Open Access. Powered by Scholars. Published by Universities.®

Water Resources Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Water Resources Engineering

From Himalayan Catastrophe To National Resilience: Lessons From The 2026 Bhote Koshi And Trishuli River Floods In Nepal, Keshav Bhattarai, Ambika P. Adhikari Sep 2026

From Himalayan Catastrophe To National Resilience: Lessons From The 2026 Bhote Koshi And Trishuli River Floods In Nepal, Keshav Bhattarai, Ambika P. Adhikari

Himalayan Research Papers Archive

On the morning of 26 August 2026, the mountains above Nepal’s northern frontier delivered a disaster of almost unimaginable speed and scale. A massive mass of ice, rock, and sediment detached in the high Himalayan terrain near the Nepal–Tibet border, descended roughly 1,200 metres, interacted with the Lhende Khola system, and generated a debris-rich flood that surged through the Bhote Koshi and Trishuli river corridors, destroying settlements, markets, roads, bridges, hydropower facilities, and an international border crossing and transforming them into fields of mud, boulders, and wreckage within minutes (ICIMOD, 2026b; Reuters, 2026a). Satellite analysis indicates that a substantial section …


When Words Flow Like Water: How The Enbridge Line 3 Pipeline Environmental Impact Statement Failed To Prevent Hydrogeologic Harm In Minnesota, Carly Gutzmann Jan 2026

When Words Flow Like Water: How The Enbridge Line 3 Pipeline Environmental Impact Statement Failed To Prevent Hydrogeologic Harm In Minnesota, Carly Gutzmann

Journal of Earth and Life Science

For the aquifers of Minnesota, the environmental impact statement (EIS) was a promise of protection that never left the page. An environmental impact statement is meant to be an aid in the decision making process in order to ensure that projects consider potential environmental harms that may occur. However, they are often used instead as another regulatory box to check, rather than as active considerations when planning. As such, a project plan can be flawed from the start—if project developers only consider environmental impacts after they have already put considerable time, effort, and funding into their project as-is, they may …