Dickey-Lincoln School Lakes Transmission Project: Final Environmental Impact Statement: Appendix L, New England Division, United States Army Corps Of Engineers, United States Department Of Energy Jan 1981

Dickey-Lincoln School Lakes Transmission Project: Final Environmental Impact Statement: Appendix L, New England Division, United States Army Corps Of Engineers, United States Department Of Energy

Dickey-Lincoln School Lakes Project

This draft EIS Supplement describes the environmental impacts of updated transmission plans of the Department of Energy (DOE) for the proposed Dickey-Lincoln School Lakes Project. Energy produced by the project is to be integrated into the New England electric system if the project is constructed.


Dickey-Lincoln School Lakes Environmental Impact Statement : Supplement To Draft Eis For Transmission Lines Prepared By The Department Of Energy, New England Division, U.S. Army Corps Of Engineers Jan 1978

Dickey-Lincoln School Lakes Environmental Impact Statement : Supplement To Draft Eis For Transmission Lines Prepared By The Department Of Energy, New England Division, U.S. Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

Consultation and Coordination During Preparation of the DEIS DOE, in developing the scope of work for the Dickey-Lincoln School Lakes transmission study, recognized the need for a great deal of consultation and coordination. Consultation, coordination, and public involvement were integral parts of the study design. As part of this effort, extent of experience in northern New England and location were important factors in selecting consultants for various portions of the study. The System Planning Study (Appendix A), DOE's first project effort, was accomplished in coordination with the electric utilities of the region, specifically NEPLAN, the planning arm of the New …


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix A, United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix A, United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the trans-mission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in iden-tification of a proposed transmission line route, and an environmental impact statement, as required by the National Environmental Policy Act of 1969. This report, documenting an early phase of the overall studies, was first published by the Department of the Interior in February 1977. It is being republished as Appendix A to the DOE Environmental Impact Statement for the project.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

The principal objective of this study is to identify the major types and intensity of social and economic impacts anticipated with the proposed pre-construction, construction, operation and maintenance of the Dickey-Lincoln transmission line. In order to address the types of anticipated impacts it was necessary to first develop a socio-economic profile of the affected area.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix D: Transmission Reconnaissance Study, U.S. Department Of The Interior, U.S. Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix D: Transmission Reconnaissance Study, U.S. Department Of The Interior, U.S. Department Of Energy

Dickey-Lincoln School Lakes Project

This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New England grid, and describes the study area involved. It supplements the Transmission System PI anning Study prepared by the Department of Interior (DOI) (February 1977) and the Assessment of Alternative Power Transmission Corridors prepared by VTN Consolidated (VTN) of Boston Mass., for the Dickey-Lincoln School Lakes project.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the trans-mission facilities required for the Dickey-Lincoln School Hydroelectric project. These studies of many alternate routes have resulted in iden-tification of a proposed transmission line route and an environmental impact statement, as required by the National Environmental Policy Act of 1969. This report, one of several prepared under contract to the DOE by various consultants, is published as an appendix to that statement. Appendix F, Geotechnical Impact Study (two volumes, the second being a map volume), documents a study performed by E. C. …


Alternative Power Transmission Corridors. Map Volume., United States. Department Of Energy Jan 1978

Alternative Power Transmission Corridors. Map Volume., United States. Department Of Energy

Dickey-Lincoln School Lakes Project

Source data for base map taken from US Geological Survey Topographic Maps. 1:250.000 scale series. Horizontal and vertical control depicted herein is relative to the U S.G S source maps.


Geotechnical Impact Study. Map Volume, United States Department Of Energy Jan 1978

Geotechnical Impact Study. Map Volume, United States Department Of Energy

Dickey-Lincoln School Lakes Project

Surficial Deposits Legend Maps of Dickey/Lincoln School lakes Transmission - E.I.S.Project, Environmental Assessment of Alternative Routs, Geotechnical Study, United States Department of the Interior.


Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy Jan 1978

Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy

Dickey-Lincoln School Lakes Project

This draft environmental impact statement (EIS) will describe the environmental impacts of transmission plans of the Department of Energy (DOE) for the proposed Dickey-Lincoln School Lakes Project. Electric power produced by the project is to be integrated into the New England electric system if the project is constructed.


Ecological Resources Impact Study. Map Volume, United States. Department Of Energy Jan 1978

Ecological Resources Impact Study. Map Volume, United States. Department Of Energy

Dickey-Lincoln School Lakes Project

Environmental Assessment of Alternative Routes, Ecological Resources Impact Study, Maps and Legend land cover types


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix J: Historical-Archeological Impact Study, Albert A. Dekin Jr., Bruce R. Donaldson, J. Lloyd Pepper, Paul A. Robinson, Edward A. Hession, Judith A. Rasson, Public Archaeology Facility Department Of Anthropology, United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix J: Historical-Archeological Impact Study, Albert A. Dekin Jr., Bruce R. Donaldson, J. Lloyd Pepper, Paul A. Robinson, Edward A. Hession, Judith A. Rasson, Public Archaeology Facility Department Of Anthropology, United States Department Of Energy

Dickey-Lincoln School Lakes Project

The report assessing cultural resources for the Dickey/Lincoln School Transmission Project consists of five narrative chapters, a topical bibliography, and five appendices. The scope of work, together with the USDI guidelines for cultural resource survey (included in Appendix E), comprise an attitude and approach toward prehistory which is in accord with the current state of the art, not simply in terms of cultural resource management but also in terms of contemporary standards generally recognized by practitioners of anthropological archaeology.


Land Use Impact Study. Map Volume, United States. Department Of Energy Jan 1978

Land Use Impact Study. Map Volume, United States. Department Of Energy

Dickey-Lincoln School Lakes Project

Environmental Assessment of Alternative Routes, Land Use Study, Maps, Existing land use


Visual-Recreation Resources Impact Study. Map Volume, United States. Department Of Energy Jan 1978

Visual-Recreation Resources Impact Study. Map Volume, United States. Department Of Energy

Dickey-Lincoln School Lakes Project

Environmental Assessment of Alternative Routes, Visual/Recreational Resources Impact Studies, Maps of Recreational Resources


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix B: Alternative Power Transmission Corridors, United States Department Of Energy, United States Department Of The Interior Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix B: Alternative Power Transmission Corridors, United States Department Of Energy, United States Department Of The Interior

Dickey-Lincoln School Lakes Project

This report identifies alternative corridors of land within which transmission lines could be routed and details various impacts on the environment which would be associated with introduction of transmission facilities. Many alternative corridor locations were identified (see Figure 1-1). Identification of these alternative transmission corridors was a complex process, since the number of potential corridors capable of connecting the various substations was myriad; the 'least desirable' potential corridors, i.e., those where transmission facilities might have entailed severest impacts on the environment, had to be eliminated from consideration before alternative corridors could be delineated. Identified alternative corridor locations were subsequently evaluated …


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the transmission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in identification of a proposed transmission line route, and an environmental impact statement as required by the National Environmental Policy Act of 1969. This report, one of several covering various topical areas, is published as an appendix to that statement.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix E: Ecological Resources Impact Study, United States Department Of Energy, Dickey-Lincoln School Lakes Project Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix E: Ecological Resources Impact Study, United States Department Of Energy, Dickey-Lincoln School Lakes Project

Dickey-Lincoln School Lakes Project

The responsibility for marketing federally generated power (under provisions of the Flood Control Act of 1944) was transferred from the Department of the Interior to the newly formed Department of Energy. The power transmission portions of the Dickey- Lincoln School Lakes Project were included in that transfer. The U.S. Department of the Interior and Energy have conducted system planning, location, and environmental studies for the transmission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in identification of a proposed transmission line route and an environmental impact statement, as required by the National …


Dickey-Lincoln School Lakes Project: Transmission System Planning Study, United States Department Of The Interior Jan 1977

Dickey-Lincoln School Lakes Project: Transmission System Planning Study, United States Department Of The Interior

Dickey-Lincoln School Lakes Project

The purpose of this report is to investigate various transmission system alternatives and recommend a plan of service to integrate power from the Dickey-Lincoln School Lakes (D-L) Project into the New England electric power transmission system.


Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior Jan 1977

Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior

Dickey-Lincoln School Lakes Project

Two dams are proposed on the St. John River in northern Maine: Dickey, a high earth filled dam immediately above the confluence of the Allagash with the St. John, will have an installed generating capacity of 760 MW; and Lincoln School Dam, 11 miles downstream, a capacity of 70 MW. These dams are scheduled for completion during the mid 1980's. The U.S. Corps of Engineers, New England Division, has been allocated funds to design the project and prepare their own environmental impact statement. This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New …


Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior Jan 1976

Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior

Dickey-Lincoln School Lakes Project

This second volume of the Assessment of Alternative Power Transmission Corri-dors related to the Dickey Lincoln/School Hydroelectric Project, contains all relevant background materials to support the mapping and analysis of en-vironmental resource information. Narrative explaining what information was evaluated and the sources and reasons for its consideration are integral to this assessment.


Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior Jan 1976

Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior

Dickey-Lincoln School Lakes Project

The regional scope of this study (a three state area of approximately 33,000 square miles) necessitated an initial investigation to determine what data was available. Known and potential sources of data were identified through the use of the Environmental Data Reconnaissance Report* prepared by Comitta Frederick Associates for the United States Depart-ment of the Interior in March 1976. The collected data was then analyzed for its accuracy, reliability, mappability and compatibility with the scope of this study.


Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior Jan 1976

Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior

Dickey-Lincoln School Lakes Project

This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System. Five alternate integration plans were identified and studied. Of the five plans, the recommended plan, which calls for the lines to be suspended from a single row of …