Articles 1 - 8 of 8

Full-Text Articles in Geotechnical Engineering

Application Of Image Processing In Soil Mechanics, Luke Knodel Apr 2023

Application Of Image Processing In Soil Mechanics, Luke Knodel

Senior Honors Theses

Whenever someone digs a hole in the ground or takes a relaxing walk on the beach, they directly interact with the soil. In its basic form, soil consists of solid, water, and air phases. Unlike water and metals, soil is a particulate media, and the relative proportion of the individual phases significantly influences its physical properties. Various studies have analyzed soil using image processing to determine its morphological properties. Research involving the digital processing of X-ray Computed Tomography (X-ray CT) images of soil to retrieve physically meaningful information is gaining recognition. This study investigates two-dimensional X-ray CT images of unsaturated …


Development Of An Excel Model To Evaluate The Stability Of Slopes, Bradley Davis Dec 2022

Development Of An Excel Model To Evaluate The Stability Of Slopes, Bradley Davis

All Graduate Plan B and other Reports, Spring 1920 to Spring 2023

This objective of this study is to determine a method or tool for taking given slope stability parameters and quickly and effectively determining the factor of safety against sliding of fully softened slopes. This study evaluates the effects of soil and geometric parameters of common slopes, and models these properties in a hypothetical model. The methodology is based on a parametric analysis using the Spencer’s Method of Slices limit equilibrium analysis used in the computer program Slide2. A parametric analysis is performed to determine which soil and/or geometric properties have a high influence on slope stability. The parametric analysis is …


Civil Engineering Design Of Cornhusker Council's Outdoor Education Center, Kelly Weiler Apr 2019

Civil Engineering Design Of Cornhusker Council's Outdoor Education Center, Kelly Weiler

Honors Program: Senior Projects (Public)

A team of geotechnical, structural, hydraulic, environmental, and transportation experts collaborated to provide engineering solutions to the Cornhusker Council in an effort to solve the current problems facing their Outdoor Education Center. This results of this project provided the structural design of three bridges on the property, transportation plans for two parking lots and roadway design, geotechnical recommendations for soil testing and erosion prevention, and an environmental and hydraulic analysis of the property. A major challenge in the design of this project is the consideration of the dangers and regulations that accompany the floodway and floodplain regions on site. Various …


Ncma Groundwater Model Using Usgs Modflow-2005/Pest, Brian Matthew Wallace Jun 2016

Ncma Groundwater Model Using Usgs Modflow-2005/Pest, Brian Matthew Wallace

Master's Theses

A numerical model for the NCMA aquifer complex is presented. The objective of the study is to develop a numerical groundwater model for the NCMA aquifer system to enhance the understanding of subsurface groundwater flow. Infiltration, streamflow, pumping, and return flows are implemented to characterize the aquifer complex over time. The numerical model is calibrated to municipal and monitoring well data, average monthly water balances, and hydraulic contours. Transient aquifer inflows and outflows are assessed in the results of the study and are compared to balance terms from previous studies. The 2007 Todd Engineers Study subsurface inflows and outflows generate …


Late Morning Concurrent Sessions: Innovations In Aviation Technologies: Presentation: Relative Material Loss: A Methodology For Assessing Island Airport Steel Marine Bulkheads, Robert Ernsting, Constantine M. Koursaris Jan 2016

Late Morning Concurrent Sessions: Innovations In Aviation Technologies: Presentation: Relative Material Loss: A Methodology For Assessing Island Airport Steel Marine Bulkheads, Robert Ernsting, Constantine M. Koursaris

Aviation / Aeronautics / Aerospace International Research Conference

A July 2015 report from the Airports Council International – North America (ACI-NA) states “U.S. airports are long overdue for [a] major structural improvement projects. Most U.S. airports are aging, … and because of budgetary restrictions, they’re not aging well.”(Garcia and Clampet, 2015). The average US age is 40 years old with the youngest (Denver International) recently turning 20 years old. As airports continue to age, airport commissioners will struggle to find creative ways to either fund airport replacements or extend the service life of existing airport facilities (commonly referred to as service life extension projects or SLEP). Due to …


2012 Fall Engr333 Project Final Report, 2012 Fall Engr333 Dec 2012

2012 Fall Engr333 Project Final Report, 2012 Fall Engr333

ENGR 333

Calvin College is considering an addition to the West Wing of the Spoelhof Center to provide additional space for the art and business programs. The construction of this new addition provides the opportunity to investigate the feasibility of installing new, sustainable technology. This semester the students of Engineering 333 were presented with the following challenge: “What it will take for Calvin College to install a geothermal HVAC system for the West Wing?” A geothermal HVAC (heating, ventilation, and air conditioning) system utilizes the relatively constant temperature of the earth to provide heating during winter and cooling during summer. Geothermal HVAC …


2012 Fall Engr333 Student Seminar Presentation, 2012 Fall Engr333 Dec 2012

2012 Fall Engr333 Student Seminar Presentation, 2012 Fall Engr333

ENGR 333

File for student presentation, given by students in the Fall 2012 class of ENGR333.


2012 Fall Engr333 Project Assignment, Matthew K. Heun Sep 2012

2012 Fall Engr333 Project Assignment, Matthew K. Heun

ENGR 333

The Fall 2012 ENGR333 project focused on a prospective West Wing addition to the Spoelhof College Center at Calvin University.

I asked the students “What will it take for Calvin College to install a geothermal HVAC system for the West Wing?”

Customer

The customer for this project was Calvin’s VP for finance Henry DeVries.