Open Access. Powered by Scholars. Published by Universities.®
Articles 1 - 1 of 1
Full-Text Articles in Signal Processing
Calculate The Reliability Of The Bts-Bsc Network With The Reserved Line Connection, Dilmurod Davronbekov, Utkir Karimovich Matyokubov
Calculate The Reliability Of The Bts-Bsc Network With The Reserved Line Connection, Dilmurod Davronbekov, Utkir Karimovich Matyokubov
Chemical Technology, Control and Management
The issue of reserving communication lines between the base station and the mobile network base station controller which are considered as one system is considered. Analytical expressions have been developed for calculating the reliability of the system for various options for backing up communication lines between the base station and the base station controller. The results of research and calculations of reliability for ten different types of backup communication lines of the base station and the base station controller are presented.