Open Access. Powered by Scholars. Published by Universities.®
- Institution
- Keyword
-
- Hydroelectric power plants (2)
- Sustainability (2)
- Water resources development (2)
- Aroostook County (1)
- Building design (1)
-
- Construction (1)
- Dams (1)
- Design (1)
- Design and construction (1)
- Earth climate (1)
- Electric lines (1)
- Electric power transmission (1)
- Energy (1)
- Engineering, Energy, Sustainable energy (1)
- Environmental protection (1)
- Facilities (1)
- Green building (1)
- LEED (1)
- Maine (1)
- Planning (1)
- Rating system (1)
- Saint John River Valley (Me. and Québec) (1)
- Saint John River Watershed (Me.) (1)
- Sustainable energy (1)
Articles 1 - 6 of 6
Full-Text Articles in Power and Energy
Umass Amherst Green Building Guidelines 2013, Ludmilla Pavlova-Gillham, Ted Mendoza, Ezra Small, Patricia O'Flaherty, Nariman Mostafavi, Mohamed Farzinmoghadam, Somayeh Tabatabaee Pozveh
Umass Amherst Green Building Guidelines 2013, Ludmilla Pavlova-Gillham, Ted Mendoza, Ezra Small, Patricia O'Flaherty, Nariman Mostafavi, Mohamed Farzinmoghadam, Somayeh Tabatabaee Pozveh
Campus Planning Reports and Plans
Facilities & Campus Services, Sustainable UMass and Campus Planning support sustainability and energy conservation initiatives by providing in-house resources to campus staff as well as designers and contractors working with the University. The UMass Amherst Green Building Guidelines provide a framework for approaching new construction and major renovation projects at UMass Amherst that are undergoing LEED certification by focusing the conversation on green building aspects that are most important to the campus. They are intended to be the beginning of a dynamic conversation between designers, environmental consultants and constructors, university stakeholders, and users of new high performance buildings.
Hybrid Cooling Systems For Low-Temperature Geothermal Power Production, Andrea Ashwood, Desikan Bharathan
Hybrid Cooling Systems For Low-Temperature Geothermal Power Production, Andrea Ashwood, Desikan Bharathan
Publications (E)
The overall objective of this investigation is to identify and evaluate methods by which the net power output of an air-cooled geothermal power plant can be enhanced during hot ambient conditions using minimal amounts of water.
Geothermal power plants that use air-cooled heat rejection systems experience a decrease in power production during hot periods of the day. This decrease in power output typically coincides with the time when utilities need power to address high air conditioning loads. Hybrid cooling options, which use both air and water, have been studied for this report to assess how they might mitigate the net …
The Very Basics Of Sustainability - An Alternative Viewpoint (Slides With Audio) (Large File! To Speed Up Download, Right-Click On "Download" Link To Save To Own Pc.), Jim Mcgovern
Other resources
This presentation sets out the very basics of ‘sustainability’, although a definition of sustainability is not attempted. Some of the very basics are the context in which the Earth and humankind exist in space and time, the Earth’s climate, the Earth’s population and humankind’s options and choices. The author advocates keeping an open mind on all available options, including the use of oil, gas, coal, tar sands, carbon capture and sequestration, nuclear power etc., as well as the technologies that are more widely considered ‘green’. The author also argues that, in addressing the challenges that humankind faces, globally concerted effort …
Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix J: Coordination With Other Agencies & Public Involvement (Supplement), New England Division, United States Army Corps Of Engineers
Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix J: Coordination With Other Agencies & Public Involvement (Supplement), New England Division, United States Army Corps Of Engineers
Dickey-Lincoln School Lakes Project
This agency will be particularly concerned about any impact which this project might have on any existing, proposed or known units of the National Park System, or any known historic, natural or environmental education sites which are currently part of , or eligible for, the National Landmark Program. This report is a planning aid for the proposed Dickey-Lincoln Dams and Reservoirs project in Maine. A number of endangered, rare, or unique animal species are known or suspected to occur in the project area.
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix B: Alternative Power Transmission Corridors, United States Department Of Energy, United States Department Of The Interior
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix B: Alternative Power Transmission Corridors, United States Department Of Energy, United States Department Of The Interior
Dickey-Lincoln School Lakes Project
This report identifies alternative corridors of land within which transmission lines could be routed and details various impacts on the environment which would be associated with introduction of transmission facilities. Many alternative corridor locations were identified (see Figure 1-1). Identification of these alternative transmission corridors was a complex process, since the number of potential corridors capable of connecting the various substations was myriad; the 'least desirable' potential corridors, i.e., those where transmission facilities might have entailed severest impacts on the environment, had to be eliminated from consideration before alternative corridors could be delineated. Identified alternative corridor locations were subsequently evaluated …
Water Resources Development Project, Saint John River Basin : Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 : Hydrology And Hydraulic Analysis, Section Iv - Lincoln School Dam-Spillway Design Flood, Department Of The Army, New England Division, Corps Of Engineers
Water Resources Development Project, Saint John River Basin : Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 : Hydrology And Hydraulic Analysis, Section Iv - Lincoln School Dam-Spillway Design Flood, Department Of The Army, New England Division, Corps Of Engineers
Dickey-Lincoln School Lakes Project
The first of four sections comprising Design Memo-randum No. 2. The other sections are: II - Dickey Dam - Spillway Design Flood, III - Lincoln School Dam - Spillway Design Flood and IV - Flood Analysis and Reservoir Regulation. la section I, hydro-logic studies will be confined generally to the drainage area of the Saint John River above the gaging station at Fort Kent, Maine. The purpose of section I is to present the climatological and streamflow data for the Saint John River above Fort Kent in order to establish hydrologic criteria for the design of the Dickey and Lincoln …