by Universities.®

Structural Materials Commons™

Open Access. Powered by Scholars. Published by Universities.®

Cable-stayed bridge

Publication Year

Articles 1 - 16 of 16

Full-Text Articles in Structural Materials

Research On Cable Force Optimization Of Long-Span Cable-Stayed Bridges Based On Rbfnn+Improved Parti Cle Swarm Optimization Algorithm, Deng Da, He Bowen, Liu Guokun Dec 2025

Research On Cable Force Optimization Of Long-Span Cable-Stayed Bridges Based On Rbfnn+Improved Parti Cle Swarm Optimization Algorithm, Deng Da, He Bowen, Liu Guokun

Journal of China & Foreign Highway

In view of the cable force optimization problem of long-span cable-stayed bridges,a cable force optimization method considering the reliability index of stay cables was proposed based on the response surface fitted by the radial basis function neural network (RBFNN ).The RBFNN-based response surface model for solving the reliability index was established by fitting the structural implicit function through RBFNN training.The improved particle swarm optimization algorithm was used to search for the optimal solution of the cable force optimization model considering the reliability index.The research results show that RBFNN can accurately predict the structural responses and fit the structural implicit performance …


Wind Tunnel Test On Wind-Resistant Performance Of Suspended Monorail Cable-Stayed Bridge, Chen Yujiang Aug 2025

Wind Tunnel Test On Wind-Resistant Performance Of Suspended Monorail Cable-Stayed Bridge, Chen Yujiang

Journal of China & Foreign Highway

To investigate the wind-induced vibration of a suspended monorail bridge,a full-bridge aeroelastic model at a 1∶40 scale was designed and fabricated according to the geometrical parameters and dynamic characteristics of the real bridge.Wind tunnel tests on the bridge in both the completed state and the maximum cantilever state were conducted under different conditions,including uniform flow and turbulent flow,yaw angles of ± 45°,±30°,±15°,and 0°,and wind attack angles of ‒ 3°,0°,and + 3°.Both vertical and torsional displacements of the structure under different wind speeds were measured.The test results show that the vertical displacements and torsional responses of the cable-stayed bridge increase when …


Method Of Solving Initial Construction Cable Force Of Completed Cable‑Stayed Bridge, Xu Yufeng, Chen Si, Xie Yunfei, Zhu Mengyang Oct 2024

Method Of Solving Initial Construction Cable Force Of Completed Cable‑Stayed Bridge, Xu Yufeng, Chen Si, Xie Yunfei, Zhu Mengyang

Journal of China & Foreign Highway

To solve the initial construction cable forces of a completed cable-stayed bridge,a method that combines unstressed cable length and forward-iteration is proposed.Firstly,the unstressed length of each cable is calculated according to the completed bridge state.Then,the initial cable forces are obtained by using the unstressed cable length for the forward analysis.The initial construction cable forces are adjusted by difference iteration.Finally,the initial construction cable forces are fine-tuned according to the deformation of the pylon deformation to obtain the bridge completion state that satisfies the deviation requirements.The proposed method is employed in a cable-stayed bridge with a known completion state to calculate the …


Application Of Sequential Quadratic Programming Method In Cable Force Adjustment Of Cable‑Stayed Bridges, Xu Yufeng, Zhu Mengyang, Chen Si, Xie Yunfei Jul 2024

Application Of Sequential Quadratic Programming Method In Cable Force Adjustment Of Cable‑Stayed Bridges, Xu Yufeng, Zhu Mengyang, Chen Si, Xie Yunfei

Journal of China & Foreign Highway

When the construction of a cable-stayed bridge enters the completion stage,due to various factors,there is a certain error between the actual alignment and internal force of the structure and the theoretical completion state,and it is usually necessary to adjust the cable force.In order to calculate the cable force adjustment of a cable-stayed bridge in the adjustment stage,a method based on an influence matrix and sequential quadratic programming was proposed to solve the cable force adjustment.A large-span hybrid girder cable-stayed bridge was taken as the background,and the alignment and internal force response values of the structure with varying cable units were …


Parameter Sensitivity Analysis Of Single‑Tower Cable‑Stayed Bridge With Mixed Beam, Chen Kongliang, Ye Jianxin, Xu Yufeng, Huang Zhuobin, Guo Fengtao May 2024

Parameter Sensitivity Analysis Of Single‑Tower Cable‑Stayed Bridge With Mixed Beam, Chen Kongliang, Ye Jianxin, Xu Yufeng, Huang Zhuobin, Guo Fengtao

Journal of China & Foreign Highway

To improve the efficiency of the review simulation model of the bridge monitoring unit and study the influence of different parameters of the single-tower mixed beam cable-stayed bridge on the bridge ’s completed state in the construction process,this paper,taking the cable-stayed bridge of Tongji Road in Foshan with a span of (200+68+46) m as the engineering background,adopted the single control variable method and response surface-Monte Carlo method for sensitivity analysis.Taking the main beam alignment,main tower alignment,main beam stress,and the variation of cable-stayed bridge force as control objectives,this paper studied the influence of the variation of main beam weight,initial tensile force,and …


Design And Installation Technology Of Hanging Basket For Long‑Span Concrete Girder Cable‑Stayed Bridge, Zeng Xianliu, Pang Jianguo, Chen Cheng May 2024

Design And Installation Technology Of Hanging Basket For Long‑Span Concrete Girder Cable‑Stayed Bridge, Zeng Xianliu, Pang Jianguo, Chen Cheng

Journal of China & Foreign Highway

The main bridge of Zhungeer Yellow River Super Major Bridge is a (160+440+160) m double tower double cable plane full floating system concrete grider cable-stayed bridge.The main beam is a 28.4m wide double box prestressed concrete structure.It was constructed by cantilever pouring with a front fulcrum hanging basket.The maximum weight of the cantilever pouring section is 5 800 kN.To ensure the integral rigidity of the hanging basket,the hanging basket bearing platform adopted the steel box girder structure.The long and large components were connected by high-strength bolts made in sections to facilitate the transportation and installation of the hanging basket.The hanging …


Deflection Variation Rule Of Main Girder For A Concrete Cable‑Stayed Bridge Based On Combined Static And Dynamic Modification, Li Qi, Qi D Ongchun, Yang Hu, Zhao Zhiguo Mar 2024

Deflection Variation Rule Of Main Girder For A Concrete Cable‑Stayed Bridge Based On Combined Static And Dynamic Modification, Li Qi, Qi D Ongchun, Yang Hu, Zhao Zhiguo

Journal of China & Foreign Highway

In order to solve the problem of continuous downward deflection of the main girder for a concrete cable-stayed bridge during its service life,the deflection variation of the main girder for a long-span concrete cable-stayed bridge during its service was analyzed based on the modified model.A dual-objective optimization problem was constructed by using the combined static and dynamic finite element model modification method and was solved by the non-dominated sorting genetic algorithm (NSGA- Ⅱ).The Pareto optimal solution set was obtained,and the coordinated optimal solution was found in the Pareto optimal solution set,so as to modify the finite element model.The calculated values …


Stress Analysis And Monitoring Of Composite Cable Hanging Basket During Construction, Zhou Su, Li Xinsheng, Liu Chentao, Shao Mingjie Sep 2023

Stress Analysis And Monitoring Of Composite Cable Hanging Basket During Construction, Zhou Su, Li Xinsheng, Liu Chentao, Shao Mingjie

Journal of China & Foreign Highway

Composite cable hanging baskets are also known as front and rear pivot combined hanging baskets. By taking the construction monitoring of a single-tower and double plane cable-stayed bridge as the research project, this paper demonstrated the rationality, practicability and advancement of the composite cable hanging baskets during construction, and carried out modeling analysis of the whole construction stage. Meanwhile, the batch tension values of the construction sections were determined according to the deformation of the hanging basket during the construction stage, and then the theoretical and measured values of the basket’s deformation and stress during the construction stage were analyzed …


Analysis And Optimal Adjustment Of Manufacturing Errors Of Main Girder Of Long ⁃Span Steel Box Cable ⁃Stayed Bridge, Tu Guangya, Zhou Zhizhe Jul 2023

Analysis And Optimal Adjustment Of Manufacturing Errors Of Main Girder Of Long ⁃Span Steel Box Cable ⁃Stayed Bridge, Tu Guangya, Zhou Zhizhe

Journal of China & Foreign Highway

In order to study the influence of the random manufacturing error of the main girder permitted by the research specification on the alignment of the finished long-span steel box cable-stayed bridge, guided by the adaptive stress-free configuration construction control theory, the Shishou Yangtze River Highway Bridge, a long-span twin-tower cable-stayed bridge, was studied. The influence and propagation characteristics of the random error effect of the main girder members on the main structure of the cable-stayed bridge were analyzed. The adverse effects of random manufacturing errors of the main girder on the structure of the cable-stayed bridge were studied. The results …


Study On Correction Method Of Cable Length Error In Construction Control Of Cable ⁃Stayed Bridges, Huang Gen, Chen Changsong Jul 2023

Study On Correction Method Of Cable Length Error In Construction Control Of Cable ⁃Stayed Bridges, Huang Gen, Chen Changsong

Journal of China & Foreign Highway

In order to effectively correct the stay cable length error during the construction of the cable-stayed bridge, this paper proposed a correction method with the exposure of the sockets as the error control index and analyzed the influence of the elastic modulus, temperature effect, and anchor point coordinates of the cable on the cable length error from the perspective of construction control. Then, error correction was achieved by adjusting the position of the manufacturing cable length and the nut at the anchor end. The results of application in Jiayu Yangtze River Highway Bridge show that this method can improve the …


Research On Reasonable Completion State And Construction Stage Of Fenghuang Road Bridge, Chen Qiang, Gao Libao, Du Hongliang Mar 2023

Research On Reasonable Completion State And Construction Stage Of Fenghuang Road Bridge, Chen Qiang, Gao Libao, Du Hongliang

Journal of China & Foreign Highway

In order to study the reasonable completion state of Fenghuang Road Bridge and analyze the construction stage, the finite element model was first established by Midas/Civil, and the correlation matrix was extracted. The minimum strain energy of Fenghuang Road Bridge was used as the objective function, and the mathematical optimization model was established by Matlab to determine the reasonable completion state and construction sequence of the bridge. To ensure reasonable cable force of the bridge, the construction cable force was solved by the forward assembly iteration, and the law of the construction cable force was basically the same as that …


Analysis On Local Relative Deformation Of Vertical And Horizontal Split Block Section Of Ultra Wide Steel Box‐Girder, Liu Li, Peng Chengming, Luo Hang Mar 2023

Analysis On Local Relative Deformation Of Vertical And Horizontal Split Block Section Of Ultra Wide Steel Box‐Girder, Liu Li, Peng Chengming, Luo Hang

Journal of China & Foreign Highway

In order to meet the requirement that the channel should not be occupied during the construction of the 4th Bridge over the Panama Canal, an innovative construction scheme was proposed for the erection of the ultra-wide overweight steel box girder with central double cable planes (standard section length of 13 m, width of 51 m, and weight of about 370 t), or in other words, the steel box girder was divided into two horizontal segments after vertical segmentation and then horizontally lifted onto the bridge deck through the cable tower. The steel box girder was moved to the bridge deck …


Research On Reasonable Completion State And Construction Stage Of Fenghuang Road Bridge, Chen Qiang, Gao Libao, Du Hongliang Mar 2023

Research On Reasonable Completion State And Construction Stage Of Fenghuang Road Bridge, Chen Qiang, Gao Libao, Du Hongliang

Journal of China & Foreign Highway

In order to study the reasonable completion state of Fenghuang Road Bridge and analyze the construction stage, the finite element model was first established by Midas/Civil, and the correlation matrix was extracted. The minimum strain energy of Fenghuang Road Bridge was used as the objective function, and the mathematical optimization model was established by Matlab to determine the reasonable completion state and construction sequence of the bridge. To ensure reasonable cable force of the bridge, the construction cable force was solved by the forward assembly iteration, and the law of the construction cable force was basically the same as that …


Analysis On Local Relative Deformation Of Vertical And Horizontal Split Block Section Of Ultra Wide Steel Box‐Girder, Liu Li, Peng Chengming, Luo Hang Mar 2023

Analysis On Local Relative Deformation Of Vertical And Horizontal Split Block Section Of Ultra Wide Steel Box‐Girder, Liu Li, Peng Chengming, Luo Hang

Journal of China & Foreign Highway

In order to meet the requirement that the channel should not be occupied during the construction of the 4th Bridge over the Panama Canal, an innovative construction scheme was proposed for the erection of the ultra-wide overweight steel box girder with central double cable planes (standard section length of 13 m, width of 51 m, and weight of about 370 t), or in other words, the steel box girder was divided into two horizontal segments after vertical segmentation and then horizontally lifted onto the bridge deck through the cable tower. The steel box girder was moved to the bridge deck …


Installation Construction Technology Of Composite Girder Cable‐Stayed Bridge Superstructure In Deep‐Cutting Gorge, Ren Lei, Lu Liang, Dong Zhengliang Mar 2023

Installation Construction Technology Of Composite Girder Cable‐Stayed Bridge Superstructure In Deep‐Cutting Gorge, Ren Lei, Lu Liang, Dong Zhengliang

Journal of China & Foreign Highway

In view of the installation problems of superimposed beam cable-stayed bridge across the deep canyon, this paper studied the superimposed beam lifting, transport on beam, and superimposed beam installation and proposed three kinds of lifting technology with tower truss crane, beam lifting door crane, and large tower crane, as well as two kinds of installation technology including piecemeal assembly by full rotating deck crane and whole segment assembly truss deck crane. It also made a relative comparative analysis, solving the difficulty in vertical lifting on such bridges and providing a reference for the construction of the same type of cable-stayed …


Installation Construction Technology Of Composite Girder Cable‐Stayed Bridge Superstructure In Deep‐Cutting Gorge, Ren Lei, Lu Liang, Dong Zhengliang Mar 2023

Installation Construction Technology Of Composite Girder Cable‐Stayed Bridge Superstructure In Deep‐Cutting Gorge, Ren Lei, Lu Liang, Dong Zhengliang

Journal of China & Foreign Highway

In view of the installation problems of superimposed beam cable-stayed bridge across the deep canyon, this paper studied the superimposed beam lifting, transport on beam, and superimposed beam installation and proposed three kinds of lifting technology with tower truss crane, beam lifting door crane, and large tower crane, as well as two kinds of installation technology including piecemeal assembly by full rotating deck crane and whole segment assembly truss deck crane. It also made a relative comparative analysis, solving the difficulty in vertical lifting on such bridges and providing a reference for the construction of the same type of cable-stayed …